2029 W. CRONE AVEPermit Types CITY OF ANAHEIMPLMELEMEC8LD
XXXX BUILDING DIVISION
200 S.ANAHEIM BLVD.
(714)765-5153
Permit Number:BLD2022-03921
Issued;08/22/2022
www.anaheim.net/building
(714)765^626
Quarter Section:41
Site Address:2029 W CRONE AVE,ANAHEIM.CA 92804
Legal Description:N TR 2711 BLK LOT 15
APN:12820412
Project Description:Residential Remodel:100 sq ft drywall repair and removal of (1)back door to close opening with electrical,
plumbing,and mechanical upgrades in kitchen
15,000.001Valuation;
Construction Types;
Occuparwy Groups;
Fire Sprinklered:
Total Fees paid for Permit:
Number of Stories;Living Area;
Garage Area:
Carport Area:
Balcony /Deck Area;
Cool Roof:
N/A
No
977.95
People Associated with Project:
Permit Applicant
Owner
Jordan Kahaner
HILL RENAY M 2029 W CRONE AVE
QtyQtyMechanicalFixturesQtyTypePlumbingFixturesElectricalFixturesType
1 Ventilation Fan -<=300 cfm on single duct21Receptacle,switches,lights Dishwasher
1GarbageDisposal
Kitchen Sink 2
The permit shall expire by limitation and become null and void If the building or work has not passed final Inspection 365 days from the
date of permit issuance.A new permit Is required to commence or continue work.
FINAL INSPECTIONS DATE INSPECTORCityofAnaheim
Building Division
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714)765-4280
Do not occupy this building until the final inspections have been made Engineering Final (714)765-5126
INSPECTION DATE INSPECTOR Fire Sprinkler (ONLY)(714)765-5041
Do not pour concrete until the following applicable items have been signed:Fire Dept.Final (714)765-5041
Plumbing (Ground/Underfloor Drain Waste)Water Engineering (714)765-4591
Sub List/Bus.Lie.(714)765-5194 (Allow 10 business days)Electrical Ground Electrode/Ufer
Setback/Forms/Trenches (Footings)COA/Migation Measures
Do not install subfloor or pour floor slab until the foilwing applicable items have been
stoned Building Final (714 765-5153)
Last Inspection-Final Only After Above CompletedPlumbing(Ground/Underfloor Water)
Underfloor Rough Gas
Mechanical (Groundwork)PARTIAL INSPECTIONS
Electrical (Underground Conduit)Building Inspections
Pre-slab (Compaction/Membrane Reinf.)
PERMIT FXPIRFrt
—inspection—
not COMPLETr-
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been_signed: ft:27.--3-3,DATE:1st Floor Shear
Mechanical InspectionsFiresprinkler(Rough)(Fire Dept.)
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)p
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Plumbing InspectionsRoughCOA/Mitagation Measures
Framing (Only after PIbg..Ele.,Mec.&Fire)!(y
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele,Mec &PIbg)
Interior Lath
Electrical InspectionsExteriorLath
Electrical Service Meter-(Meter will be set within 2-3
business days after approval)Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct.,Ele.,or Mec.)
Grease Interceptor
fDr riot i)ri<~k*ii|unless siofied u!f)
Sewer
Water Engineering Backflow (Testable Only)
Water Service