2116 W. CRONE AVEPermit Types CITY OF ANAHEIMPLMMECBLDELE
X X X BUILDING DIVISION
200 5.ANAHEIM BLVD.
17141 765 -5153
Permit Number:BLD2018-03047
Issued:07/13/2018
www.anaheim.net/building
{714)765-4626
Quarter Section:41
Site Address:2116 W CRONE AVE,ANAHEIM,CA 92804
Legal Description;N TR 2537 LOT 72
APN:12819704
Project Description:Residential Remodel;Retile (3)bathrooms with electrical and plumbing to upgrade fixtures.Remove and install {9)
windows and (3)sliders.Install new 200 amp main service panel and tankless water heater Work done prior to permit REF;
INV2018-00334.
5.000.000Valuation:Number of Stories:Living Area;
Garage Area:
Carport Area:
Balcony /DecK Area:
Cool Roof:
Not ApplicableConstructionTypes:
Occupancy Groups:
Fire Sprinklered:
Total Fees paid for Permit:1.488.31
People Associated with Project:
8469 BEACH CIR CYPRESS,CAOwnerVASKENTATARIAN
QtyQtyMechanicalFixturesQtyTypePlumbingFixturesElectricalFixturesType
1 Kitchen SinkMeter/Disc Sw -under 600 V,up to 200
amps
Receptacle,switches,lights
3Lavatory
Shower
33
3
3WaterCloset
1WaterHealer
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit issuance.A new permit is required to commence or continue work.
DATE INSPECTORFINALINSPECTIONS
City of Anaheim
Building Division
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714)765-4280
Do not occupy this building until the final inspections have been made.Engineering Final (714)765-5126
DATE INSPECTORINSPECTION Fire Sprinkler (ONLY)(714)765-5041
Do not pour concrete until the following applicable items have been signed:Fire Dept.Final (714)765-5041
Plumbing (Ground/Underfloor Drain Waste)Water Engineering (714)765-4591
Sub List/Bus.Lie.(714)765-5194 (Allow 10 business days)Electrical Ground Electrode/Ufer
Setback/Forms/Trenches (Footings)COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been!signed Building Final (714 765-5153)
Last Inspection-Final Only After Above CompletedPlumbing(Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspecti^rSRMIT EXPIRED
Mechanical (Groundwork)
Electrical (Underground Conduit)
INSPECTIONPre-slab (Compaction/Membrane Reinf.)
NOT COMPI FTFnFloor(Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)DATE:>0\-'70'm2ndFloor(Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sioned:
1st Floor Shear
Mechanical InspectionsFiresprinkler(Rough)(Fire Dept.)
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Plumbing InspectionsRoughCOA/Mitagation Measures
Framing (Only after PIbg.,Ele.,Mec.&Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele,Mec &PIbg)
Interior Lath
Electrical InspectionsExteriorLath
Electrical Service Meter-(Meter will be set within 2-3
business days after approval)Excludes New
Cnn«;tnirtinn
Exterior Plaster (Brown Coat)
T-Bar (Struct,Ele.,or Mec.)
Grease Interceptor
iDn not harkfill milpss ?,inned off)
Sewer
Water Engineering Backflow (Testable Only)
Water Service