8255 E. PARK TERRACE LNP\JPe.^Init Types sMECPLMBLDELE
XX
Permit Number:BLD2021-03820
Issued:08/30/2021
INSPECTION REQUEST LINE:
(714)765-4626
Quarter Section:221
CITY OF ANAHEIM
BUILDING DIVISION
200 S.ANAHEIM BLVD.
(714)765-5153
Site Address:8255 E PARK TERRACE LN
Legal Description:N TR 13541 LOT 4
Project Description:Residential Photovoltaic System
$20,438.00Valuation:
Construcion Types;
Fire Sprinklered?
Cool Roof
Total Fees paid for Permit:
N/A,
No
No
258.66
People Associated with Project:
MADISON DARSOWPermitApplicant
Contractor 5020 PACHECO BLVD MARTINEZ CA 94553
8255 E PARK TERRACE LN ANAHEIM CA 92808
BETTER EARTH ELECTRIC INC
SHARANJIT MANNOwner
QtyMechanicalFixturesQtyTypeQtyTypePlumbingFixturesElectricalFixturesType
Sub Panel/Temp Pwr -<600 V,
<=200
Generators/Transformers -1 to 10 hp,1 to
75 kva
0 <amps 1
1
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of
permit issuance.A new permit is required to commence or continue work.fbld_permiI_combo
>
DATE INSPECTORFINALINSPECTIONSCityofAnaheim
Building Division
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714)765-4280
Do not occupy this building until the final inspections have been made,Engineering Final (714)765-5126
INSPECTION DATE INSPECTOR Fire Sprinkler (ONLY)(714)765-5041
Do not pour concrete until the following applicable items have been signed:Fire Dept.Final (714)765-5041
Plumbing (Ground/Underfloor Drain Waste)Water Engineering (714)765-4591
Sub List/Bus.Lie.(714)765-5194 (Allow 10 business days)Electrical Ground Electrode/Ufer
Setback/Forms/Trenches (Footings)COA/Migation Measures
Do not install subfloor or pour floor slab until the foilwing applicable items have been
signed:,, Building Final (714 765-5153)
Last Inspection-Final Only After Above CompletedPlumbing(Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONSMechanical(Groundwork)
Building InspectionsElectrical(Underground Conduit)
Pre-slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been signed:,,
1st Floor Shear
Mechanical InspectionsFiresprinkier(Rough)(Fire Dept.)
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Plumbing InspectionsRoughCOA/Mitagation Measures
Framing (Only after PIbg.,Ele.,Mec.S Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele,Mec &PIbg)
Interior Lath
Electrical InspectionsExteriorLath
Electrical Service Meter-(Meter will be set within 2-3
business days after approval)Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct.,Ele.,or Mec.)
Grease Interceptor
iDo not backfill unless siuneo q;!1
Sewer
Water Engineering Backflow (Testable Only)
Water Service
Solar PV Standard Plan —Simplified
Central/String InverterSystemsfor One-and Two-Family Dwellings
OESCRV'IION
SOCAHPVM60tl.g<STRMr.
NO lirVES.STCPSelBRECmREDlSOURCt;OROJIT BOKINSIAII rOT
stp^ie oc nscoHKEci ksiaheu^yvs /#jmjWTHRWALWVERTfROCasCOWtfCTyffi;wo^CENTRAL IWVCRTeR
CENTER WSIAU-t-O?YES nCT PV PROOUCTHbN METER R«TA41 cr>T^cT»rSr;
^SEPARATE AC DCCONNECT l>gTAH£brW^CT~>I<7
CON>CCT TOlWERtm f2 fUS£LP«£DIAGRAM 31 '
I SINGLE-UNE DIAGRAM #1 -LOAD SIDE CONNECTION}
3
4 CHECK A ftO*fOR WKETHEPI SYSTEM U GROUNDED OR UHGROONOED;iH^CROUNOCD (INaUOE CEC)
REFER TOSUPUFORRAPIOSHUTOOWNDCTAtlS Q UNGROUNDED
FORUNCROUMXOSTSTEMS;
●OC OCPOMUST DSCONNECr BOTH COWUCTORS Of EfCH SOURCE ORCUIT
-UNGROUNDED COfCUCTORS MUST BE IDENTWIEO KR 1105(0.WHfTE-fIMSHEDCOfOUCTORS ARE HOT PEHMfTTED.
i
t
T
f
10
*Con^R a«t<vosA otol AMI and/w Ue»r
3oooH -US
I t)C
c|iJ<PT>f}Cc(-
^Aloo (t)Jut»thO»l gloTN
>V^rJh 3t2-
MNa£a>/i●A4M UKVICIil
●USAA MTMC:'
MODULES .*
wAA AAI JI mMAM
lUTM:5;AMOOUIES;^I I
A
MOOULCS:rvoCNitATlll6:'^C'*t»
modules:
y.,*i..
Inverter Maker^W'
Inverter Model5£3000 H :^;sL£J●o B
(NTlIt *h/A*«W«AE SUtTAMt KM
Wt€N NOT UUNC COMOUIT 04 CMli
AlHRMrmOrrCXKX
V I si Rd /UciuibU
diiLOAn^cf.■o
<
o
o □
COHDUCTOR/CONOmr SCHEDULE
o CONOuaOH coNourr/cABUNUMBEROf
CONOUaORSTAGOESCRJPTIONANDCONOuaORTYPE CONDUrSUESIZETYPEO
n PV WIREEGC/GEC IOA»/<t PVW><^CAU5E-20 OR il®.
Cl
o fl<EGC/GEC fa AWiTWwV-1 t I'OreJfl
D <9^EGC/GEC (ft /MbTtM'T.
c3 T ty lAre
0 /'OVCK^
t H
w
SOLAR PV STANDARD PLAN
Roof Layout Diagram for One-and Two-Family Dwellings
o
o
o
S’
o
o
S
■3
s
I
liemsMiqiilrodirooftayoulof .ill imnols.modulos.cloarnccoSB
ri.illiwayB amJ opproxlm.itc loc.illons ol electricaldisconnccll n<j
means.rool access points,and rapid shutdown initiation device.