Loading...
8255 E. PARK TERRACE LNP\JPe.^Init Types sMECPLMBLDELE XX Permit Number:BLD2021-03820 Issued:08/30/2021 INSPECTION REQUEST LINE: (714)765-4626 Quarter Section:221 CITY OF ANAHEIM BUILDING DIVISION 200 S.ANAHEIM BLVD. (714)765-5153 Site Address:8255 E PARK TERRACE LN Legal Description:N TR 13541 LOT 4 Project Description:Residential Photovoltaic System $20,438.00Valuation: Construcion Types; Fire Sprinklered? Cool Roof Total Fees paid for Permit: N/A, No No 258.66 People Associated with Project: MADISON DARSOWPermitApplicant Contractor 5020 PACHECO BLVD MARTINEZ CA 94553 8255 E PARK TERRACE LN ANAHEIM CA 92808 BETTER EARTH ELECTRIC INC SHARANJIT MANNOwner QtyMechanicalFixturesQtyTypeQtyTypePlumbingFixturesElectricalFixturesType Sub Panel/Temp Pwr -<600 V, <=200 Generators/Transformers -1 to 10 hp,1 to 75 kva 0 <amps 1 1 The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance.A new permit is required to commence or continue work.fbld_permiI_combo > DATE INSPECTORFINALINSPECTIONSCityofAnaheim Building Division All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714)765-4280 Do not occupy this building until the final inspections have been made,Engineering Final (714)765-5126 INSPECTION DATE INSPECTOR Fire Sprinkler (ONLY)(714)765-5041 Do not pour concrete until the following applicable items have been signed:Fire Dept.Final (714)765-5041 Plumbing (Ground/Underfloor Drain Waste)Water Engineering (714)765-4591 Sub List/Bus.Lie.(714)765-5194 (Allow 10 business days)Electrical Ground Electrode/Ufer Setback/Forms/Trenches (Footings)COA/Migation Measures Do not install subfloor or pour floor slab until the foilwing applicable items have been signed:,, Building Final (714 765-5153) Last Inspection-Final Only After Above CompletedPlumbing(Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONSMechanical(Groundwork) Building InspectionsElectrical(Underground Conduit) Pre-slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been signed:,, 1st Floor Shear Mechanical InspectionsFiresprinkier(Rough)(Fire Dept.) 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Plumbing InspectionsRoughCOA/Mitagation Measures Framing (Only after PIbg.,Ele.,Mec.S Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele,Mec &PIbg) Interior Lath Electrical InspectionsExteriorLath Electrical Service Meter-(Meter will be set within 2-3 business days after approval)Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct.,Ele.,or Mec.) Grease Interceptor iDo not backfill unless siuneo q;!1 Sewer Water Engineering Backflow (Testable Only) Water Service Solar PV Standard Plan —Simplified Central/String InverterSystemsfor One-and Two-Family Dwellings OESCRV'IION SOCAHPVM60tl.g<STRMr. NO lirVES.STCPSelBRECmREDlSOURCt;OROJIT BOKINSIAII rOT stp^ie oc nscoHKEci ksiaheu^yvs /#jmjWTHRWALWVERTfROCasCOWtfCTyffi;wo^CENTRAL IWVCRTeR CENTER WSIAU-t-O?YES nCT PV PROOUCTHbN METER R«TA41 cr>T^cT»rSr; ^SEPARATE AC DCCONNECT l>gTAH£brW^CT~>I<7 CON>CCT TOlWERtm f2 fUS£LP«£DIAGRAM 31 ' I SINGLE-UNE DIAGRAM #1 -LOAD SIDE CONNECTION} 3 4 CHECK A ftO*fOR WKETHEPI SYSTEM U GROUNDED OR UHGROONOED;iH^CROUNOCD (INaUOE CEC) REFER TOSUPUFORRAPIOSHUTOOWNDCTAtlS Q UNGROUNDED FORUNCROUMXOSTSTEMS; ●OC OCPOMUST DSCONNECr BOTH COWUCTORS Of EfCH SOURCE ORCUIT -UNGROUNDED COfCUCTORS MUST BE IDENTWIEO KR 1105(0.WHfTE-fIMSHEDCOfOUCTORS ARE HOT PEHMfTTED. i t T f 10 *Con^R a«t<vosA otol AMI and/w Ue»r 3oooH -US I t)C c|iJ<PT>f}Cc(- ^Aloo (t)Jut»thO»l gloTN >V^rJh 3t2- MNa£a>/i●A4M UKVICIil ●USAA MTMC:' MODULES .* wAA AAI JI mMAM lUTM:5;AMOOUIES;^I I A MOOULCS:rvoCNitATlll6:'^C'*t» modules: y.,*i.. Inverter Maker^W' Inverter Model5£3000 H :^;sL£J●o B (NTlIt *h/A*«W«AE SUtTAMt KM Wt€N NOT UUNC COMOUIT 04 CMli AlHRMrmOrrCXKX V I si Rd /UciuibU diiLOAn^cf.■o < o o □ COHDUCTOR/CONOmr SCHEDULE o CONOuaOH coNourr/cABUNUMBEROf CONOUaORSTAGOESCRJPTIONANDCONOuaORTYPE CONDUrSUESIZETYPEO n PV WIREEGC/GEC IOA»/<t PVW><^CAU5E-20 OR il®. Cl o fl<EGC/GEC fa AWiTWwV-1 t I'OreJfl D <9^EGC/GEC (ft /MbTtM'T. c3 T ty lAre 0 /'OVCK^ t H w SOLAR PV STANDARD PLAN Roof Layout Diagram for One-and Two-Family Dwellings o o o S’ o o S ■3 s I liemsMiqiilrodirooftayoulof .ill imnols.modulos.cloarnccoSB ri.illiwayB amJ opproxlm.itc loc.illons ol electricaldisconnccll n<j means.rool access points,and rapid shutdown initiation device.