99-140RESOLUTION NO. 99R- 140
A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF ANAHEIM ADOPTING NEW FEE SCHEDULES FOR
BUILDING AND CONSTRUCTION.
WHEREAS, Section 15.02.070 of the Anaheim Municipal
Code authorizes the City Council to establish fees for permits,
inspections, re-inspections and other activities relating to the
Uniform Codes pertaining to the regulation of building and
construction activities; and
WHEREAS, the City Council does desire to adopt new fee
schedules for those building and construction activities; and
WHEREAS, the City Council has considered said proposed
fees at a public meeting notice of which has heretofore been
given in the manner required by Section 66016 of the Government
Code and at which meeting oral and written presentations were
invited and considered concerning said fee and service charge
increases; and
WHEREAS, the City Council finds and declares that
adoption of this fee schedule is exempt from the provisions of
the California Environmental Quality Act pursuant to Section
21080(b)(8) of the Public Resources Code and California Code of
Regulations Section 15273 in that the fees and rates are
established to meet operating expenses, including employee wage
rates and fringe benefits; purchasing or leasing supplies,
equipment or materials; and
WHEREAS, the City Council further finds that the
hereinafter specified fees and services charges do not exceed the
estimated amount required to provide the service for which the
fee or service charge is levied.
NOW, THEREFORE, BE IT RESOLVED by the City Council of
the City of Anaheim as follows:
1. The fees set forth in the following fee schedules
shall be, and the same are hereby, adopted:
Anaheim Building Code:
Building Permit Fees,
attached as Exhibit A
Anaheim Electrical Code:
Electrical Permit Fees,
attached as Exhibit B
-]-
Anaheim Mechanical Code:
Mechanical Permit Fees,
attached as Exhibit C
Anaheim Plumbing Code:
Plumbing Permit Fees,
attached as Exhibit D
2. The fees established herein shall become effective
sixty (60) days following the date of adoption of this
Resolution.
3. The fees established herein shall, upon the
effective date of said fees, supercede any previously adopted
fees for the same permit or approval.
4. The City Council hereby declares that should any
one or more fees established by this Resolution or any portion of
this Resolution be declared for any reason to be invalid, it is
the intent of the City Council that it would have adopted all
other fees and portions of this Resolution independent of the
elimination herefrom of any such fee or such portion as may be
declared invalid.
THE FOREGOING RESOLUTION is approved and adopted by the
City Council of the City of Anaheim this 22ha day of
June , 19 9 9.
MAYOR OF TH~EIM
ATTEST:
CI t~RKO~F' THE CITY OF ANAHEIM
30748.2\SMANN
-2-
Exhibit A
BUILDING PERMIT FEES
TOTAL BUILDING VALUATION
FEE
$1.00 to $500.00
$29.00
$501.00~$2,000.00
$29.00 for the first $1,200.00
plus $2.75 for each additional $100.00 or fraction
hereof, up to and including $2,000.00
$2,001.00 to $25,000.00
$62.25 for the first $2,000.00
plus $12.50 for each additional $1,000.00 or fraction
thereof, up to and including $25,000.00
$25,001.00~$50,000.00
$349.75 for the first $25,000.00
plus $9.00 for each additional $1,000.00 or fraction
thereof, up to and including $50,000.00
$50,001.00~$100,000.00
$574.75 for the first $50,000.00
plus $6.25 for each additional $1,000.00 or fraction
thereof, up to and including $100,000.00
$100,001.00~$500,000.00
$887.25 for the first $100,000.00 plus
plus $5.00 for each additional $1,000.00 or fraction
thereof, up to and including $500,000.00
$500,001.00~$1,000,000.00
$2,887.25 for the first $500,000.00
plus $4.25 for each additional $1,000.00 or fraction
thereof, up to and including $1,000,000.00
$1,000,001.00 and up
$5,012.25 for the first $1,000,000.00
plus $2.75 for each additional $1,000.00 or fraction
thereof
PLAN CHECKING FEE
When the valuation of the proposed construction exceeds $1,000.00 and a plan is required to be
submitted by Section 106.3.2 of the Building Code, the following Plan Checking fee shall be paid
to the Building Official at the time of submitting plans and specifications for checking.
Residential plan checking
80% of Building Permit fee
Non-Residential plan checking
80% of Building Permit fee
Repetitive plan review
(for similar units after model fee is paid)
50% of Plan Check fee
When plans are incomplete or changed so as to require additional plan checking, an additional
Plan Check fee shall be charged at a rote established by the Building Official.
Page 2 - BUILDING PERMIT FEES
FEES FOR ALL OTHER INSPECTIONS AND PERMITS
Inspections outside normal business hours for normal working days
(minimum charge: 2 hours)
Weekend inspections (minimum charge: 4 hours)
Re-inspection fees and inspections for which no fee is
specifically indicated (minimum charge: 1 hour)
Additional plan review required by changes, additions or revisions
to approved plans (minimum charge: 1 hour)
Special inspections and investigative inspections
Additional plan review required by changes, additions or revisions
to approved plans (minimum charge: 1 hour)
For issuing each permit
Supplement to existing permit
Minimum permit fee
Temporary Utilities:
first and second requests, each
additional requests, each
Temporary Certificate of Occupancy:
first and second requests, each
additional requests, each
$47.00 per hour
$47.00 per hour
$47.00 per hour
$47.00 per hour
$47.00 per hour
$47.00 per hour
$2o.oo
$1o.oo
$3o.oo
$75.00
$150.00
$100.00
$200.00
Appeal Board application $450.00
Exhibit B
ELECTRICAL PERMIT FEES
NEW RESIDENTIAL BUILDINGS
w
New multiple-family residential buildings (apartments,
condominiums, hotels and motels)
New single and two family buildings
Garages, carports (attached or detached), parking structures
For other types of residential alterations, additions and
modifications to existing buildings, see Unit Fee Schedule, below
$0.045 per square foot
$0.05 per square foot
$0.02 per square foot
TEMPORARY POWER
1. Temporary service pole or pedestal including meters $22.00
2. Temporary sub poles including switches and outlets $22.00
3. Temporary trailer inspection (pre-site) $47.00
UNIT FEE SCHEDULE (receptacles, switches and lighting outlets)
1. First 20 outlets, switches and/or fixtures $1.00
2. Additional outlets, each $0.65
3. Multiple-outlet assemblies, each 5 feet or fraction thereof
may be considered as one outlet $0.65
4. Pole lights and fixtures, each $1.00
5. Each additional fixture $1.00
6. Theatrical type lighting fixtures, each $1.00
RESIDENTIAL APPLIANCES
For fixed residential appliances or receptacle outlets including wall mounted
electric ovens; counter mounted cooking tops; electdc ranges;
self-contained room, console or through wall air conditioners; space heaters;
food waste grinders; dishwashers; washing machines; water heaters;
clothes dryers; and other motor operated appliances not exceeding
one HP in rating, each $4.25
Page 2 - ELECTRICAL PERMIT FEES
NON-RESIDENTIAL APPLIANCES
For non-residential appliances and self-contained factory wired
appliances not exceeding one horsepower (HP), kilowatt (KW) or
kilovoltampere (KVA) in rating including medical and dental devices,
food, beverage and ice cream cabinets, illuminated show cases,
drinking fountains, vending machines, laundry machines, or
other similar types of equipment, each $4.25
POWER APPARATUS (as listed)
For motors, generators, transformers, recti~ers, synchronous converters, capacitors, industrial
heating, air conditioners and heat pumps, cooking or baking equipment and other apparatus.
Up to and including one each
Over one and not over 10 each
Over 10 and not over 50 each
Over 50 and not over 100 each
Over 100 and not over 500 each
Over 500 each
$4.25
$11.00
$22.00
$44.25
$66.50
$66.50
BUSWAYS
Trolley and plug-in busways, each 100 feet or fraction thereof $5.00
Note: An additional fee will be required for lighting fixtures, motors and other appliances that are
connected to trolley and plug-in type busways.
SIGNS, OUTLINE LIGHTING AND MARQUES
1. One sign and one transformer $22.00
2. Additional sign and transformer per address $10.00
3. Additional transformers per sign $4.50
4. Additional circuits per sign $4.25
5. Alterations to existing signs $10.00
6. Relocation of existing signs $15.00
7. Time clocks, each $3.00
Page 3 - ELECTRICAL PERMIT FEES
SERVICES. METERS, PANELS. DISCONNECT SWITCHES
1. For services of 600 volts or less, and not over 200 amps, each $27.25
2. For services of 600 volts or less, and over 200 amps and up to
500 amps, each $55.50
3. For services over 600 volts or over 1000 amps, each $111.00
MISCELLANEOUS APPARATUS. CONDUITS AND CONDUCTORS. ELECTRICAL
COMPONENTS FOR WHICH A PERMIT IS REQUIRED BUT FOR WHICH NO FEE IS HEREIN
SET FORTH
1. Apparatus or equipment, each $16.25
2. Conduits and conductors for each 50 feet or fraction thereof $16.25
3. Pdvate street lights $18.00
4. Under floor raceways, for each 100 feet or fraction thereof $10.00
p:\dedcalVesol\97fees.doc/050799pg6-8
Exhibit C
MECHANICAL PERMIT FEES
4
11.
12.
Heating appliances, including vent:
Up to 100,000 BTU/H, each
100,000 BTU/H and over, each
$13.25
$16.25
Residential air circulation outlets (heating or cooling), each
Commercial air distribution system (heating, cooling or ventilation)
per 100 sq. ft. each
Combustion products vent (other than chimney and not included in
appliance permit), each
Factory built or metal chimney, each
Compressor or boiler (includes built-in window type air conditioners):
To 3 HP $13.15
3 to 15 HP $24.25
15 to 30 HP $33.25
30 to 50 HP $49.50
Over 50 HP $82.75
Absorption Unit:
To 100,000 BTU/H
100,001 to 500,000 BTU/H
500,001 to 1,000,000 BTU/H
1,000,001 to 1,750,000 BTU/H
Over 1,750,000 BTU/H
$13.15
$24.25
$33.25
$49.50
$82.75
Air handling unit (heating, cooling or ventilation supply):
Up to 10,000 CFM, each
Over 40,000 CFM, each
$9.50
$t6.15
Evaporative cooler (other than portable), each $9.50
Ventilation fans to 300 CFM on single duct
(including dryer exhaust duct), each
$6.50
Ventilation fans 301 CFM and over, each
$9.50
Commercial hood (including ducts), each
$20.00
$6.50
$8.O0
$9.50
$9.50
Page 2 ~ MECHANICAL PERMIT FEES
13.
14.
15.
16.
17.
Heating or cooling coils (not part of factory
assembled unit), each: $12.25
(V.A.V. unit, cooling tower, evaporative or air cooled condenser)
Appliance or piece of equipment regulated by the
Anaheim Mechanical Code but not specifically
classed or listed, each
$9.50
Gas system: 1 to 5 outlets, each
each additional outlet over 5
$5.00
$1.00
Fire Dampers, each
$9.5O
Central vacuum systems, each
$9.50
Unlimited gas appliance
$44.25
Exhibit D
PLUMBING PERMIT FEES
UNIT FEE SCHEDULE
1. Plumbing fixture including water, drainage piping and
backwater valve, each $7.00
2. Building sewer and trailer space sewer, each:
first 100 feet
each additional 100 feet
3. Abandonment/close sewer
4. Rainwater systems (per drain inside building)
5. Pdvate sewage disposal system, each
6. Water heater and/or vent, each
7. Gas-piping system of 1 to 5 outlets, each
8. Additional gas piping system outlet, per outlet
9. Medical gas system of 1 to 5 inlets/outlets, each
10. Additional medical gas inlets/outlets, each
11. Industrial waste pretreatment interceptor including its
trap and vent, excepting kitchen-type grease interceptors
functioning as fixture traps, each $7.00
12. Installation, alteration or repair of water piping and/or
water treating equipment, each $7.00
13. Repair or alteration of drainage or vent piping, each fixture $7.00
14. Atmospheric-type vacuum breakers (lawn sprinklers):
15.
$15.00
$7.00
$15.00
$7.00
$40.00
$7.00
$5.00
$1.00
$47.00
$5.OO
1 to 5: $5.00
over 5, each $1.00
Backflow protective devices other than atmospheric type vacuum breakers, each:
2 inch diameter and smaller $7.00
over 2 inch diameter $15.00
Page 2 - PLUMBING PERMIT FEES
16.
Building water service, each:
first 100 feet
additional building water service, per 100 feet
$7.O0
$7.00
MISCELLANEOUS FIXTURES
Solar panels and solar tanks, water softener, water treatment
equipment, each
Gray water system
Initial installation and testing for a reclaimed water system
Annual cross-connection test
$7.00
$47.00
$47.00 perhour
$47.00
SWIMMING POOL AND SPA PIPING SYSTEMS
1. All pool piping and gas (one outlet, does not include pool solar) $47.00
POOL AND SPA FEES
1. Structural
Plan Check (not required for fiberglass spa)
Pool and Spa pre-site inspection and plan check
Plumbing (includes all pool piping, except solar),
one gas outlet, backwash lines, backwash
receptor/P-Trap, pool fill line, and backflow protection
5. Electrical: Residential
Commercial
per Building Permit Fees
(Exhibit A)
valuation of work
65% of Structural, above
$47.00
$47.OO
$47.00
$7O.00
p:\cledcal~resol\97fees.doc
STATE OF CALIFORNIA )
COUNTY OF ORANGE ) ss.
CITY OF ANAHEIM )
I, LEONORA N. SOHL, City Clerk of the City of Anaheim, do hereby certify that the foregoing
Resolution No. 99R-140 was introduced and adopted at a regular meeting provided by law, of the
Anaheim City Council held on the 22nd day of June 1999, by the following vote of the members
thereof:
AYES:
NOES:
ABSENT:
MAYOR/COUNCIL MEMBERS: Feldhaus, Kring, McCracken, Daly
MAYOR/COUNCIL MEMBERS: Tait
MAYOR/COUNCIL MEMBERS: None
AND I FURTHER CERTIFY that the Mayor of the City of Anaheim signed said Resolution
No. 99R-140 on the 22nd day of June, 1999.
IN WITNESS WHEREOF, I have hereunto set my hand and affixed the official seal of the City of
Anaheim this 22nd day of June, 1999.
CITY CLERK OF THE CITY OF ANAHEIM
(SEAL)
I, LEONORA N. SOHL, City Clerk of the City of Anaheim, do hereby certify that the foregoing is
the original of Resolution No. 99R-140 was duly passed and adopted by the City Council of the
City of Anaheim on June 22nd, 1999.
CITY CLERK OF THE CITY OF ANAHEIM