Loading...
2116 W. CRONE AVEPermit Types CITY OF ANAHEIMPLMMECBLDELE X X X BUILDING DIVISION 200 5.ANAHEIM BLVD. 17141 765 -5153 Permit Number:BLD2018-03047 Issued:07/13/2018 www.anaheim.net/building {714)765-4626 Quarter Section:41 Site Address:2116 W CRONE AVE,ANAHEIM,CA 92804 Legal Description;N TR 2537 LOT 72 APN:12819704 Project Description:Residential Remodel;Retile (3)bathrooms with electrical and plumbing to upgrade fixtures.Remove and install {9) windows and (3)sliders.Install new 200 amp main service panel and tankless water heater Work done prior to permit REF; INV2018-00334. 5.000.000Valuation:Number of Stories:Living Area; Garage Area: Carport Area: Balcony /DecK Area: Cool Roof: Not ApplicableConstructionTypes: Occupancy Groups: Fire Sprinklered: Total Fees paid for Permit:1.488.31 People Associated with Project: 8469 BEACH CIR CYPRESS,CAOwnerVASKENTATARIAN QtyQtyMechanicalFixturesQtyTypePlumbingFixturesElectricalFixturesType 1 Kitchen SinkMeter/Disc Sw -under 600 V,up to 200 amps Receptacle,switches,lights 3Lavatory Shower 33 3 3WaterCloset 1WaterHealer The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance.A new permit is required to commence or continue work. DATE INSPECTORFINALINSPECTIONS City of Anaheim Building Division All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714)765-4280 Do not occupy this building until the final inspections have been made.Engineering Final (714)765-5126 DATE INSPECTORINSPECTION Fire Sprinkler (ONLY)(714)765-5041 Do not pour concrete until the following applicable items have been signed:Fire Dept.Final (714)765-5041 Plumbing (Ground/Underfloor Drain Waste)Water Engineering (714)765-4591 Sub List/Bus.Lie.(714)765-5194 (Allow 10 business days)Electrical Ground Electrode/Ufer Setback/Forms/Trenches (Footings)COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been!signed Building Final (714 765-5153) Last Inspection-Final Only After Above CompletedPlumbing(Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspecti^rSRMIT EXPIRED Mechanical (Groundwork) Electrical (Underground Conduit) INSPECTIONPre-slab (Compaction/Membrane Reinf.) NOT COMPI FTFnFloor(Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only)DATE:>0\-'70'm2ndFloor(Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sioned: 1st Floor Shear Mechanical InspectionsFiresprinkler(Rough)(Fire Dept.) 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Plumbing InspectionsRoughCOA/Mitagation Measures Framing (Only after PIbg.,Ele.,Mec.&Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele,Mec &PIbg) Interior Lath Electrical InspectionsExteriorLath Electrical Service Meter-(Meter will be set within 2-3 business days after approval)Excludes New Cnn«;tnirtinn Exterior Plaster (Brown Coat) T-Bar (Struct,Ele.,or Mec.) Grease Interceptor iDn not harkfill milpss ?,inned off) Sewer Water Engineering Backflow (Testable Only) Water Service