6574ORDINANCE NO. 6 5 7 4
AN ORDINANCE OF THE CITY COUNCIL OF THE
CITY OF ANAHEIM APPROVING AND ADOPTING AN
AMENDMENT TO THE ANAHEIM RESORT SPECIFIC
PLAN NO. 92-2
(AMENDMENT NO. 17 TO THE ANAHEIM RESORT
SPECIFIC PLAN)
(DEV2021-00069)
WHEREAS, pursuant to the City's police power, as granted broadly under Article
XI, Section 7 of the California Constitution, the City Council of the City of Anaheim ("City
Council") has the authority to enact and enforce ordinances and regulations for the public peace,
morals and welfare of the City of Anaheim (the "City") and its residents; and
WHEREAS, on April 29, 1986, the City Council adopted Ordinance No. 4709 to
establish uniform procedures for the adoption and implementation of Specific Plans for the
coordination of future development within the City, and "Zoning and Development Standards"
when the Specific Plan includes zoning regulations and development standards to be substituted
for existing zoning regulations and development standards under the Zoning Code, which "Zoning
and Development Standards" shall be adopted by ordinance independent of the rest of the Specific
Plan; and
WHEREAS, pursuant to the procedures set forth in Chapter 18.72 (formerly,
Chapter 18.93) of the Anaheim Municipal Code, on September 27, 1994, the City Council adopted
Ordinance No. 5454 amending the zoning map to reclassify approximately 549.5 acres of certain
real property described therein into the Anaheim Resort Specific Plan (ARSP) No. 92-2 Zone
subject to certain conditions as specified therein, and Ordinance No. 5453 relating to establishment
of Zoning and Development Standards for the Anaheim Resort Specific Plan No. 92-2 by the
addition of Chapter 18.48 [subsequently renumbered as Chapter 18.116] to said Municipal Code
(referred to herein as "ARSP Zoning and Development Standards"); and
WHEREAS, the ARSP provides a long-range, comprehensive plan for future
development within The Anaheim Resort, an area of the City designated on the General Plan for
Commercial Recreation land uses. The Specific Plan includes a land use plan, zoning and
development standards, design guidelines and a public facilities plan and permits the development
of hotel, convention, retail, and other visitor -serving uses as well as the infrastructure
improvements that are needed to support future development; and
WHEREAS, in connection with the adoption of the ARSP and related actions
(General Plan Amendment, The Anaheim Resort Identity Program and The Anaheim Resort Public
Realm Landscape Program), the City Council certified Master Environmental Impact Report
(MEIR) No. 313, with a Statement of Findings and a Statement of Overriding Considerations, and
adopted Mitigation Monitoring Program (MMP) No. 0085 by adopting Resolution No. 94R-234
on September 20, 1994. Since being certified in 1994, two validation reports were prepared (1999
and 2004) to evaluate the continued relevance and accuracy of MEIR No. 313; and
WHEREAS, since the adoption of the ARSP, the City Council has adopted fourteen
(14) amendments and thirteen (13) zoning code adjustments, and two (2) amendment requests have
been submitted and subsequently withdrawn, which have expanded the total acreage of the ARSP
area to approximately 581.3 acres; and
WHEREAS, in support of Amendment No. 14 to the ARSP to update the ARSP to
reflect development conditions and regulations, increase the maximum allowable square footage
in the Public Recreational (PR) District to accommodate the future expansion of the Anaheim
Convention Center and replace the conditions of approval contained in Ordinance No. 5454 with
MMP No. 85C in conjunction with related actions (General Plan Amendment, Zoning Code
Amendment, The Anaheim Resort Identity Program Amendment and The Anaheim Resort Public
Realm Landscape Program Amendment), the City Council certified Supplemental EIR No. 2008-
340 (Supplemental EIR No. 340), which is a Supplemental EIR to MEIR No. 313, and approved
MMP No. 85C by adopting Resolution No. 2012-158 on December 18, 2012. Since being certified
in 2012, a validation report was prepared in 2019 to evaluate the continued relevance and accuracy
of SEIR No. 340; and
WHEREAS, the City Council did receive a verified application from Walt Disney
Parks and Resorts U.S., Inc. ("Disney") for an amendment to The Disneyland Resort Specific Plan
(DRSP) No. 92-2 in conjunction with approval of the proposed DisneylandForward Project and
related entitlements (collectively known as "Development Application No. 2021-00069" or the
"Project"), for certain real property primarily located within an area known as The Anaheim
Resort®, a 1,078-acre portion of the City especially designated by the City's General Plan for
Commercial Recreation land uses and generally located west of the I-5 freeway, south of Vermont
Avenue, east of Walnut Street, and north of Chapman Avenue, and also including areas identified
in the General Plan as planned extensions of Gene Autry Way between Harbor Boulevard and
Haster Street and Clementine Street between Katella Avenue and Orangewood Avenue, portions
of which are outside of The Anaheim Resort, in the City of Anaheim, County of Orange, State of
California, as generally depicted on the map attached hereto as Exhibit A (the "Property") and
incorporated herein by this reference; and
WHEREAS, properties owned or leased by Walt Disney Parks and Resorts U.S.,
Inc. or subsidiaries of the Walt Disney Company within the DRSP and ARSP are depicted on
Exhibit B ("Disney Properties"); and
WHEREAS, properties owned or leased by Walt Disney Parks and Resorts U.S.,
Inc. or subsidiaries of the Walt Disney Company within the ARSP and are listed below:
0 1515 S. Manchester Avenue (currently used as the Manchester Cast Member
Lot);
• 1585 S. Manchester Avenue (currently occupied by an office building and also
used as the Manchester Cast Member Lot);
• 1530 S. Harbor Boulevard (currently used as the Manchester Cast Member
Lot);
• 1900 S. Harbor Boulevard (currently used as the Toy Story Parking Lot);
• 333 W. Ball Road (currently used as the Harbor Cast Member Lot); and,
• 1717 S. Disneyland Drive (Paradise Pier Hotel, recently renamed "Pixar Place
Hotel"); and
WHEREAS, to the extent the Project would update The Anaheim Resort Public
Realm Landscape Program, The Anaheim Resort Identity Program and the Anaheim Commercial
Recreation Area Maximum Permitted Structural Height Map, the Project site includes the entire
Anaheim Resort (inclusive of the ARSP, DRSP, and Hotel Circle Specific Plan No. 93-1); and
WHEREAS, the DisneylandForward Project is proposed to allow continued, long-
term growth of The Disneyland Resort. The Project would allow the transfer of uses permitted
under The Disneyland Resort Project to Disney Properties in other areas of the DRSP and the
ARSP. It would also allow future streamlined review of Disney development projects in these
areas. The Project would not increase the amount of development square footage or hotel rooms
currently allowed in the DRSP and analyzed in EIR No. 311, which the City certified in 1993, and
Addendum No. 1 to EIR No. 311, which the City approved in 1996, or the number of hotel rooms
currently allowed in the ARSP and analyzed in Supplemental EIR No. 340, which the City certified
in 2012. However, it would permit an increase of 4,376 theme park employee parking spaces in
the ARSP and provide for future administrative review by the City of Disney's development
projects on Disney Properties within the DRSP and the ARSP. It would also modify the limits of
the existing Theme Park and Hotel District boundaries within the existing DRSP perimeter (these
two Districts would be combined and the expanded District would be called the Theme Park
District) and rename the Future Expansion District to the Southeast District within the DRSP. It
would also establish Overlays for Disney Properties in the ARSP (Theme Park East Overlay,
Theme Park West Overlay and Parking Overlay). Disney is not seeking additional square footage
for theme park uses or retail entertainment uses or additional hotel rooms within The Disneyland
Resort as part of this Project. Instead, the Project would allow Disney to move the existing
Disneyland Resort approvals for these uses to other Disney Properties governed by the DRSP and
ARSP; and
WHEREAS, the DisneylandForward Project includes the following entitlements,
which shall be referred to herein collectively as the "Project":
1. An amendment to the Land Use and Circulation Elements of the General
Plan and the City's Bicycle Master Plan, to revise maps, figures, text and tables throughout the
General Plan to conform to the following changes:
a. An amendment to the Land Use Element, Table LU-4, "General
Plan Density Provisions for Specific Areas of the City" describing the amended DRSP and ARSP
District names, new Overlays and associated density;
b. An amendment to the Circulation Element to (1) remove the planned
future extensions of Clementine Street between Katella Avenue and Orangewood Avenue and
Gene Autry Way between Harbor Boulevard and Haster Street; and (2) reclassify Disney Way
between Anaheim Boulevard and Harbor Boulevard from a six -lane Major Arterial to a four -lane
Primary Arterial (with no change to the width of the ultimate public right-of-way);
C. An amendment to the Circulation Element to reflect the following
intersection lane configurations (1) at Harbor Boulevard and Convention Way, provide two left -
turn lanes, one shared through/right-turn lane, and one exclusive right -turn lane on the eastbound
approach and one left -turn lane, one shared through/right-turn lane, and one exclusive right -turn
lane on the westbound approach (consistent with existing configuration); and, (2) at Haster Street
and Gene Autry Way, provide a single shared left-turn/through/right-turn lane for the eastbound
approach and three left -turn lanes and two right -turn lanes for the westbound approach. The
northbound approach would be equipped with a right -turn signal overlapping with the westbound
left -turn signal phase;
d. An amendment to the Circulation Element and the City's Bicycle
Master Plan (1) to remove the Class I Bike Path in the Southern California Edison right-of-way
between Harbor Boulevard and Anaheim Boulevard and add a Class I Bike Path on the north side
of Disney Way between Clementine Street and Anaheim Boulevard; (2) to add a Class I Bike Path
on the west side of Clementine Street between Alro Way and Disney Way (limits subject to change
based on final location of a bike parking facility); and (3) to modify the classification of the
planned bike facility on Walnut Street between Katella Avenue and Ball Road from Class II Bike
Lanes to a Class I Bike Path on the east side of Walnut Street;
2. Amendment No. 9 to the DRSP and the DRSP Zoning and Development
Standards (Anaheim Municipal Code Chapter 18.114), which would comprehensively update text,
graphics, and imagery throughout the documents to reflect the Project;
3. Amendment No. 17 to the ARSP and the ARSP Zoning and Development
Standards (Anaheim Municipal Code Chapter 18.116), which would comprehensively update text,
graphics, and imagery throughout the documents to reflect the Project, including approval of the
Theme Park East Overlay, the Theme Park West Overlay and the Parking Overlay;
4. An amendment to Chapter 18.40 (General Development Standards) of Title
18 of the Anaheim Municipal Code to amend the Anaheim Commercial Recreation Area
Maximum Permitted Structural Height Map (Anaheim Municipal Code Section 18.40.080
(Structural Height Limitations — Anaheim Commercial Recreation Area)) which would provide
for the DRSP to regulate building heights within a larger portion of the DRSP Theme Park District
and the Southeast District and for the ARSP to regulate building heights within the ARSP Theme
Park East and West Overlays;
5. Amendment No. 6 to The Anaheim Resort Public Realm Landscape
Program which would comprehensively update text, graphics and imagery throughout the
document to reflect current conditions in The Anaheim Resort, expand The Anaheim Resort
planting palette to include additional plantings that are more climate appropriate, low water using,
disease and pest resistant, and native to Southern California and include information pertaining to
pedestrian bridges/crossings and pedestrian and bicycle paths, in conjunction with the Project;
6. Amendment No. 4 to The Anaheim Resort Identity Program which would
comprehensively update text, graphics and imagery throughout the document to reflect current
conditions in The Anaheim Resort and include information pertaining to Arrival Gateways,
Pedestrian Bridge/Crossings and Minor Pedestrian Directional and Informational Signs, in
conjunction with the Project;
7. First Amended and Restated Development Agreement No. 96-01 between
the Walt Disney World Co. (renamed Walt Disney Parks and Resorts U.S., Inc. in 2009) and the
City of Anaheim to provide continued certainty to Disney to facilitate growth and investment in
The Disneyland Resort and specified benefits to the City; and
WHEREAS, Amendment No. 17 to the Anaheim Resort Specific Plan No. 92-2,
including amendments to Chapter 18.116 (Anaheim Resort Specific Plan No. 92-2 (SP92-2)
Zoning and Development Standards), has been prepared and submitted for the City's consideration
pursuant to the procedures set forth in Chapter 18.72 of the Anaheim Municipal Code and is on
file with the City of Anaheim Planning and Building Department and incorporated herein by this
reference as if set forth in full; and
WHEREAS, Amendment No. 17 to the Anaheim Resort Specific Plan would
update the ARSP to reflect proposed modifications to The Disneyland Resort Project. It would
allow for the transfer of Disneyland Resort Project theme park and parking uses permitted under
the DRSP to Disney Properties in the ARSP. This includes the potential transfer of DRSP theme
park uses to the proposed new ARSP Theme Park East and Theme Park West Overlays and the
potential transfer of parking uses from the DRSP Parking District to the adjacent proposed new
ARSP Parking Overlay. It would also provide for an increase of 4,376 theme park -related parking
spaces in the proposed ARSP Parking Overlay. The amendment would also provide for future
administrative review by the City of Disney's development projects on Disney Properties within
the ARSP. It would also include modifications to the ARSP document (including, but not limited
to, the land use plan, zoning and development standards, design plan and public facilities plan and
a revised phasing plan); and, incorporation of text and graphic modifications throughout the
document; and
WHEREAS, pursuant to and in accordance with the provisions of the California
Environmental Quality Act (Public Resources Code Section 21000 et seq.; herein referred to as
"CEQA"), the State of California Guidelines for Implementation of the California Environmental
Quality Act (Title 14 of the California Code of Regulations; herein referred to as the "CEQA
Guidelines"), the City is the "lead agency" for the preparation and consideration of environmental
documents for the Project; and
WHEREAS, the Planning Commission did hold a public hearing at the Civic Center
in the City of Anaheim on March 11, 2024, at 5:00 p.m., and notice of said public hearing having
been duly given as required by law and in accordance with the provisions of Chapter 18.60
(Procedures) of the Code, to hear and consider evidence and testimony concerning the contents
and sufficiency of Final Subsequent EIR (SEIR) No. 352, including all written and verbal
comments received during the 45-day public review period, the Project, and related actions, and
to investigate and make findings and recommendations in connection therewith; and
WHEREAS, at said public hearing and based upon its independent review, analysis,
and consideration of the environmental information contained in Final SEIR No. 352 to EIR No.
311 and Supplemental EIR No. 340 prepared in connection with the Project, the Planning
Commission found substantial evidence in the record to support its actions and did adopt its
Resolution No. PC2024-004 finding and recommending that the City Council certify Final
Subsequent EIR No. 352 (Final SEIR No. 352) to EIR No. 311 and Supplemental EIR No. 340,
including the adoption of Findings and a Statement of Overriding Considerations and Mitigation
Monitoring Program No. 387 (MMP No. 387), and determining that (i) Final SEIR No. 352 was
prepared for the Project in compliance with the requirements of the CEQA and all applicable
CEQA Guidelines; (ii) Final SEIR No. 352 reflects the independent judgment and analysis of the
City; (iii) Final SEIR No. 352 is adequate to serve as the appropriate environmental documentation
for the Project satisfying the requirements of CEQA supplemental review; and, (iv) no further
environmental documentation needs to be prepared for CEQA for the Project; and
WHEREAS, the Planning Commission, after due consideration, inspection,
investigation and study made by itself and in its behalf, and after due consideration of all evidence
and reports offered at said hearing with respect to the request for the Project, recommended that
the City Council approve and adopt Amendment No. 17 to the Anaheim Resort Specific Plan No.
92-2, as proposed as part of DEV2021-00069; and
WHEREAS, upon receipt of a summary of evidence, and a report of findings and
recommendations of the Planning Commission, the City Council did fix the 16th day of April,
2024, as the time, and the City Council Chamber in the Civic Center as the place for a public
hearing on the Project, including Amendment No. 17 to the Anaheim Resort Specific Plan No. 92-
2, and for the purpose of considering Final SEIR No. 352 and the Project, and did give notice
thereof in the manner and as provided by law and in accordance with the provisions of Chapter
18.60 of the Code, to hear and consider evidence for and against the Project; and
WHEREAS, on April 16, 2024, the City Council did hold and conduct such public
hearing and did give all persons interested therein an opportunity to be heard, and did receive
evidence and reports and did consider the Project, including recommendations of the Planning
Commission, potential environmental impacts addressed in Final SEIR No. 352, the Findings and
Statement of Overriding Considerations, and Mitigation Monitoring Program No. 387; and
WHEREAS, by Resolution No. 2024-029, considered on April 16, 2024 and
approved by the City Council on April 17, 2024 concurrently with but prior in time to
consideration of this Ordinance, the City Council has heretofore certified FSEIR No. 352 to Final
EIR No. 311 and Supplemental EIR No. 340 prepared in connection with the Project and
concurrently adopted Findings and a Statement of Overriding Considerations and Mitigation
Monitoring Program (MMP) No. 387 as the mitigation monitoring program for the Project and
determined that: (i) FSEIR No. 352 was
prepared for the Project in compliance with the requirements of CEQA and all applicable CEQA
Guidelines; (ii) FSEIR No. 352 and MMP No. 387 are adequate to serve as the appropriate
environmental documentation for the Project; and, (iii) no further environmental documentation
needs to be prepared for CEQA for this Project; and
WHEREAS, the City Council, and after due consideration, inspection,
investigation and study made by itself and in its behalf and after due consideration of all evidence
and reports offered at said hearing with respect to the request for the Project, the City Council does
hereby find and determine that all of the following conditions exist with respect to proposed
Amendment No. 17 to the Anaheim Resort Specific Plan No. 92-2:
1. That the property proposed for the specific plan amendment has unique site
characteristics, such as topography, location or surroundings that are enhanced by special land use
and development standards. The ARSP is located in an area of the City known as The Anaheim
Resort, which is designated on the City of Anaheim General Plan for Commercial Recreation land
uses. The Commercial Recreation designation is implemented by three Specific Plans, including
the ARSP, and is intended to provide for tourist and visitor -serving uses. The proposed amendment
would not change the boundaries of the existing ARSP.
2. That the specific plan is consistent with the goals and policies of the General
Plan, and with the purposes, standards and land use guidelines therein. The ARSP is located in an
area of the City known as The Anaheim Resort, which is designated on the City of Anaheim
General Plan for Commercial Recreation land uses intended for tourist and visitor -serving uses.
The Project provides for a mix of these types of uses, including theme park, retail, restaurant,
entertainment, hotels, and parking uses. The proposed ARSP amendment is consistent with and
implements the existing goals and policies of the General Plan and with the purposes, standards
and land use guidelines therein, including following the approval of the General Plan Amendment,
now pending, to the Land Use and Circulation Elements and the City's Bicycle Master Plan. The
Project's consistency with the General Plan is described in detail in Table 5.10-1 (Consistency of
the Project with the General Plan), which is on file with the City of Anaheim Planning and Building
Department and incorporated herein by this reference as if set forth in full.
3. That the specific plan results in development of desirable character that will
be compatible with existing and proposed development in the surrounding neighborhood. The
proposed amendment provides for development of theme park, hotel, parking and other visitor -
serving uses consistent with the General Plan Commercial Recreation land use designation. The
proposed amendment also includes amended zoning and development standards and design
guidelines for these uses, including, but not limited to, building heights, setbacks and screening
requirements, which have been designed to be compatible with surrounding uses, implement the
General Plan, and will enhance and preserve the general welfare, as described in detail in the
proposed amended Specific Plan.
4. That the specific plan contributes to a balance of land uses throughout the
City by encouraging tourist and entertainment related industries in an area of the City specifically
designated for this type of development. The proposed amendment would allow for the transfer of
previously approved theme park square footage and parking spaces from the DRSP to Disney
Properties in the ARSP to permit greater flexibility in the development of these uses. This includes
the potential transfer of DRSP theme park uses to the proposed new ARSP Theme Park East and
Theme Park West Overlays and the potential transfer of parking uses from the DRSP Parking
District to the adjacent proposed new ARSP Parking Overlay. The proposed amendment would
permit an increase of 4,376 theme park -related parking spaces in the proposed new ARSP Parking
Overlay north of Ball Road. The proposed amendment would not increase the overall maximum
development square footage or hotel rooms currently allowed by the ARSP and the DRSP.
5. That the specific plan respects environmental, aesthetic and historic
resources consistent with economic realities as the potential environmental impacts associated with
the Project were analyzed and applicable mitigation measures have been adopted as further
described in City Council's heretofore adoption of Resolution No. 2024-*** certifying FSEIR No.
352 to Final EIR No. 311 and Final Supplemental EIR No. 340 for the Project, and concurrent
adoption of Findings and a Statement of Overriding Considerations and Mitigation Monitoring
Program No. 387 as the mitigation -monitoring program for the Project; and
WHEREAS, the City Council determines that the evidence in the record constitutes
substantial evidence to support the actions taken and the findings made in this ordinance, that the
facts stated in this ordinance are supported by substantial evidence in the record, including
testimony received at the public hearing, the staff presentation, the staff report and all materials in
the files for the Project. There is no substantial evidence that negates the findings made in this
ordinance. The City Council expressly declares that it considered all evidence presented and
reached these findings after due consideration of all evidence presented to it.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF ANAHEIM
DOES ORDAIN AS FOLLOWS:
SECTION 1.
That the Anaheim Resort Specific Plan No. 92-2 be, and the same is hereby,
amended and restated in its entirety to read in full as indicated in Amendment No. 17 to the
Anaheim Resort Specific Plan No. 92-2 document dated March 2024, as indicated in the
attachment labeled Exhibit C ("Anaheim Resort Specific Plan No. 92-2") and incorporated herein
by this reference.
SECTION 2.
That Mitigation Monitoring Program (MMP) No. 387 is the required MMP for the
development of The Disneyland Resort Project and applicable to the following ARSP Overlays:
Theme Park East Overlay, Theme Park West Overlay and Parking Overlay, as indicated in the
attachments labeled Exhibit D ("Mitigation Monitoring Program (MMP) No. 387") and Exhibit E
("Theme Park and Parking Overlays"), incorporated herein by this reference.
SECTION 3.
That pursuant to the above findings, this City Council approves the above actions,
contingent upon and subject to the conditions of approval for development of The Disneyland
Resort Project in the following ARSP Overlays: Theme Park East Overlay, Theme Park West
Overlay and Parking Overlay, which are hereby found to be a necessary prerequisite to the
proposed use of the Property in order to preserve the health, safety and general welfare of the
citizens of the City of Anaheim, as indicated in the attachments labeled Exhibit F
("DisneylandForward Conditions of Approval") and Exhibit E ("Theme Park and
Parking Overlays"), incorporated herein by this reference.
SECTION 4. SEVERABILITY
The City Council of the City of Anaheim hereby declares that should any section,
paragraph, sentence, phrase, term or word of this ordinance be declared for any reason to be invalid
or unconstitutional by the final judgment of any court of competent jurisdiction, it is the intent of
the City Council that it would have adopted all other portions of this ordinance independent of the
elimination herefrom of any such portion as may be declared invalid or unconstitutional. If any
section, subdivision, paragraph, sentence, clause or phrase of this Ordinance is for any reason held
to be invalid or unconstitutional, such decision shall not affect the validity of the remaining
portions of this Ordinance. The City Council hereby declares that it would have adopted this
Ordinance, and each section, subdivision, paragraph, sentence, clause and phrase or portion
thereof, irrespective of the fact that any one (or more) section, subdivision, paragraph, sentence,
clause or phrase had been declared invalid or unconstitutional.
SECTION 5. CERTIFICATION
The City Clerk shall certify to the passage of this ordinance and shall cause this
ordinance or a summary thereof to be printed once within fifteen (15) days after its adoption in the
Anaheim Bulletin, a newspaper of general circulation, published and circulated in the City of
Anaheim.
SECTION 6. EFFECTIVE DATE
This ordinance shall take effect and be in full force thirty (30) days from and after
its final passage.
THE FOREGOING ORDINANCE was considered at a public hearing held at a regular
meeting of the City Council of the City of Anaheim on the 16"' day of April, 2024 and introduced
at the conclusion of the public hearing on the 17'h day of April, 2024, and thereafter passed and
adopted at a regular meeting of said City Council held on the 7 h day of May, 2024, by the
following roll call vote:
AYES: Mayor Aitken and Council Members Kurtz, Diaz,
Leon, Rubalcava, Faessel and Meeks
NOES: None
ABSENT: None
ABSTAIN: None
CITY OF ANAHEIM
By:
MAYOR OF THE CITY OF ANAHEIM
ATTEST:
CITY CLERK OF THE CITY OF ANAHEIM
EXHIBIT "A"
"PROPERTY"
[Behind this sheet.]
(DEV2021-00069)
I:inti1: Av r i
I
Ilk
�',�
_ 'IV Mall Rd } �F 3:[ii Rd
w .■ w - L , * � � � ■ r.
4 r.r
' Crrr11�,� Ave --' ,� 4 k+ i • .
' . S
r Rion a ti w
W'Katella�E Kt.'i.. ....
is
Convenllofl Wa€? . 1
Geri- ITutry_Way t�
E
Granitc•4o4ol Ave
ap
4
ProjectDesignated for Future Extension in Generall
Plan Circulation Element
Specific Plan Areas
Resort Specific Plan (SP92-1)
Disneyland
ResortAnaheim
Specific
r m �.
SpecificHotel Circle ` a
R
_ •�_.i i iz -- .- - �� l _-�. . � - it . _... .._ �. •�..-. •- .1
EXHIBIT "B"
"DISNEY PROPERTIES"
[Behind this sheet.]
(DEV2021-00069)
Disney Properties
EXHIBIT B
3
Cerritos Ave
v r
x
Ball Rd
Cerritos Ave
� N
a,
' . J
�z
iy ' .♦
_
r
KateIla Ave
......... ' Gene Autry Way
c
. �Ps
EP
orangewood Ave 9`
H
Chapman Ave
0 1,000
Feet
Key to Features
01 Properties owned or leased by Walt Disney Parks City Boundary
and Resorts U.S., Inc. or subsidiaries of the Walt
Disney Company (the "Disney Properties") Disneyland Resort Specific Plan No. 92-1 Boundary
Subject to a Long -Term Third -Party Lease Anaheim Resort Specific Plan No. 92-2 Boundary
The Anaheim Resort® Boundary Hotel Circle Specific Plan No. 93-1 Boundary
3585-3
EXHIBIT "C"
"THE ANAHEIM RESORT SPECIFIC PLAN NO.92-2"
[Behind this sheet.]
(DEV2021-00069)
ANAHEIM
R[50RT
r
THE ANAHEIM RESORT
SPECIFIC PLAN NO. 92-2
v � r
K' ..... . . . . .
City of Anaheim
Planning Commission Public Review Draft (March 2024) ��a,
This page is intentionally blank.
The Anaheim Resort Specific Plan Table of Contents
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
Table of Contents
1.0
Executive Summary ........................................................................................................1-1
1.1
Introduction...............................................................................................................................
1-1
1.2
Purpose of the Specific Plan.....................................................................................................
1-1
1.3
Organization of the Specific Plan Document.............................................................................
1-2
1.4
Existing Setting.........................................................................................................................
1-2
1.4.1 The Disneyland Resort Specific Plan.................................................................................
1-5
1.4.2 The Hotel Circle Specific Plan............................................................................................
1-5
1.5
Implementing the General Plan.................................................................................................
1-5
1.6
Specific Plan Goals...................................................................................................................
1-6
1.7
The Development Plan..............................................................................................................
1-7
1.7.1 Land Use...........................................................................................................................
1-7
1.7.2 Development Density.........................................................................................................
1-8
1.7.3 Development Standards and Guidelines............................................................................
1-8
1.7.4 Development Summary ......................................................................................................
1-8
1.8
Implementing the Specific Plan.................................................................................................
1-9
2.0 PLANNING CONTENT..................................................................................................... 2-1
2.1 Purpose of the Specific Plan..................................................................................................... 2-1
2.2 Specific Plan Policies................................................................................................................ 2-1
2.2.1 Create and Enhance an Urban Destination Resort Environment ........................................ 2-1
2.2.2 Establish a Unified Resort Identity..................................................................................... 2-1
2.2.3 Supply Visitor and Convention Facilities to Meet Long -Term Demand ............................... 2-2
2.2.4 Improve Public Facilities, Services and Infrastructure to Accommodate Growth ................ 2-2
2.2.5 Improve the Transportation System................................................................................... 2-2
2.2.6 Develop Implementation Mechanisms to Assure Quality Development .............................. 2-3
2.2.7 Enhance and Protect Surrounding Uses............................................................................ 2-3
2.3 Authority and Scope of the Specific Plan..........................................................
2.4 Relationship to City Planning Documents and Regulations....................................................... 2-5
2.4.1 Relationship to the General Plan........................................................................................ 2-5
2.4.2 Relationship to the Zoning Ordinance................................................................................ 2-5
2.4.3 California Environmental Quality Act Requirements........................................................... 2-5
2.4.4 Relationship to The Disneyland Resort Specific Plan ......................................................... 2-6
2.4.5 Relationship to the Hotel Circle Specific Plan..................................................................... 2-7
3.0 LAND USE PLAN............................................................................................................. 3-1
3.1 Regional Location..................................................................................................................... 3-1
3.2 Existing Conditions................................................................................................................... 3-1
3.2.1 The Specific Plan Area....................................................................................................... 3-1
3.2.2 Existing Uses......................................................................................... .... ...................3-1
3.3 Land Use Plan.......................................................................................................................... 3-4
3.3.1 Land Use........................................................................................................................... 3-4
3.3.2 Commercial Recreation (C-R) District Development Density .............................................. 3-7
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
Table of Contents
3.3.3 Mobilehome Park (MHP) Overlay.....................................................................................
3-10
3.3.4 Anaheim Resort Residential (ARR) Overlay.....................................................................
3-10
3.3.5 Public Recreation (PR) District Development Density ......................................................
3-10
3.3.6 Theme Park (TP) Overlay................................................................................................
3-10
3.3.7 Parking (P) Overlay..........................................................................................................
3-10
3.3.8 Central Core Development Standards..............................................................................
3-17
3.4
Non Visitor -Serving Uses........................................................................................................
3-19
4.0
PUBLIC FACILITIES PLAN.............................................................................................
4-1
4.1
Regional Circulation Programs..................................................................................................4-1
4.2
Regional Infrastructure Programs.............................................................................................
4-3
4.3
Vehicular Circulation Plan for the Anaheim Resort ....................................................................
4-3
4.3.1 Connections to Interstate 5(1-5).........................................................................................
4-3
4.4
Anaheim Resort Arterial/ Secondary System............................................................................
4-4
4.5
Transit Plans...........................................................................................................................4-18
4.5.1 The Disneyland Resort .....................................................................................................
4-18
4.5.2 East-West Transit Connection..........................................................................................
4-18
4.5.3 HOV Lane System...........................................................................................................
4-18
4.5.4 Bus Service......................................................................................................................
4-18
4.5.5 Intercity Commuter Rail Service.......................................................................................
4-18
4.6
Pedestrian Circulation Plans...................................................................................................
4-19
4.7
Water......................................................................................................................................
4-22
4.8
Sanitary Sewer.......................................................................................................................
4-24
4.9
Storm Drain.............................................................................................................................4-25
4.10 Electricity................................................................................................................................
4-26
4.11
Natural Gas.............................................................................................................................
4-27
4.12
Telephone Services................................................................................................................
4-27
4.13 Television/Cable Service.........................................................................................................
4-27
4.14 Solid Waste.............................................................................................................................
4-27
4.15 Public Services.....................................................................................................................
4-28
5.0
DESIGN PLAN.................................................................................................................
5-1
5.1
Design Plan Objectives.............................................................................................................
5-2
5.1.1 Create Visual Continuity between the ARSP Area and the Adjacent Disneyland Resort
SpecificPlan Area.............................................................................................................
5-2
5.1.2 Create a High Quality, Visually Appealing, Pedestrian -Oriented Environment .................... 5-2
5.1.3 Create Landscape and Design Guidelines to Reinforce the Area's Identity ........................ 5-3
5.1.4 Enhance Public Views of the Theme Parks, including Back -of -House Uses, From Public
Walkwaysand Streets......................................................................................................................
5-3
5.2
Design Concepts.......................................................................................................................
5-3
5.2.1 Transform and Unify with Landscape................................................................................. 5-3
5.2.2 Create a District with a Grand Scale.................................................................................. 5-3
5.2.3 Emphasize Landscaping on Public Streets........................................................................ 5-4
5.2.4 Orient Visitors Visually....................................................................................................... 5-4
5.2.5 Create a Recognizable Center for the Anaheim Resort ...................................................... 5-4
The Anaheim Resort Specific Plan Table of Contents
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
5.2.6 Coordinate Streetscape Improvements with other Improvements ...................................... 5-5
5.2.7 Establish a Clear Design Hierarchy...................................................................................
5-5
5.3 Landscape Concept Plan.......................................................................................................... 5-5
5.3.1 Plant Material Selection and Use.......................................................................................
5-6
5.3.1.1 Basic Selection Criteria....................................................................................
5-6
5.3.1.2 Tree Selection and Use Criteria........................................................................ 5-6
5.3.1.3 Shrub, Vine and Ground Cover Selection and Use Criteria ..............................
5-8
5.3.2 Layered Landscape Design Criteria.................................................................................
5-10
5.3.3 Minimum Tree Density.....................................................................................................
5-13
5.3.3.1 Tree Density to Vary According to Adjacent Use ............................................
5-13
5.3.3.2 The Tree Density Factor.................................................................................
5-13
5.3.4 Plant Selection.................................................................................................................
5-16
5.4 Landscape Cross Sections.....................................................................................................
5-18
5.5 Identity Concept Plan..............................................................................................................
5-50
5.6 Design Criteria for the Public Realm.......................................................................................
5-51
5.6.1 Gateways.........................................................................................................................5-53
5.6.1.1 Freeway Gateways.........................................................................................
5-53
5.6.1.2 Arterial Gateways...........................................................................................
5-55
5.6.1.2.1 Harbor Boulevard North............................................................
5-55
5.6.1.2.2 Harbor Boulevard South...........................................................
5-55
5.6.1.2.3 Katella Avenue East.................................................................
5-55
5.6.1.2.4 Katella Avenue West................................................................
5-56
5.6.1.3 Vehicular Arrival Gateway..............................................................................
5-56
5.6.1.3.1 Theme Park East Overlay Vehicular Arrival Gateway ...............
5-56
5.6.1.3.2 Parking Overlay Vehicular Arrival Gateway ...............................
5-56
5.6.1.4 Pedestrian Arrival Gateway............................................................................
5-57
5.6.1.4.1 Theme Park East Overlay Pedestrian Arrival Gateway .............
5-57
5.6.2 Public Streets............................................................................................. ....................
5-57
5.7 Design Criteria for the Setback Realm....................................................................................
5-58
5.7.1 Exterior Lighting...............................................................................................................
5-58
5.7.2 Freestanding Monument Sign Guidelines........................................................................
5-58
5.7.3 Central Core....................................................................................................................
5-59
5.7.3.1 Central Core Architectural Guidelines.............................................................
5-60
5.7.3.2 Central Core Circulation and Parking Guidelines ............................................
5-60
5.7.3.3 Central Core Landscape Guidelines...............................................................
5-61
5.7.4 Areas Outside of the Central Core...................................................................................
5-61
5.8 Design Criteria for the Private Realm......................................................................................
5-62
5.8.1 Organization of Private Realm Design Standards and Guidelines ....................................
5-62
5.8.2 General Site Planning Guidelines....................................................................................
5-62
5.8.3 Service, Storage and Maintenance Areas and Loading Docks Guidelines .......................
5-63
5.8.4 Exterior Lighting Guidelines.............................................................................................
5-63
5.8.5 Surface Parking Area Guidelines.....................................................................................
5-64
5.8.6 Parking Structure Guidelines...........................................................................................
5-65
5.8.7 Building Appearance Guidelines......................................................................................
5-66
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT
Table of Contents
5.8.8
360 Degree Architectural Treatments...............................................................................
5-67
5.8.9
Building Massing..............................................................................................................
5-67
5.8.10
Building Materials and Colors..........................................................................................
5-68
5.8.10.1 Walls............................................................................................................
5-68
5.8.10.2 Windows......................................................................................................
5-68
5.8.10.3 Roof Materials..............................................................................................
5-69
5.8.10.4 Building Color...............................................................................................
5-69
5.8.10.5 Awnings.......................................................................................................
5-69
5.8.11
Sign Guidelines................................................................................................................
5-69
5.8.12
Landscape Guidelines.....................................................................................................
5-70
5.8.13
Wall and Fence Guidelines.............................................................................................. 5-71
5.8.14
Pedestrian Paving Guidelines..........................................................................................
5-71
6.0 General Plan Consistency.............................................................................................. 6-1
7.0 Zoning and Development Standards............................................................................. 7-1
8.0 Legal Description............................................................................................................8-1
LIST OF EXHIBITS
Exhibit 1.4-1
ARSP/The Anaheim Resort Boundaries............................................................................ 1-4
Exhibit 1.8-1
Development Plan...........................................................................................................
1-10
Exhibit3.1-1
Regional Location Map...................................................................................................... 3-1
Exhibit 3.2-1
ARSP/The Anaheim Resort Boundaries............................................................................ 3-2
Exhibit 3.2-2
Aerial Photograph with the ARSP and The Anaheim Resort Boundaries ...........................
3-3
Exhibit3.3-1
Development Plan............................................................................................................. 3-6
Exhibit 3.3-2
Commercial Recreation (C-R) District Development Density Plan ..................................... 3-9
Exhibit 3.3-3
Mobilehome Park (MHP) Overlay in the C-R District........................................................
3-12
Exhibit 3.3-4
Anaheim Resort Residential (ARR) Overlay in the C-R District ........................................
3-13
Exhibit 3.3-5
Public Recreation (PR) District Plan................................................................................
3-14
Exhibit 3.3-6
Theme Park JP) Overlay in the C-R District...................................................................
3-15
Exhibit 3.3-7
Parking (P) Overlay in the C-R District............................................................................
3-16
Exhibit 3.3-8
Central Core Plan............................................................................................................
3-18
Exhibit 4.1-1
Vehicular Circulation Plan..................................................................................................
4-2
Exhibit 4.4
Cross Section Street Segments Within The Anaheim Resort .............................................
4-6
Exhibit 4.4-1
Disneyland Drive (North of Ball Road) Cross Section........................................................
4-7
Exhibit 4.4-2
Disneyland Drive (Between 825 feet n/o Katella Avenue and 1,350 feet n/o Katella Avenue)
CrossSection.......................................................................................................................................... 4-7
Exhibit 4.4-3
West Street (South of Katella Avenue) Cross Section ......................................................
4-8
Exhibit 4.4-4
West Place Cross Section.................................................................................................
4-8
Exhibit 4.4-5
Disney Way (East of Clementine Street) Cross Section ....................................................
4-8
Exhibit 4.4-6
Ultimate Katella Avenue (Between Interstate 5 and West Street/Disneyland Drive) Cross
Section.................................................................................................................................................
4-10
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
Table of Contents
Exhibit 4.4-7 Ultimate Katella Avenue (Between Walnut Street and West Street/Disneyland Drive) Cross
Section..................................................................................................................................................
4-10
Exhibit 4.4-8 Walnut Street (Between Ball Road and Goodhue Avenue) Cross Section .......................
4-11
Exhibit 4.4-9 Harbor Boulevard (Between Chapman Avenue and Orangewood Avenue) Cross
Section................................................................................................................................................4-11
Exhibit 4.4-10 Harbor Boulevard (Orangewood Avenue to Manchester Avenue on the East Side and
Orangewood Avenue to 150-250 Feet South of Manchester Avenue on the West Side) Cross Section
4-12
Exhibit 4.4-11 Harbor Boulevard (Between Manchester Avenue on the East Side and 150-250 feet South
of Manchester Avenue on the West Side to the Interstate 5 Interchange) Cross Section ......................
4-12
Exhibit 4.4-12 Harbor Boulevard (Interstate 5 to Vermont Avenue) Cross Section ...............................
4-12
Exhibit 4.4-13 Ball Road (With Landscaped Median West of West Place) Cross Section .....................
4-12
Exhibit 4.4-14 Ball Road (Between West Place and Cast Place) Cross Section ...................................
4-13
Exhibit 4.4-15 Ball Road (East of Cast Place) Cross Section...............................................................
4-13
Exhibit 4.4-16 Clementine Street Cross Section...................................................................................
4-13
Exhibit 4.4-17 Haster Street/Anaheim Boulevard Cross Section...........................................................
4-14
Exhibit 4.4-18 Convention Way Cross Section.....................................................................................
4-14
Exhibit 4.4-19 Gene Autry Way (East of Haster Street) Cross Section .................................................
4-15
Exhibit 4.4-20 West Manchester Avenue Cross Section....................................................................
4-15
Exhibit 4.4-21 North Manchester Avenue (Adjacent to Interstate 5, North of the Parking Overlay) Cross
Section..................................................................................................................................................
4-15
Exhibit 4.4-22 North Manchester Avenue (Adjacent to Interstae 5 and the Praking Overlay, North of Alro
Way) Cross Section.............................................................................................................................
4-16
Exhibit 4.4-23 Manchester Avenue, East of Anaheim Boulevard (Adjacent to Interstate 5) Cross Section
..............................................................................................................................................................
4-16
Exhibit 4.4-24 Orangewood Avenue Cross Section..............................................................................
4-16
Exhibit 4.4-25 Chapman Avenue Cross Section...................................................................................
4-16
Exhibit 4.4-26 Alro Way Cross Section.................................................................................................
4-16
Exhibit 4.4-27 Casa Vista Street Cross Section....................................................................................
4-17
Exhibit 4.4-28 Vermont Avenue Cross Section.....................................................................................
4-17
Exhibit 4.4-29 Wilken Way Cross Section..........................................................................................
4-17
Exhibit 4.4-30 Zeyn Street Cross Section...........................................................................................
4-17
Exhibit 4.6-1 Proposed Pedestrian Circulation.....................................................................................
4-20
Exhibit 4.6-2 Pedestrian and Vehicular Access Points.........................................................................
4-21
Exhibit 5.2-1 Utilize the Streets for Landscaping....................................................................................
5-4
Exhibit 5.2-2 The Three Elements of the Design Hierarchy: The Public Realm, The Setback Realm, and
thePrivate Realm...................................................................................................................................
5-5
Exhibit5.3-1 Medium Canopy Trees...................................................................................................... 5-7
Exhibit5.3-2 Large Canopy Trees.......................................................................................................... 5-7
Exhibit 5.3-3 Vertical and Pyramidal Trees............................................................................................. 5-8
Exhibit 5.3-4 Use of Shrubs to Screen Surface Parking Lots.................................................................. 5-9
Exhibit 5.3-5 Formal (Clipped) Hedges Vary in Height.......................................................................... 5-9
Exhibit 5.3-6 Ground Cover Includes Turf and Other Grasses, Annuals, and Other Varieties of Plants
5-10
Exhibit 5.3-7 Layered Landscape Design Criteria for Properties with Frontages Greater than 300 Feet5-11
Exhibit 5.3-8 Layered Landscape Design Criteria for Properties with Frontages Less than 300 Feet ...
5-11
The Anaheim Resort Specific Plan Table of Contents
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
Exhibit 5.3-9 Layered Landscape Setback Width Criteria..................................................................... 5-12
Exhibit 5.3-10 Tree Density Factor Plan...............................................................................................
5-15
Exhibit 5.4 Landscape Cross Sections.................................................................................................
5-19
Exhibit 5.4-1 Disneyland Drive (North of Ball Road) Landscape Cross Section ....................................
5-20
Exhibit 5.4-2 Disneyland Drive (Between 825 feet n/o Katella Avenue and 1,350 feet n/o Katella Avenue)
LandscapeCross Section.....................................................................................................................
5-21
Exhibit 5.4-3 West Street (South of Katella Avenue) Landscape Cross Section ...................................
5-22
Exhibit 5.4-4 West Place Landscape Cross Section.............................................................................
5-23
Exhibit 5.4-5 Disney Way (East of Clementine Street) Landscape Cross Section ................................
5-24
Exhibit 5.4-6 Ultimate Katella Avenue (Between Interstate 5 and West Street/Disneyland Drive)
LandscapeCross Section.....................................................................................................................
5-25
Exhibit 5.4-7 Ultimate Katella Avenue (Between Walnut Street and West Street/Disneyland Drive)
LandscapeCross Section.....................................................................................................................
5-26
Exhibit 5.4-8 Walnut Street Landscape Cross Section.........................................................................
5-27
Exhibit 5.4-9 Harbor Boulevard (Between Chapman Avenue and Orangewood Avenue) Landscape Cross
Section..................................................................................................................................................
5-28
Exhibit 5.4-10 Harbor Boulevard (Orangewood to Manchester on the East Side and Orangewood to 150-
250 Feet South of Manchester Avenue on the West Side) Landscape Cross Section ...........................
5-29
Exhibit 5.4-11 Harbor Boulevard (Between Manchester Avenue on the East Side and 150-250 feet South
of Manchester Avenue on the West Side to the Interstate 5 Interchange) Landscape Cross Section ....
5-30
Exhibit 5.4-12 Harbor Boulevard (Interstate 5 to Vermont Avenue) Landscape Cross Section .............
5-31
Exhibit 5.4-13 Ball Road (West of West Place) Landscape Cross Section ..........................................
5-32
Exhibit 5.4-14 Ball Road (Between West Place and Harbor Boulevard) Landscape Cross Section ......
5-33
Exhibit 5.4-15 Ball Road (East of Cast Place) Landscape Cross Section ............................................
5-34
Exhibit 5.4-16 Clementine Street Landscape Cross Section................................................................
5-35
Exhibit 5.4-17 Haster Street/Anaheim Boulevard Landscape Cross Section ........................................
5-36
Exhibit 5.4-18 Convention Way Landscape Cross Section...................................................................
5-37
Exhibit 5.4-19 Gene Autry Way Landscape Cross Section...................................................................
5-38
Exhibit 5.4-20 West Manchester Avenue Landscape Cross Section ....................................................
5-39
Exhibit 5.4-21 North Manchester Avenue (Adjacent to Interstate 5, North of the Parking Overlay)
LandscapeCross Section.....................................................................................................................
5-40
Exhibit 5.4-22 North Manchester Avenue (Adjacent to Interstate 5 and the Parking Overlay, North of Alro
Way) Landscape Cross Section............................................................................................................
5-41
Exhibit 5.4-23 Manchester Avenue, East of Anaheim Boulevard (Adjacent to Interstate 5) Landscape
CrossSection........................................................................................................................................
5-42
Exhibit 5.4-24 Orangewood Avenue Landscape Cross Section............................................................
5-43
Exhibit 5.4-25 Chapman Avenue Landscape Cross Section.................................................................
5-44
Exhibit 5.4-26 Alro Way Landscape Cross Section...............................................................................
5-45
Exhibit 5.4-27 Casa Vista Street Landscape Cross Section.................................................................
5-46
Exhibit 5.4-28 Vermont Avenue Landscape Cross Section...................................................................
5-47
Exhibit 5.4-29 Wilken Way Landscape Cross Section..........................................................................
5-48
Exhibit 5.4-30 Zeyn Street Landscape Cross Section..........................................................................
5-49
Exhibit 5.6-1 The Three Elements of the Design Hierarchy: The Public Realm, The Setback Realm, and
thePrivate Realm................................................................................................................................
5-51
The Anaheim Resort Specific Plan Table of Contents
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
Exhibit5.6-2
The Public Realm............................................................................................................
5-52
Exhibit 5.6-3
Gateway Location Plan....................................................................................................
5-54
Exhibit 5.6-4
Harbor Boulevard North Gateway....................................................................................
5-55
Exhibit 5.6-5
Katella Avenue West Gateway........................................................................................
5-56
Exhibit 5.7-1
The Three Elements of the Design Hierarchy: The Public Realm, The Setback Realm, and
thePrivate Realm
.................................................................................................................................
5-58
Exhibit 5.7-2
Freestanding Monument Sign..........................................................................................
5-59
Exhibit 5.7-3
Freestanding Sign Design Criteria...................................................................................
5-59
Exhibit 5.7-4
Basic Central Core Design Principles..............................................................................
5-59
Exhibit 5.7-5
Redundant Curb Cuts......................................................................................................
5-60
Exhibit 5.7-6
Consolidate Curb Cuts....................................................................................................
5-60
Exhibit 5.7-7
Limit Portion of Elevation Devoted to Parking Area Entries ..............................................
5-60
Exhibit 5.7-8
Special Intersection Landscape Treatment......................................................................
5-61
Exhibit 5.7-9
Harbor Boulevard/Katella Avenue Intersection Area ........................................................
5-61
Exhibit 5.8-1
The Three Elements of the Design Hierarchy: The Public Realm, The Setback Realm, and
thePrivate Realm.................................................................................................................................
5-62
Exhibit 5.8-2
Landscape Buffer between Uses.....................................................................................
5-63
Exhibit 5.8-3
Screen Service Areas from View.....................................................................................
5-63
Exhibit 5.8-4
Screen Parking From View..............................................................................................
5-65
Exhibit 5.8-5
Pedestrians Move Perpendicular to Parking Spaces .......................................................
5-65
Exhibit 5.8-6
Landscaping Detail at Ground Level................................................................................
5-71
Exhibit5.8-7
Wall/Fencing Plan............................................................................................................
5-73
LIST OF TABLES
Table 1.8-1 Development Summary ..................................................................................................... 1-11
Table 1.8-2 Existing and Permitted Development................................................................................. 1-12
Table 4.8-1 Existing Sewer System Deficiencies and Recommended Improvements for Year 2030 .... 4-25
Table 5.3-1 Levels of Tree Density....................................................................................................... 5-13
Table5.3-2 Tree Point Values.............................................................................................................. 5-14
Table 5.8-1 Allowable Lighting Levels by Level of Security.................................................................. 5-64
APPENDICES
Appendix A - List of Specific Plan Amendments, Adjustments and Associated Actions
(Note: For information only: This document will be updated after subsequent amendments or adjustments to the Specific Plan.)
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
This page is intentionally blank.
Table of Contents
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
1.0 Executive Summary
1.1 Introduction
On September 27, 1994, the Anaheim City
Council adopted Ordinance No. 5453 relating to
the establishment of Zoning and Development
Standards for the Anaheim Resort Specific Plan
(ARSP) No. 92-2 by the addition of Chapter
18.116 (formerly 18.48) to the Anaheim Municipal
Code, and Ordinance No. 5454, amending the
zoning map to reclassify approximately 549.5
acres of certain real property into the ARSP. The
ARSP was specifically designated by the City's
General Plan for recreation and
tourist/convention-related activities.
Since the adoption of the ARSP, proposed
modifications to the specific plan have included
16 amendments and 13 adjustments, which have
included an expansion of the ARSP area to
include 31.8 additional acres, increasing the total
acreage of the ARSP area to 581.3 acres. Refer
to Appendix A, `List of Specific Plan Amendments
and Adjustments and Associated Actions
including General Plan Amendments' for a
consolidated list of all amendments and
adjustments.
In 2021, to allow continued, long-term growth of
The Disneyland Resort, Walt Disney Parks and
Resorts U.S., Inc. (Disney) proposed
DisneylandForward to allow the transfer of uses
permitted under The Disneyland Resort Project to
other areas of the Disneyland Resort Specific
Plan No. 92-1 (DRSP) and properties within the
ARSP owned or leased by Disney or other
subsidiaries of The Walt Disney Company
(Disney ARSP Properties, and, collectively with
Disney's properties in the DRSP, Disney Property
or Disney Properties). This proposal did not
request an increase in the amount of
development square footage or hotel rooms
1-1
1.0 Executive Summary
allowed in the DRSP, or the number of hotel
rooms allowed in the ARSP. However, it included
an increase of 4,376 theme park -related parking
spaces in the ARSP. The proposal also
requested future administrative review by the City
of Disney's development projects on Disney
Property.
In [insert year], the Anaheim City Council
approved Disneyland Forward, including
amendments to the Land Use and Circulation
Elements of the City's General Plan and the
Bicycle Master Plan [Resolution No. xxx, adopted
on xxx], and Amendment No. 17 to the ARSP
document and zoning and development
standards [Ordinance Nos. adopted on xxx].
1.2 Purpose of the Specific Plan
The purpose of the ARSP is to provide a long-
range comprehensive plan for future
development of approximately 581.3 acres within
The Anaheim Resort, which encompasses 1,078
acres generally located adjacent to and
southwest of Interstate 5 (1-5). To achieve this,
the ARSP establishes an overall identity and land
use plan that is intended to maximize the area's
potential, guide future development, and ensure
a balance between growth and infrastructure.
The ARSP additionally includes specific zoning
and development standards, design guidelines, a
streetscape program, and a public facilities plan,
which describe how the Plan's goals and
objectives will be realized. The ARSP will permit
the development of hotel, convention, retail, and
other visitor -serving uses as well as the infra-
structure improvements that will be needed to
support future development.
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
1.3 Organization of the Specific
Plan Document
The Specific Plan is divided into eight sections:
• Section 1.0, the Executive Summary, is
a brief overview of the ARSP.
• Section 2.0, the Planning Context,
discusses the purpose of the ARSP, the
City planning policies that affect
development of the ARSP area, the
authority and scope of the ARSP, and its
relationship to other City planning
documents.
• Section 3.0, the Land Use Plan,
describes existing land uses and
conditions within the ARSP area, and
describes the proposed land uses and
development densities.
• Section 4.0, the Public Facilities Plan,
discusses the existing and proposed
infrastructure within the Specific Plan
area, including, but not limited to,
circulation and transit connectivity, water,
sewer, waste, and energy services.
• Section 5.0, the Design Plan establishes
the design criteria for the ARSP area.
• Section 6.0, General Plan Consistency,
describes how the ARSP is consistent
with the City's General Plan.
• Section 7.0, the Zoning and
Development Standards, regulate
development within the ARSP area.
• Section 8.0, Zoning Explanation,
compares the development standards
contained in the Plan to existing City
regulations.
• Section 9.0, Legal Description, contains
a legal description of the Specific Plan
area.
The Anaheim Commercial Recreation Area
Maximum Permitted Structural Height Map
(permitted by Section 18.40.080 (Structural
1-2
1.0 Executive Summary
Height Limitations — Anaheim Municipal
Code)), The Anaheim Resort Public Realm
and Landscape Program, The Anaheim
Resort Identity Program and Planning
Standard Details 5-9, which are referenced
throughout the Specific Plan, are on file with
the City of Anaheim Planning and Building
Department.
1.4 Existing Setting
The ARSP area encompasses 581.3 acres within
the 1,078-acre Anaheim Resort, a portion of the
City of Anaheim specially designated by the
City's General Plan for recreation and
tourist/convention-related activities and
supporting uses. The Anaheim Resort is located
35 miles southeast of downtown Los Angeles and
7 miles northwest of Santa Ana, in Central
Orange County. As shown in Exhibit 1.4-1
(ARSP/The Anaheim Resort Boundaries), The
Anaheim Resort is located generally west of the
1-5 corridor, south of Vermont Avenue, east of
Walnut Street, and north of Chapman Avenue.
In addition to this Specific Plan, the City has
undertaken and adopted other planning efforts
for the remaining 496.5 acres in The Anaheim
Resort. The City has adopted the Disneyland
Resort Specific Plan (Specific Plan No. 92-1)
covering 489.7 acres of The Anaheim Resort and
the Hotel Circle Specific Plan (Specific Plan No.
93.1) covering 6.8 acres of The Anaheim Resort.
The three Specific Plans have been prepared to
complement one another by incorporating similar
zoning and development standards, design
guidelines, streetscape and signage programs
and infrastructure improvements. Together, these
documents guide the development and
enhancement of The Anaheim Resort. In addition
to the specific plans, the City Council also
adopted The Anaheim Resort Identity Program
and The Anaheim Resort Public Realm
Landscape Program to provide for the
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
streetscape elements and landscape plans that
will be implemented in public rights -of -way within
The Anaheim Resort.
1-3
1.0 Executive Summary
The Anaheim Resort Specific Plan 1.0 Executive Summary
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
Exhibit 1.4-1 1 ARSP/The Anaheim Resort Boundaries
LEGEND
MAP FEATURES
The Anaheim Resort
Boundary
The Anaheim Resort
Specific Plan (92-2(
The Anaheim Resort
I— Specific Plan Boundary
The Disneyland Resort
Specific Plan (92-1(
J City Boundary
` Hotel Circle
Specific Plan (93-11
1-4
Notes/Sources
Cry Legal Lot Data, 2022
City Boundary Dula. 2022
0 750 1,500 n
Feet w
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
1.4.1 The Disneyland Resort Specific
Plan
On June 29, 1993, the City of Anaheim approved
The Disneyland Resort Project and adopted The
Disneyland Resort Specific Plan (SP 92-1) to
provide for the development of an international
multi -day vacation destination resort
encompassing approximately 489.7 acres of The
Anaheim Resort. The Disneyland Resort Project
provides for and the DRSP permits the
development of new theme park uses, additional
hotels and entertainment areas, new parking
facilities, and an internal transportation system. In
addition, the DRSP permits the existing
Disneyland theme park to continue to be modified
with new attractions and other improvements.
Although they are separate projects, the ARSP
and The DRSP have been prepared to
complement one another by incorporating similar
zoning and development standards, streetscape
and signage programs, and infrastructure
improvements for the overall enhancement of
The Anaheim Resort.
In 2021, to allow continued, long-term growth of
The Disneyland Resort, Walt Disney Parks and
Resorts U.S., Inc. proposed DisneylandForward,
an update to The Disneyland Resort Project (1)
to allow the transfer of theme park, hotel and
other retail, dining and entertainment uses, and
parking permitted in The Disneyland Resort
Project to other areas of the DRSP and
properties within ARSP owned or leased by
Disney or other subsidiaries of The Walt Disney
Company (Disney ARSP Properties, and,
collectively with Disney's properties in the DRSP,
Disney Property or Disney Properties), and (2) to
provide for future administrative review by the
City of Disney's development projects within the
Specific Plan area and The Disneyland Resort
Specific Plan area. This proposal did not request
an increase in the amount of development
square footage or hotel rooms allowed in the
1-5
1.0 Executive Summary
DRSP, or the number of hotel rooms allowed in
the ARSP. However, it would include an increase
of 4,376 theme park -related parking spaces in
the ARSP. The proposal allowed theme park
square footage to move from the DRSP Theme
Park District to the ARSP Theme Park East and
West Overlays provided the total theme park
square footage does not exceed 6,850,000
square feet and proposal allowed the parking
spaces to move from the DRSP Parking District
East Parking Area to the adjacent ARSP Parking
Overlay, in conjunction with development of a
parking facility in the East Parking Area. Any
amount of parking spaces constructed in the P
Overlay at Manchester Avenue would result in an
equivalent amount of potential parking spaces
removed from the allotment for the DRSP
Parking District, East Parking Area. Refer to
Chapter 3 for additional information and Exhibit
1.8-1 (Development Plan) for the location of the
Theme Park and Parking Overlays.
1.4.2 The Hotel Circle Specific Plan
On August 16, 1994, the City of Anaheim
adopted the Hotel Circle Specific Plan (SP 93-1)
for the remaining 6.8 acres of The Anaheim
Resort. This specific plan allows for the
development of up to 969 hotel rooms. All of the
parcels within the specific plan area are
developed with a total of 818 hotel rooms.
1.5 Implementing the General
Plan
The Specific Plan implements the City's General
Plan by addressing the pertinent goals, policies
and objectives of the General Plan. In 1994,
when the City adopted the ARSP, the following
General Plan policies relevant to development of
the Specific Plan were in place:
• To maintain and encourage Anaheim's
position as a nationally recognized tourist,
convention and recreation center;
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH
• To increase sales tax yields and further
enhance the economic base of the
community, thereby lessening the tax burden
on real property;
• To encourage the development of quality
facilities that complement conventions, family
entertainment, and recreation within
appropriate areas of the community; and,
• To maintain the integrity of the Commercial
Recreation Area (now referred to as The
Anaheim Resort) by permitting only
compatible land uses within this designated
area.
In 2004, the Anaheim City Council adopted a
comprehensive update of its General Plan, which
continues to incorporate similar goals and
policies relevant to the ARSP.
A complete discussion of the relationship
between the ARSP and the Anaheim General
Plan is found in Section 6.0, General Plan
Consistency.
1.6 Specific Plan Goals
The General Plan is implemented through the
following overall goals of the ARSP:
• To foster the growth of the City's economic
potential by revitalizing The Anaheim Resort;
• To treat all landowners and users in The
Anaheim Resort fairly, while recognizing the
economic and social needs of the entire City;
• To ensure that development complements the
City's investment in the Anaheim Convention
Center and other area resources and
interests;
• To maintain and enhance existing recreation
and convention -oriented land uses;
• To protect adjacent residential land uses by
buffering them from potential land use
WV
1.0 Executive Summary
impacts associated with development of The
Anaheim Resort;
• To maintain or enhance traffic and circulation
in and around The Anaheim Resort;
• To provide convenient access to all hotel,
restaurant, and retail opportunities in The
Anaheim Resort to enhance the area -wide
tourist experience;
• To protect adjacent residential neighborhoods
from unnecessary intrusion by vehicles
traveling to and from The Anaheim Resort;
• To accommodate potential future regional
transportation networks into the Plan;
• To provide for necessary public infrastructure
and services to maximize the development
potential of The Anaheim Resort;
• To create a coherent, unique resort identity
that reinforces The Anaheim Resort's image
as a high -quality destination resort;
• To establish a high -quality pedestrian
environment;
• To improve the aesthetic character of The
Anaheim Resort by visually defining the
boundaries with appropriate landscape
treatments;
• To enhance the Anaheim Resort area by
providing a wider range of attractions, hotel
accommodations, restaurants, shopping
opportunities, and public parking;
• To support the continued reimagination of
The Disneyland Resort to meet and exceed
evolving guest expectations for immersive
entertainment and technological advances in
theme park and other resort experiences in
the Theme Park Overlays; and
• To continue to fulfill the following vision of
Walt Disney: "Disneyland will never be
completed... It will continue to grow as long as
there is imagination left in the world."
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
1.7 The Development Plan
The Development Plan establishes the basic
framework for land use and development
standards, which will govern development of the
ARSP area. It defines the permitted uses,
development density, building setbacks, building
heights, and other design standards that will be
complied with by individual property owners and
developers when building new or renovating
existing projects.
1.7.1 Land Use
The land uses permitted within the ARSP area
will be consistent with the overall goal of
maximizing the area's potential, while
establishing an overall identity. The primary intent
is to provide for the needs of visitors to the area's
attractions. Consequently, the permitted uses are
primarily those that, by their nature, are related to
tourism and entertainment.
The 518.5-acre Commercial Recreation (C-R)
District (Development Area 1), which
encompasses the entire ARSP area, except the
Anaheim Convention Center and the Hilton
Anaheim hotel, provides for the development of
hotels, motels, convention and conference
facilities, as well as restaurants, retail shops, and
entertainment uses. Since the uses are oriented
towards entertainment, retail uses such as
neighborhood shopping centers will not be
permitted. In addition, to discourage use of
automobiles, drive -through restaurants and other
similar uses will not be permitted.
The C-R District also includes three properties on
approximately 31.5 acres, which are within the
Mobilehome Park (MHP) Overlay. The MHP
Overlay encompasses two existing mobile home
1-7
1.0 Executive Summary
parks and a recreational vehicle (RV) park. The
requirements set forth in Chapter 18.14 (Public
and Special -Purpose Zones) of the Anaheim
Municipal Code provide development standards,
regulations, and procedures to mitigate relocation
problems and adverse effects of effects of
displacement upon mobilehome owners when a
park is converted to another land use.
Also located within the C-R District, the 59.3-acre
Anaheim Resort Residential (ARR) Overlay
allows for conditionally permitted residential uses
in conjunction with the development of a full -
service hotel having at least 300 hotel rooms and
where (i) hotel uses comprise at least half of the
site density, (ii) residential uses on the site are
fully integrated into the hotel, and (iii) adjacent to
public rights -of -way, residential uses are at least
two stories or 25 feet above ground level.
The 62.8-acre Public Recreation (PR) District
(Development Area 2) encompasses the City of
Anaheim Convention Center and associated
parking complexes, and the 1,600-room Hilton
Anaheim hotel. The PR District allows up to
2,158,363 square feet of convention
center/meeting space; 100,000 square feet of
outdoor programmable space; 2,500 hotel rooms;
and 180,000 square feet of commercial space.
Development within this district is subject to the
requirements of the Public Recreation (PR) Zone.
The purpose of the PR Zone, which is set forth in
Chapter 18.14 of the Anaheim Municipal Code, is
to preserve, regulate and control the orderly use
of City -owned property and adjacent private
property
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
Also located in the C-R District, the Theme Park
(TP) Overlay includes the TP East Overlay and
TP West Overlay. The TP East Overlay includes
one property on approximately 52.6 acres and
currently includes the Toy Story surface parking
lot associated with The Disneyland Resort. The
TP West Overlay includes two properties on
approximately 5.15 acres and currently
encompasses the existing Pixar Pals Hotel and
associated parking structure. The TP Overlays
allow for theme park uses in conjunction with
hotel and other uses allowed by the C-R District.
Also located in the C-R District, the Parking (P)
Overlay includes two separate areas one at
Manchester Avenue, directly north of the DRSP
Parking District East Parking Area, and one at
the northeast corner of Harbor Boulevard and
Ball Road. The Parking Overlay at Manchester
Avenue includes three properties on
approximately 14.88 acres. The Parking Overlay
at Harbor Boulevard and Ball Road includes eight
properties on approximately 10.69 acres. The
Parking Overlay allows for parking and limited
back -of -house uses, such as administrative
offices and other incidental theme park support
facilities, such as restrooms and parking facility
offices, in conjunction with hotel and other uses
allowed by the C-R District.
1.7.2 Development Density
Because of the location of the ARSP area in an
urban setting, the density at which particular
areas are developed is an important planning
consideration. In particular, the timing and
availability of infrastructure (such as vehicular
access, water and sewer capacity, and storm
drainage facilities) is the critical determinant for
the future development potential of the ARSP
area. In addition, proximity to the area's
attractions, and the relationship to surrounding
land uses was considered. For the allowable
development densities within the ARSP area,
refer to Section 3.3 of the Land Use Plan.
1-8
1.0 Executive Summary
1.7.3 Development Standards and
Guidelines
In addition to regulations that will govern
development density, the ARSP contains
development standards which regulate building
mass and setbacks from property lines. The
ARSP also contains regulations which define
required landscape treatments both within the
public right-of-way and in required setbacks, as
well as guidelines for site planning, service area
design, parking facility design, building
appearance, signs, and other landscaping.
In recognition of the importance of the Harbor
Boulevard and Katella Avenue corridors to the
identity of The Anaheim Resort, the plan
establishes special standards and guidelines for
the central portion of The Anaheim Resort. This
area, known as the Central Core, encompasses
lots or parcels in the ARSP area with frontage on
Harbor Boulevard between 1-5 and Orangewood
Avenue, and on Katella Avenue between Walnut
Street and Haster Street/Anaheim Boulevard.
1.7.4 Development Summary
The maps and accompanying tables on the
following pages summarize the Development
Plan for the ARSP. Exhibit 1.7-1 (Development
Summary Plan), shows the location of the C-R
District (Development Area 1), the PR District
(Development Area 2), the Central Core, the
Mobilehome Park (MHP) Overlay, the Anaheim
Resort Residential (ARR) Overlay, the Theme
Park (TP) Overlay, and the Parking (P) Overlay. It
is accompanied by Table 1.7-1, which
summarizes the Development Plan, and Table
1.7-2, which summarizes the existing and
permitted development in the C-R and PR
Districts.
As shown in Table 1.7-2, the ARSP permits up to
32,500 hotel rooms or hotel room equivalents
within the C-R District. There are 11,587 hotel
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
rooms or hotel room equivalents that are currently
developed within the ARSP area. For impact
analysis, commercial uses are converted to hotel
room equivalents on a ratio of 600 square feet of
commercial development to one hotel room.
The PR District includes the 1,712,004 square
foot (so Anaheim Convention Center and the
1,600-room Hilton Anaheim hotel. The PR
District allows development of up to 2,158,363
square feet of convention center/meeting space;
100,000 square feet of outdoor programmable
space; 2,500 hotel rooms; and 180,000 square
feet of commercial space.
The TP East Overlay allows development of up to
840,000 square feet of theme park uses allowed
under the DRSP as part of The Disneyland
Resort Project and up to 3,348 hotel rooms,
which are allowed under the Specific Plan. The
TP West Overlay allows development of up to
80,000 square feet of theme park uses permitted
in the DRSP as part of The Disneyland Resort
Project and up to 564 hotel rooms, which are
allowed under the ARSP. Any amount of theme
park square footage constructed in the TP
Overlay would result in an equivalent amount of
potential theme park square footage removed
from the allotment for the DRSP Theme Park
District such that the maximum theme park
square footage in the DRSP Theme Park District,
DRSP Southeast District, and TP Overlay will not
exceed 6,850,000 square feet.
The P Overlay at Manchester Avenue allows
development of a portion of the parking spaces
permitted and allocated to the DRSP Parking
District East Parking Area and up to 1,116 hotel
rooms, which are allowed under the ARSP. The
P Overlay at the northeast corner of Harbor
Boulevard and Ball Road allows development of
up to 5,700 parking spaces and up to 534 hotel
rooms, which are allowed under the ARSP. Any
1-9
1.0 Executive Summary
amount of parking spaces constructed in the P
Overlay at Manchester Avenue would result in an
equivalent amount of potential parking spaces
removed from the allotment for the DRSP
Parking District, East Parking Area.
1.8 Implementing the Specific
Plan
The sketches, diagrams, and plans included in
the ARSP are intended to convey the overall
design intent of the ARSP. As individual
properties are developed, additional site
planning, design review and approval will be
required prior to the issuance of building permits.
In order to convey the design intent of the ARSP,
the trees and other plants shown in sketches and
cross -sections have been drawn to show their
sizes at maturity.
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT
Exhibit 1.8-1 1 Development Plan
1.0 Executive Summary
1 �
Pve
.Yertho�Y..�
MOBIIENOME
1� ei►�;4R1C,O.VERIAY -
City: of.
a
EZ
Anahe m
i'
7l
�i--
•—
A �
lops
isney_Icnd D
rneipork;
1
r
-Cemtos.-Ave- o
-
-
:E .LL WENL IAwK`,
City of, II �, L A Ad lure
AnaiMrA �. l >�Qa;e Park
`
► \.
_.
S
Kdtelld_Av_e
r— �
I
GDY_BOUNDARY,I I,
_J N
City of
Garden Grove
Development Plan
LEGEND
The Anaheim Resort
Boundary
'+ The Anaheim Resort
i� Specific Plan Boundary
J City Boundary
P�:-j yr f— Kdtelld A
serer
o�
MAP FEATURES
C-R District
(Development Area 1)
PR District
(Development Area 2(
/Z.4 Anaheim Resort
Residential (ARR)
Overlay
— Mobilehome Park (MHP)
Overlay within the C-R District
_ Theme Park (TP) Overlay
within the C-R District
Parking (P) Overay
within the C-R District
Central Core
1-10
CWAOUNDARY�
— ciiFy of
— Orange
Nolen/Sources
City Legal Lot Data, 2022
City Boundory Data, 2022
0 750 1,500
Feet
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
Table 1.8-1 Development Summary
1.0 Executive Summary
Districts/Rights-of-way Land Use
Approximate Acreage
Commercial Recreation (C-R) District
Hotel/motel, restaurant and other visitor -serving
518.5
(Development Area 1)
uses
Public Recreation (PR) District
Anaheim Convention Center, hotels, and
62.8
(Development Area 2)
accessory uses
TOTAL 681.3
Mobile Home Park (MHP) Overlay in
Existing mobile homes
31.5
C-R District
59.3
Anaheim Resort Residential (ARR)
Allows residential uses in conjunction with a full-
Overlay in C-R District
service hotel
Theme Park (TP) Overlay
TP East Overlay
Allows theme park uses in conjunction with hotels
52.6
TP West Overlay
and other uses allowed by the C-R District
5.15
Parking (P) Overlay
Manchester Avenue
Allows development of a portion of the parking
14.9
allocated to the Parking District East Parking Area
of The Disneyland Resort Specific Plan and
limited back -of -house uses in conjunction with
hotels and other uses allowed by the C-R District
Harbor Boulevard/Ball Road
Allows development of parking and limited back-
10.7
of -house uses in conjunction with hotels and other
uses allowed by the C-R District
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
Table 1.8-2 Existing and Permitted Development
1.0 Executive Summary
Existing
Permitted
Permitted Development
District
Development
P
Development (')
After
DisneylandForward(')
C-R District
. 11,587 hotel
. 32,625 hotel rooms(2)
32,625 hotel rooms
rooms*
Public Recreation (PR)
. 1,600 hotel rooms
• 2,500 hotel rooms
• 2,500 hotel rooms
District
1,712,004 sf
0 2,118,363 sf convention
• 2,118,363 sf convention
convention center
center
center
• 180,000 sf commercial
• 180,000 sf commercial
development
development
• 40.000 sf of additional
• 40,000 sf of additional hotel
hotel meeting and
meeting and ballroom
ballroom space
space
• 100,000 sf outdoor
• 100,000 sf outdoor
programmable space
programmable space
Theme Park (TP)
Overlay(3)
TP East Overlay
Temporary surface
• 3,348 hotel rooms
• Temporary surface parking
parking facilities
facilities
(4,635 spaces)
or
3,348 hotel rooms, 840,000
sf of theme park uses
TP West Overlay
489 hotel rooms,
564 hotel rooms
564 hotel rooms,
17,619 sf of
80,000 sf of theme
ancillary
park uses
commercial uses.
Parking (P) Overlay(4)
Manchester Avenue
Temporary surface
1,116 hotel rooms
• Temporary surface parking
parking facilities
facilities (1,261 spaces),
(1,261 spaces),
approximately 67,424 sf
approximately
office building
67,424 sf office
or
building
1,116 hotel rooms,
development of a portion of
the parking spaces
1-12
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
1.0 Executive Summary
Existing Permitted Permitted Development
District Development t+) After
p Development DisneylandForward(')
allocated to the East
Parking Area of The
Disneyland Resort Specific
Plan
Harbor Boulevard/ . Surface parking . 534 hotel rooms Temporary surface parking
Ball Road facilities facilities and (1,324
(1,324 spaces) spaces)
or
534 hotel rooms, 5,700
parking spaces
Notes:
(1) Commercial uses are converted to hotel room equivalents as allowed by Section 7.0 of the Specific Plan, on a ratio of 600
square feet (so of commercial development = 1 hotel room.
(2) As of adoption of Ordinance No. 6494 approving Amendment No. 16 to the ARSP.
(3) The total amount of theme park uses developed in the TP Overlay will reduce the potential amount of theme park uses in the
DRSP Theme Park District such that the maximum theme park space footage in the DRSP Theme Park and Southeast
Districts and the ARSP TP Overlay shall not exceed 6,850,000 square feet. The amount of restaurant sf in the TP East
Overlay shall be further limited to up to 20 percent of the allotted theme park square footage in the Overlay.
(4) For any square footage for back -of -house uses or limited retail, dining and entertainment uses, the traffic generation
characteristics of said uses shall not exceed those associated with the otherwise permitted hotel/motel (including accessory
uses) density as determined by the City Traffic and Transportation Manager prior to approval of building plans. Further, the
proposed development shall not result in infrastructure impacts greater than those associated with the property's permitted
hotel/motel density, unless such impacts are duly analyzed and mitigated pursuant to subsequent environmental review
(such impacts shall be determined through a sewer and traffic impact analysis to be submitted to the City Engineer).
Additional infrastructure studies may be required as determined by the Planning Director.
1-13
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
This page is intentionally blank.
1-14
1.0 Executive Summary
The Anaheim Resort Specific Plan 2.0 Planning Context
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
2.0 PLANNING CONTENT 2.2 Specific Plan Policies
2.1 Purpose of the Specific Plan
The Anaheim Resort, containing theme parks,
convention facilities and visitor -serving uses such
as hotels, is a unique type of land use
concentration that requires special consideration
and attention to ensure that the various elements
come together to create an exciting, attractive
environment. The unique synergy a destination
resort must have is not easily addressed by
traditional zoning. As a result, it is necessary to
establish a basic framework, which provides
planning policies and standards to assure that
visitor -serving facilities and theme park uses will
come together as an integrated whole. The
ARSP is intended to establish this framework,
thereby ensuring an attractive destination resort
environment.
In addition to overall planning policies, the ARSP
establishes comprehensive zoning regulations
and design guidelines, which recognize the
distinctive nature of tourist and convention -
oriented uses, and effectively implements the
policies of the ARSP. It also identifies the public
facilities and services that will be needed to
support the development and describes how the
project and its related improvements will be
phased.
The zoning regulations contained within this
specific plan in Section 7.0, Zoning and
Development Standards, are regulatory in nature.
Subsequent development plans and subdivision
maps must be consistent with both the ARSP
and the City of Anaheim General Plan. Any
situation or condition not specifically covered by
provisions contained within this specific plan will
be subject to the regulations of the City of
Anaheim Municipal Code.
2-1
The specific plan goals stated in Section 1.6
define the basis for the following specific plan
policies. They include:
• Enhance the urban destination area and
create a resort development;
• Establish a unified resort identity;
• Supply adequate visitor and convention
facilities to meet the long-term demand for
entertainment, convention, lodging, and retail
uses;
• Improve public facilities, services and
infrastructure to accommodate projected
growth;
• Improve the transportation system;
• Develop implementation measures to assure
that the area will be enhanced by high quality
development; and
• Protect and enhance surrounding uses.
The following subsections describe these policies
in more detail.
2.2.1 Create and Enhance an Urban
Destination Resort Environment
The primary planning policy for the ARSP is to
enhance an urban destination area and create a
resort environment that features the Anaheim
Convention Center, hotels, restaurants, theme
park attractions, and shopping and entertainment
opportunities. By enhancing this area, visitors will
be encouraged to stay for several days, and
enjoy the variety of recreation and entertainment
opportunities available.
2.2.2 Establish a Unified Resort Identity
In order to establish the identity of The Anaheim
Resort as a premiere destination resort, the
ARSP proposes that a unifying theme be
established throughout the ARSP area. This will
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
be achieved by establishing a consistent visual
language for the public areas that extend
throughout the ARSP area. The main
components of the unifying visual language will
be: architectural character and quality of the
buildings, landscape, signage, and street
furnishings.
The architectural character and quality of the
buildings proposed will be regulated through a
combination of setback requirements contained
in Section 7.0, Zoning and Development
Standards, and design guidelines contained in
Section 5.0, Design Plan, of this specific plan.
The landscape character of the ARSP will be
created primarily by extensive planting of trees,
shrubs and ground cover. Similarly, signage
within the ARSP area will present a unified visual
character through the use of compatible and
complimentary colors, forms, and typography.
Street furnishings, including lighting fixtures,
benches, pageantry, and entry statements will
also be selected to reinforce the overall identity
of The Anaheim Resort.
2.2.3 Supply Visitor and Convention
Facilities to Meet Long -Term Demand
Another important specific plan policy is to supply
the visitor and convention facilities that will be
needed to meet the long-term demand for
recreation, convention, and visitor -serving
activities. There are three primary types of
facilities needed to achieve this that are
addressed by this plan: hotels, convention
facilities and visitor -serving retail and
entertainment facilities.
• First, the ARSP provides for the development
of up to 32,625 hotel rooms within the
Commercial Recreation (C-R) District.
• Second, the ARSP provides for the ongoing
operation and expansion of the Anaheim
Convention Center, the largest convention
2-2
2.0 Planning Context
facility on the West Coast, and uses
supportive of this important facility.
• Third, the ARSP also provides for visitor -
serving retail and entertainment facilities
within the ARSP area.
2.2.4 Improve Public Facilities, Services
and Infrastructure to Accommodate
Growth
Another important specific plan objective is to
improve public facilities, services, and
infrastructure to accommodate the growth and
development that is planned to occur within the
ARSP area. The public facility components to be
improved as a result of the ARSP include: the
transportation infrastructure (described in Section
4.0, Public Facilities Plan), and the pedestrian
environment and the streetscape (described in
Section 5.0, Design Plan). The ARSP is designed
to create an inviting, integrated pedestrian
environment that provides convenient
connections throughout the ARSP area and the
adjacent Disneyland Resort. Important elements
of the pedestrian environment are the
landscaped parkways and pedestrian facilities
that are provided throughout the area. The ARSP
includes streetscape improvements that are
compatible with those in the Disneyland Resort
Specific Plan and which contribute to a unifying
visual character for the entire Anaheim Resort.
Improvements to underground infrastructure,
including the storm drainage, water supply,
electrical and sewerage systems and enhanced
public services are also provided.
2.2.5 Improve the Transportation System
An essential part of the specific plan is to identify
improvements to the transportation system so
that access to the ARSP area will be improved.
These improvements include a combination of
new access routes to and from 1-5 and local
roadway improvements.
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT
The ARSP area can also be easily accessed by
the Orange County Transportation Authority
(OCTA) bus lines and Anaheim Resort
Transportation, both of which provide
connections from nearby Metrolink/Amtrak and
future high-speed rail stations, including ARTIC
(Anaheim Regional Transportation Intermodal
Center), a multimodal transportation facility.
Day visitors to the ARSP area will have
convenient access to and from two new public
day -use parking facilities (described in more
detail in The Disneyland Resort Specific Plan).
These facilities will have a maximum capacity of
34,300 cars and will accommodate Anaheim
Convention Center, as well as theme park
visitors. Access from the parking facilities to the
Anaheim Convention Center will be by shuttle
bus or via the pedestrian walkway system.
Overnight visitors arriving by 1-5 may use the
same interchanges as day visitors but will be
directed to surface streets for access to hotels or
other facilities within The Anaheim Resort.
These facilities will complement those proposed
within the adopted Disneyland Resort Specific
Plan, which includes high -capacity public parking
facilities, pedestrian walkways, transportation
system(s), and pedestrian bridges .
2.2.6 Develop Implementation
Mechanisms to Assure Quality
Development
To assure the overall quality of the ARSP area,
the ARSP contains implementation mechanisms
that promote the design goals of the Plan. These
mechanisms include development regulations,
standards, and design guidelines, as well as a
public facilities plan. Section 5.0, Design Plan,
describes the design concepts that will be
implemented to provide a unified identity. The
City has also adopted an Identity Program for
The Anaheim Resort that has been developed in
2-3
2.0 Planning Context
conjunction with this specific plan and which is
also described in Section 5.0. The zoning and
development standards are contained within
Section 7 .0, Zoning and Development
Standards. They define the permitted uses and
establish setback standards, among other things.
2.2.7 Enhance and Protect Surrounding
Uses
Implementation of the ARSP will enhance and
protect the surrounding uses through the
following means. First, development setback
areas are created and maintained to provide an
aesthetically appealing, landscaped buffer
between the development in the ARSP area and
neighboring uses. Second, development in the
ARSP will incorporate 360-degree architecture
for Disney ARSP Properties to protect and
improve public views into the Specific Plan area.
Third, convenient access to the public parking
facilities from Interstate 5 minimizes the use of
local streets by visitors to the ARSP area. As a
fully integrated planning document, the ARSP
provides the overall policy direction (in this
Section, Section 3.0, Land Use Plan, and Section
4.0, Public Facilities Plan) as well as the
particular planning tools (Section 5.0, Design
Plan, and Section 7.0, Zoning and Development
Standards) needed to ensure that these goals
are achieved as development of the ARSP area
proceeds.
2.3 Authority and Scope of the
Specific Plan
The City of Anaheim's authority to prepare,
adopt, and implement specific plans is assured
by California Government Code, Article 8
Specific Plans, Section 65450 through Section
65457. Procedures for the adoption,
implementation, and amendment of specific
plans are provided in Chapter 18.72 Specific
Plans, of the Anaheim Municipal Code. The
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
Planning Commission must hold a public hearing
before it can recommend the adoption of a
specific plan by the City Council. The City
Council may then adopt the specific plan by
ordinance.
As required by Chapter 18.72 of the Anaheim
Municipal Code and California Government Code
Sections 65450 et. seq., this document and the
associated environmental impact reports that
have been prepared for the ARSP, Master
Environmental Impact Report No. 313 (MEIR No.
313), Supplemental Environmental Impact Report
No. 340 (SEIR No. 340), and Supplemental
Environmental Impact Report No. 352 (SEIR No.
352) specify the following in detail:
• The nature, location, density and size of all
existing and proposed land uses, including
open space.
• Vehicular and pedestrian circulation within
the project and surrounding area.
• The provision of essential urban services
including, but not limited to, energy, public
safety, public utilities, sewage, solid waste
disposal, storm water drainage, water,
recreation and other essential facilities which
may be needed to support proposed
development.
• Land use and other regulations that will
implement the specific plan.
• Programs, public works projects, and
financing measures to implement the specific
plan.
• A statement of the relationship of the specific
plan to the General Plan.
Chapter 18.72 also requires a development
schedule setting forth phasing of development
and target dates for completion. The ARSP is
intended to provide guidelines and regulations for
2-4
2.0 Planning Context
the future development of the ARSP area and
does not contain any proposals for specific
developments other than the Public Facilities
Plan. As such, it does not contain a phasing plan,
which establishes a precise sequence, time, and
level of development. Development of the ARSP
area will likely be spread over a number of years
as individual landowners renovate their property,
or replace existing buildings with new ones. SEIR
No. 340 has assumed thresholds of development
for modeling purposes in Year 2030 and contains
mitigation measures to ensure that infrastructure
improvements will be required commensurate
with development. For the Disneyland Forward
project, SEIR No. 352 has assumed for purposes
of analysis that Disney would implement the
Project over the next decades depending on
market conditions and contains mitigations
measures to ensure that infrastructure
improvements will be required commensurate
with development.
In addition, this document addresses subjects,
such as urban design, which are necessary and
desirable for implementation of the General Plan.
Further, this document provides information that
specifies how the proposed ARSP is in
conformance with the following findings, which
the Planning Commission and the City Council
are required to make prior to approving or
amending a specific plan:
• That the property proposed for the specific
plan has unique site characteristics such as
topography, location or surroundings which
are enhanced by special land use and
development standards;
• That the specific plan is consistent with the
goals and policies of the General Plan and
with the purposes, standards and land use
guidelines therein;
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
• That the specific plan results in development
of desirable character, which will be
compatible with existing and proposed
development in the surrounding
neighborhood;
• That the specific plan contributes to a
balance of land uses; and,
• That the specific plan respects environmental
and aesthetic resources consistent with
economic realities.
2.4 Relationship to City Planning
Documents and Regulations
This section describes the relationship of the
ARSP to other relevant City planning documents
and regulations.
2.4.1 Relationship to the General Plan
As previously mentioned, the ARSP is consistent
with the goals and policies of the General Plan.
Section 6.0, General Plan Consistency, includes
a discussion of each of the applicable General
Plan Element's goals and policies, and how they
are implemented through the ARSP.
2.4.2 Relationship to the Zoning
Ordinance
The ARSP defines zoning districts, regulations,
and development standards that will apply to the
ARSP area. In cases where the ARSP does not
address a particular situation, the regulations and
development standards contained within Title 18
of the Anaheim Municipal Code will apply. To the
extent the two differ, the ARSP's policies, design
guidelines, regulations, and development
standards will apply.
2-5
2.0 Planning Context
2.4.3 California Environmental Quality
Act Requirements
The California Environmental Quality Act (CEQA)
requires that local agencies, prior to taking action
on projects over which they have discretionary
approval authority, consider the environmental
consequences of such projects. An
Environmental Impact Report (EIR) is a public
document designed to provide the public,
responsible/trustee agencies, special districts,
and local and State government agency decision -
makers with an analysis of the potential
environmental consequences of project
implementation in order to support an informed
decision.
Pursuant to local and State CEQA Guidelines,
the City of Anaheim certified The Anaheim
Resort Specific Plan Master EIR No. 313 (State
Clearinghouse No. 91091062) in support of the
adoption of The Anaheim Resort Specific Plan
No. 92-2 in September 1994. Master EIR No. 313
evaluated impacts associated with the
establishment and implementation of the ARSP
and created a Mitigation Monitoring Program
(MMP No. 0085) in order to mitigate impacts
associated with ARSP area development. Since
being certified in 1994, two Validation Reports
have been prepared (1999 and 2004) to evaluate
the continued relevance and accuracy of Master
EIR No. 313 and its ability to be used as a
Master EIR for all projected development within
the boundaries of the ARSP area. In December
2012, the City certified Supplemental EIR No.
340 to reevaluate all the environmental changes
that have occurred in and around The Anaheim
Resort and to evaluate an expansion of the
Convention Center. Since being certified in 2012,
one Validation Report has been prepared (2019)
to evaluate the continued relevance and
accuracy of SEIR No. 340 and its ability to be
used as a Master EIR for all projected
The Anaheim Resort Specific Plan 2.0 Planning Context
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
development within the boundaries of the ARSP
area.
In 2021, to allow continued, long-term growth of
The Disneyland Resort, Walt Disney Parks and
Resorts U.S., Inc. (Disney) proposed
Disneyland Forward, an update to The
Disneyland Resort Project (1) to allow the
transfer of uses permitted under the Disneyland
Resort Project to other areas of the DRSP and
Disney ARSP Properties (Disney's Properties in
the DRSP and Disney ARSP Properties are
collectively referred to as "Disney Property" or
"Disney Properties") and (2) to provide for future
administrative review by the City of Disney's
development projects on Disney Properties.
Pursuant to local and State CEQA Guidelines,
the City of Anaheim prepared an Initial Study
which determined that certain potentially
significant environmental impacts might be
associated with development of the
DisneylandForward project. As a result, the City
prepared Subsequent EIR No. 352 (under
separate cover) which identifies impacts which
may result from the development of
Disneyland Forward and includes recommended
mitigation measures to lessen these impacts.
The City Council certified the Final Subsequent
EIR No. 352 for Disneyland Forward on [insert
date] and created a Mitigation Monitoring
Program (MMP No. 387) in order to mitigate
impacts associated with Disneyland Forward
development. SEIR No. 352 also provides the
environmental analysis required for the addition
of theme park uses in the ARSP Theme Park
East and ARSP Theme Park West Overlays and
the additional of parking uses in the ARSP
Parking Overlays. For non -Disney properties
located in the DRSP and the ARSP, EIR No. 311
and SEIR No. 340, including the associated
Mitigation Monitoring Plans, would continue to
apply to future development.
In addition to addressing the potential
environmental impacts that would result from the
ARSP Update and the Anaheim Convention
M
Center Expansion, Supplemental EIR No. 340
serves as the primary environmental document
for all future entitlements associated with the
ARSP, including all discretionary approvals
requested or required to implement the ARSP.
For the Disneyland Forward Project,
Supplemental EIR No. 352 serves as an
additional environmental document for all future
development associated with Disney Properties.
2.4.4 Relationship to The Disneyland
Resort Specific Plan
The City of Anaheim adopted The Disneyland
Resort Specific Plan (Specific Plan No. 92-1) and
certified Environmental Impact Report (EIR) No.
311 on June 29, 1993. The Disneyland Resort
Specific Plan provides for the development of an
international multi -day vacation destination resort
encompassing approximately 489.7 acres of The
Anaheim Resort. The Plan permits the
development of new theme parks, additional
hotels and entertainment areas, new parking
facilities, and an internal transportation system.
In addition, the Plan permits the existing
Disneyland and Disney California Adventure
theme parks to continue to be modified with new
attractions and other improvements.
In 2021, to allow continued, long-term of The
Disneyland Resort, Walt Disney Parks and
Resorts U.S., Inc. proposed Disneyland Forward,
an update to The Disneyland Resort Project. The
Disneyland Resort Project included updates to
The Disneyland Resort Specific Plan to allow the
transfer of theme park, hotel and other retail,
dining and entertainment uses, and parking
permitted in The Disneyland Resort Project and
to provide future streamlined review by the City
of Disney's development projects.
The City Council certified the Final Subsequent
EIR No. 352 for Disneyland Forward on [insert
date], which included environmental review for
The Anaheim Resort Specific Plan 2.0 Planning Context
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
development in the Southeast District as
envisioned by EIR No. 311.
Although they are separate projects, preparation
of the ARSP and The Disneyland Resort Specific
Plan were coordinated to ensure planning consis-
tency, and to ensure that elements of the plans
are complementary (for example, definition of
planning area boundaries, the design of the
streetscape improvements and the provision of
adequate infrastructure). Where appropriate,
references or descriptions of the programs
proposed as part of The Disneyland Resort
Specific Plan are included within this document in
order to provide the reader with a better
understanding of the relationship between the
planning concepts and programs proposed as
part of each of the two Specific Plans.
2.4.5 Relationship to the Hotel Circle
Specific Plan
On August 16, 1994, the City of Anaheim
adopted the Hotel Circle Specific Plan (SP 93-1)
for the remaining 6.8 acres of The Anaheim
Resort. This specific plan allows for the
development of up to 969 hotel rooms. All of the
parcels within the specific plan area are
developed with a total of 818 hotel rooms.
2-7
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
This page is intentionally blank.
2-8
2.0 Planning Context
The Anaheim Resort Specific Plan 3.0 Land Use Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
3.0 LAND USE PLAN
3.1 Regional Location
The Anaheim Resort Specific Plan (ARSP) area
is located in the City of Anaheim, which is 35
miles southeast of downtown Los Angeles and 7
miles northwest of Santa Ana, in Central Orange
County, California. Exhibit 3.1-1 (Regional
Location Map) shows the regional location of the
ARSP area. The ARSP area is generally located
southwest of the 1-5 corridor, south of Vermont
Avenue, east of Walnut Avenue, and north of
Chapman Avenue.
Exhibit 3.1-1 Regional Location Map
s Po_wden _ _
-t�
� k� 1 --
3.2 Existing Conditions
This Section contains a description of the ARSP
area and other relevant existing conditions.
3.2.1 The Specific Plan Area
The ARSP area is located within The Anaheim
Resort, an area designated by the City of
Anaheim General Plan for recreation and
tourist/convention-related activities along with
related visitor -serving uses. The Anaheim Resort
itself contains approximately 1,078 acres. Exhibit
3.2-1 (ARSP/The Anaheim Resort Boundaries)
shows the location of the ARSP area within The
Anaheim Resort. Harbor Boulevard, West
Street/Disneyland Drive, and Haster Street are
the main north -south thoroughfares through the
project area. Katella Avenue, Ball Road, and
Orangewood Avenue are the main east -west
thoroughfares. 1-5 also crosses through the
ARSP area.
3.2.2 Existing Uses
The current uses within the ARSP area include a
variety of commercial, retail, hotel/motel, and
visitor- and convention -serving uses. In addition,
some nonconforming uses such as mobile home
parks, and industrial and office facilities are
located in the ARSP area. The Anaheim
Convention Center is located on the south side of
Katella Avenue, west of Harbor Boulevard.
Residential neighborhoods consisting of single-
family homes and multiple -family dwelling units
are located south and west of the Anaheim
Convention Center and around the periphery of
The Anaheim Resort.
Exhibit 3.2-2 (Aerial Photograph with the ARSP
and The Anaheim Resort Boundaries) is an aerial
photograph of The Anaheim Resort. The limits of
ARSP area are also identified.
3-1
The Anaheim Resort Specific Plan 3.0 Land Use Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
Exhibit 3.2-1 1 ARSP/ The Anaheim Resort Boundaries
-Cerritos Ave
Clty of,
Anaheim
Katelld Ave
71
C[TY-BOUNDARY _
- � J
City of
Garden Grove
ve�rt;gle
4
city„of
-Anaheim
j
7z
n?r
s m`.
�t
c�
or
_Certito4 Ave
3
o;
m'
yl�
Orangewood Q,vg
Otelld:Ave l
_ City, of
I — r Orange
(_.Chapman Ave "L 1 —
ARSP/The Anaheim Resort Boundaries
LEGEND
The Anaheim Resort
L — Boundary
MAP FEATURES Notes/sources
The Anaheim Resort City regal tat Data. 2022
_ Specific Plan (92-2) City Boundary Data. 2022
The Anaheim Resort
Specific Plan Boundary
The Disneyland Resort
Specific Plan (92-1)
C J City Boundary
_ Hotel Circle
Specific Plan (93-1)
0 750 1,500
Feet
MARCH 2O24
The Anaheim Resort Specific Plan 3.0 Land Use Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
Exhibit 3.2-2 1 Aerial Photograph with the ARSP and The Anaheim Resort Boundaries
Aerial Photograph with the ARSP and The Anaheim Resort Boundaries
LEGEND
f�l The Anaheim Resort
1� J Boundary
The Anaheim Resort
Specific Plan Boundary
J City Boundary
Nat -/Sources
City legal Lot Data, 2022
City Boundary Data, 2022
0 750 1.500 O
Feet
3-3
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
3.3 Land Use Plan
This section contains a description of the land
use plan for the ARSP. In particular, it estab-
lishes the general policies that will govern land
use within the ARSP area. Section 7.0, Zoning
and Development Standards, contains specific,
detailed zoning and development standards,
which are based on the policies described herein.
The land use plan is based on three major
factors that will govern land use within the ARSP
area. For each of these three factors, the ARSP
provides a background rationale for the proposed
land use regulations, as well as a description of
the basic land use policies. They are:
• The land uses permitted in the Commercial
Recreation (C-R) and Public Recreation
(PR) Districts as well as in the Mobilehome
Park (MHP) Overlay, the Anaheim Resort
Residential (ARR) Overlay, the Theme Park
(TP) Overlay, and the Parking (P) Overlay;
• The maximum development density
permitted in the C-R District; and,
• The types of development standards that will
apply to development.
Exhibit 3.3-1 (Development Summary Plan) for
the ARSP, which shows the location of the C-R
and PR Districts, the Central Core, and the MHP,
ARR, TP, and P Overlays. Further information
regarding development densities permitted within
these development areas are depicted on the
maps on the following pages of the Land Use
Plan.
3.3.1 Land Use
As implied in its name, The Anaheim Resort is
intended for land uses with a commercial and/or
recreational emphasis. The presence of the
Anaheim Convention Center, the Disneyland
Theme Park and Disney's California Adventure
Theme Park has established The Anaheim
3.0 Land Use Plan
Resort as an important regional, as well as
national and international destination. In the
future, other similar attractions may be developed
in The Anaheim Resort. As a result, visitors to
The Anaheim Resort require many types of
goods and services in order to make their visits
safe, convenient and enjoyable.
Among the most common visitor requirements
are food and lodging. Consequently, in the
majority of the 518.5-acre C-R District, hotels,
motels and restaurants are permitted uses. In
addition, many service and retail businesses
intended to accommodate visitors, such as
barber or beauty shops, travel agencies,
automobile rental agencies, and specialty retail
shops, will also be permitted when integrated
within a hotel/motel development. Those uses
which are consistent with the overall intent of the
ARSP, but which may require special consider-
ation in order to assure compatibility with
surrounding uses will require conditional use
permits.
The 1.8 million square foot Anaheim Convention
Center, one of the major visitor destinations in
The Anaheim Resort, and the existing 1,600-
room Hilton Anaheim hotel are located in the
62.8-acre PR District (Development Area 2).
Development within the PR District is subject to
the requirements of the PR (Public Recreational)
Zone, which is intended to preserve, regulate,
and control the orderly use of City -owned
properties such as Convention Center complexes
and adjacent private properties. Other related
visitor -serving uses allowed in the District as
accessory uses are concession stands,
restaurants, and shops.
As part of Disneyland Forward, which amends
The Disneyland Resort Project, theme park uses
were introduced in the ARSP area within the TP
Overlay. The TP Overlay encompasses
approximately 57.75 acres and accommodates
3-4
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
up to 920,000 square feet of theme park uses
already approved in the DRSP as part of The
Disneyland Resort Project and up to 3,912 hotel
rooms which are allowed under the Specific Plan.
The intent of the TP West Overlay is to allow
development of theme park uses on ARSP
properties concurrently with the development of
theme park uses in the DRSP Theme Park
District. The intent of the TP East Overlay is to
allow development of theme park uses on ARSP
properties concurrently with the development of
theme park uses in the DRSP Southeast District.
Any amount of theme park square footage
constructed in the TP Overlay will result in an
equivalent amount of potential theme park
square footage removed from the allotment for
the DRSP Theme Park District such that the
maximum theme park square footage in the
DRSP Theme Park District, DRSP Southeast
District, and TP Overlay will not exceed
6,850,000 square feet.
As part of Disneyland Forward, the P Overlay was
introduced in the ARSP to permit parking spaces
for theme park uses, a limited amount of back -of -
house uses such as supporting office space, a
limited amount of retail and dining such as kiosks
along pedestrian pathways within the P Overlay,
and up to 1,650 hotel rooms which are allowed
under the Specific Plan. The P Overlay
encompasses 25.57 acres. The P Overlay along
Manchester Avenue north of the East Parking
Area of the DRSP Parking District allows
development of a portion of the number of
parking spaces approved for the East Parking
Area as part of The Disneyland Resort Project.
The intent of the P Overlay is to allow
development of these parking spaces
concurrently with the development of parking
facilities in the East Parking Area. The P Overlay
also allows development of up to 5,700 parking
spaces at the Harbor Boulevard and Ball Road
properties.
3.0 Land Use Plan
Section 7.0, Zoning and Development Standards,
contains a complete list of all the permitted
primary uses, as well as accessory uses,
conditional uses, and prohibited uses.
3-5
The Anaheim Resort Specific Plan 3.0 Land Use Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
Exhibit 3.3-1 1 Development Plan
�fAtaI0 kL/AIA pNFRL
o ,
' ,
v
d7� L�_..
Disneyland;
K'"IiAtiglia Theme: Farb;
_Cerritos Ave_
�I� rNchr[ PA♦fR wssr
City of e I i '1
aheim El) L `1 C%ema�Q Anr"
1
Katella Ave I
��- y bnrbnflon
�� Eenter
`O I
CITY BOUNDARY,
V ei rnr f"
l�_ 1
Cify'oft
nd Aheim
\, +)
X.
1
N�,
I.as
=_; r �
>I -_ `
—:. .
•�
:Cerritos Ave
r� �. �1
♦
r �� Kafella.f
` a
o,
@s, 9`
Orangewood`AGe
"� �
Ctty of � r— � � CITY BOUNDARY
Garden Grove I
- City of
El—
— — r Orange
— — Chapman;Ave — --..—,
Development Plan
LEGEND MAP FEATURES Notes/sources
The Ancheim Resort C-R District Mobilehome Park (MHP) GlyBouyLzalLot Data.2o22
Boundary (Development Area 1) Illlllliii0 Overlay within the C-R District Gnaary Dalo. D22
-� The Anaheim Resort PR District Theme Park (TP) Overlay
I_ r Specific Plan Boundary (Development Area 2) within the C-R District
City Boundary /�� Anaheim Resort Parking (P) Overlay
C J Residential (ARR) within the C-R District
Overlay _ i Central Core o Aso s,sooFeet �.J %)
��
MARCH 2O24
3-6
The Anaheim Resort Specific Plan 3.0 Land Use Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2024)
3.3.2 Commercial Recreation (C-R)
District Development Density
The ARSP establishes seven density
designations in the C-R District (Development
Area 1) that will help assure that development of
the area will be compatible with proposed
infrastructure and with the goal to protect
surrounding residential uses. These density
designations are based upon hotel/motel
development and allow up to 20% of each
hotel/motel project gross square footage,
excluding parking facilities, to be developed with
integrated (i.e., included within the main
hotel/motel complex) accessory uses. These
accessory uses will reduce the otherwise
maximum permitted hotel/motel density at the
rate of one hotel/motel room per six hundred
(600) gross square feet of accessory use. For
properties proposed to be developed with
permitted and conditionally permitted uses other
than hotels/motels with accessory uses, the
traffic generation characteristics of said uses
shall not exceed those associated with the other-
wise permitted hotel/motel (including accessory
uses) density as determined by the Planning
Director or designee prior to Final Site Plan
review and approval.
The seven density categories established by the
plan are:
• Low Density (up to 50 hotel rooms/acre);
• Low -Medium Density (up to 75 hotel
rooms/acre);
• Low -Medium Density (Modified) (up to 252
hotel rooms and 75,593 square feet of
accessory uses);
• Medium Density (up to 100 hotel
rooms/acre);
• Medium Density (Modified) (up to 345 hotel
rooms);
• Medium Density (Modified A) (up to 127
hotel rooms); and,
• Convention Center Medium Density (up to
125 hotel rooms/acre provided the trip
generation characteristics are equivalent to
100 hotel rooms/acre).
Exhibit 3.3-2 (C-R District Development Density
Plan), identifies the location of each density
designation within the C-R District.
The areas with the Low Density designation are
generally located where planned future
infrastructure improvements will not support more
intense development, or which are located further
from the area's attractions. Areas with the Low -
Medium and Medium Density designations are
located where planned future infrastructure will
be sufficient to accommodate these more intense
levels of development, and which are located
closer to the main attractions of The Anaheim
Resort. Areas immediately adjacent to the
Anaheim Convention Center have the
Convention Center Medium designation in
recognition that guests at these hotels typically
do not have automobiles and, therefore, place
fewer demands on area streets, one of the most
important infrastructure factors that tend to limit
development density. In addition, the Low
Medium (Modified) density designation allows
252 hotel rooms and 75,593 square feet of
commercial uses, which is equivalent to 378
hotel rooms, at the southeast corner of Katella
Avenue and Harbor Boulevard, the Medium
Density (Modified) density designation allows up
to 345 hotel rooms or its equivalent on South
Manchester Avenue and the Medium Density
(Modified A) density designation allows up to 127
hotel rooms on Clementine Street.
In recognition of the extensive existing
development within The Anaheim Resort, the
ARSP contains provisions, which permit existing
hotels/motels to renovate or rebuild at the density
existing on the date of adoption of the ARSP,
even if the density exceeds the maximum
WA
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
permitted by the density category in which the
property is located.
The C-R District also encompasses properties
that have a Mobile Home Park (MHP) Overlay
designation, an Anaheim Resort Residential
(ARR) Overlay designation, a Theme Park (TP)
Overlay designation, and a Parking (P) Overlay
designation.
3.0 Land Use Plan
3-8
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
3.0 Land Use Plan
Exhibit 3.3-2 1 Commercial Recreation (C-R) District Development Density Plan
\� �eiino�f pve:
L \
a 1f ` City of,
�1r
N Anaheim
Ball. Rtl' _
'��, pry = L'.S �(l i )Q —. 8all'Rci
7,
1 r �1
Drsneyiand
IF rh eme l ark
1f.�Magie�Way" �%
Cerritos Ave-
r ',0, - r�♦ C.Mtos-Ave
l4Lj
-
'�
J 4 r m City, of i rDisne
CI Of � • CA�Adventuie� II
Anaheim + II Therne„Park`
D
177
rIL
Katella Ave L Imo` K_a`tella A\
-
i
4
CDVBOUND'ARY ,_I
—. - ---- I Orangewood Ave'- �
wi
i-' _
City of CRY_BOUNDARY'
���' tr=—�
Garden Grove 1_ I i I --
_ _ I - } City of
_II — Orange —
CHapman Ave — -�
Commercial Recreation (C-R) District Development Density Plan
LEGEND
MAP FEATURES
r—, The Anaheim
Low Density Medium Density (Modified)
ss Ace 75 Rooms Up 10 345 Hotel Rooms
to 50 HotelwhiR
L_ Resort Boundary
or
perei s
The Anaheim
Low -Medium Density Medium Density (Modified A)
"` Up to 75 Hotel Rooms/Cross Acre or 75 Rooms
_ Resort S ecific
P
per parcel, whichever is greater Up to 127 Hotel Rooms
Plan Boundary
Low -Medium Density (Modified) ♦ Convention Center Medium
Up l0 125 Hotel Rooms/Goss Acre 75
C City Boundary
Up to 252 Hotel Room vrith 75.593 squa a feet of \\\� or
accessory uses rooms per parcel. whichever is greater'•
Medium Density
perlporo eHwhkhe msfGross Acre or 75 Rooms
'\'\` greater
Notes/Soraces
City Legal Lot Data, 2022
Q1Y Boundary Dal.. 2D22
--With trip generation characteristics
mitigated to the equivalent of 100 rooms
per gross acre.
0 750 1,500
Feet 0
MARCH 2O24
3-9
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
3.3.3 Mobilehome Park (MHP) Overlay
The C-R District includes three properties on
approximately 31.5 acres, which have a
Mobilehome Park (MHP) Overlay designation.
The MHP Overlay encompasses two existing
mobilehome parks and a recreational vehicle
(RV) Park. The properties within the MHP
Overlay are subject to the requirements set forth
in Chapter 18.26 of the Anaheim Municipal Code,
which provides development standards,
regulations, and procedures to mitigate relocation
problems and adverse effects of displacement
upon mobilehome owners when a park is
converted to another land use. Exhibit 3.3-3
(Mobilehome Park (MHP) Overlay in the C-R
District) identifies the parcels that are subject to
the MHP Overlay in the C-R District.
3.3.4 Anaheim Resort Residential (ARR)
Overlay
The Anaheim Resort Residential (ARR) Overlay,
which is located on 59.3 acres within the C-R
District, allows for conditionally permitted
residential uses in conjunction with the
development of a full service hotel having at least
300 hotel rooms and where (i) hotel uses
comprise at least half of the site density, (ii)
residential uses on the site are fully integrated
into the hotel, and (iii) adjacent to public rights -of -
way, residential uses are at least two stories or
25 feet above ground level. Exhibit 3.3-4
(Anaheim Resort Residential (ARR) Overlay in
the C-R District) identifies the parcels that are
subject to the ARR Overlay in the C-R District.
3.3.5 Public Recreation (PR) District
Development Density
The 62.8-acre Public Recreation (PR) District
(Development Area 2) encompasses the
Anaheim Convention Center and associated
parking complexes, and the 1,600-room Hilton
Anaheim hotel. Development within the PR
District can include up to 2,158,363 square feet
3.0 Land Use Plan
of convention center/meeting space; 100,000
square feet of outdoor programmable space;
2,500 hotel rooms; and 180,000 square feet of
commercial space. Development within this
district is subject to the requirements of the
Public Recreational (PR) Zone. The purpose of
the PR Zone, which is set forth in Chapter 18.14
(Public and Special -Purpose Zones) of the
Anaheim Municipal Code, is to preserve, regulate
and control the orderly use of City -owned
property and adjacent private property. Exhibit
3.3-5 (Public Recreation (PR) District) identifies
the parcels that are subject to the PR District.
3.3.6 Theme Park (TP) Overlay
The TP Overlay includes the TP East Overlay
and TP West Overlay, which are located within
the C-R District. The TP East Overlay includes
approximately 52.6 acres and currently includes
the Toy Story surface parking lot associated with
The Disneyland Resort. The TP East Overlay
allows development of up to 840,000 square feet
of theme park uses permitted in the DRSP as
part of The Disneyland Resort Project and up to
3,348 hotel rooms, which are allowed under the
ARSP. The TP West Overlay includes
approximately 5.15 acres and currently
encompasses the existing Pixar Pals Hotel and
associated parking structure. The TP West
Overlay allows development of up to 80,000
square feet of theme park uses permitted in the
DRSP as part of The Disneyland Resort Project
and up to 564 hotel rooms, which are allowed
under the ARSP. Exhibit 3.3-6 (Theme Park (TP)
Overlay in the C-R District) identifies the parcels
that are subject to the TP Overlay.
3.3.7 Parking (P) Overlay
The Overlay includes two separate areas, one
along Manchester Avenue, immediately north of
the DRSP Parking District East Parking Area,
and one at the northeast corner of Harbor
Boulevard and Ball Road, both of which are
3-10
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT
located in the C-R District. The P Overlay at
Manchester Avenue includes three properties on
approximately 14.88 acres and allows
development of a portion of the parking spaces
permitted and allocated to the DRSP Parking
District East Parking Area and up to 1,116 hotel
rooms, which are permitted under the ARSP. The
P Overlay at Harbor Boulevard and Ball Road
includes five properties on approximately 10.69
acres and allows up to 5,700 parking spaces and
development of up to 534 hotel rooms, which are
permitted under the ARSP. Exhibit 3.3-7 (Parking
P Overlay in the C-R District) identifies the
parcels that are subject to the P Overlay.
3.0 Land Use Plan
3-11
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH
Exhibit 3.3-3 1 Mobilehome Park (MHP) Overlay in the C-R District
3.0 Land Use Plan
♦
� gve
1
11��♦_ �
lt� City,
of,
Anaheim
Ball _Rc]'
'o
Ball, Rd,
S'
rm'
Drsnaylcgd
A ♦ c
r `
I STlserii'e`:garla
�ytoglc„1GJ,aya
� r♦
r
VP
;Cerritos _Ave 1 O�
_• ++
6 (f - �`�r-o _ Cerritgs_Ave
00
City of �,1
"� CI1,Ailvs fne ure
Dhne, NL Y
�W -
f I ��
w
Anaheim ,.� l TlemePaik;
1
03-k\.
Katella Ave
T )Catella A
eearN
�
I �
NC
cm
r _� BOUNDARY I
Orangewood Ave
N.
Ct of L'� I Cln'BOUNDARY;
Garden Grove (( I—
_ _ 1 -- I City of
IOrange
.Chapman Ave L e —
Mobilehome Park (MHP) Overlay In C-R District
LEGEND MAP FEATURES Notes/sau.*s
�Parcels subject to the Mobilehome Park City Legal Lot Data. 2022-j The Anaheim Resort Boundary Overlay Zone in the C-R District City Boundary Data,2022
'e The Anaheim Resort
Specific Plan Boundary
J City Boundary
0 750 1.500 A
Feet 4�
3-12
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH
Exhibit 3.3-4 1 Anaheim Resort Residential (ARR) Overlay in the C-R District
Vecrn°nt Ave
sl `
City Oft
a
&.
Anaheim
��
�-' a�
% `�
Baf_IRd'
Ir I Lk=f T�
F
-Ball, Rd,
p`►� 1
1 y
�
t
f tpti,
—
A co"
orayio�d�
i �
Magic tWgy
flieme`Fark:
L
r
r
-Cerritos Ave
_O.�
�,,� I 1\cy Cemlos Ave
D
4 1
city Of �.
I
2A,_Aare'funfun re
Disney - ay
5
I i1
An
Anaheim �'
II
Theme Park
t
jIn-
3.0 Land Use Plan
Kaiella Ave r�or B — — r - �_ ® r I� ICgfella Ave"
9�
I� y �
— 1
— — grangewopd_Ave
CRY BOUNDARY __
i1r�
I_
I ] I
City of S�" ' tom— _ CnYBOUNDARY
Garden Grove rl I
I - l City of
Orion
" :Chapman Ave
Anaheim Resort Residential (ARR) Overlay in the C-R District
LEGEND MAP FEATURES Notes/sources
Parcels subject to the Anaheim Resort Cilytegal Lot Dala,2M
The Anaheim Resort `
Boundary Residential Overlay Zone in the C-R District CityBoundaiyDala,2022
The Anaheim Resort
I. Specific Plan Boundary
C J City Boundary
D 750 1,5w
� Feet
MARCH 2O24
3-13
The Anaheim Resort Specific Plan 3.0 Land Use Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2024)
Exhibit 3.3-51 Public Recreation (PR) District
V`
City, of,
Anaheim
Ball: Rd 7—
B�dll Rd;
L
I'a
DisneyfuRd
rh F,,k
IF
�:enrltqs-Ave
ur
r %
C y of it CA A dv enfuroAiaheim—TR%
Ir
Lc
Katelia Ave L r-�(—j
Ana .1
C_Cent. h..1%.
--L�l
10
-71
CITY BOUNDARY
J �; I .-1I I
WO W %,
L-y' P I!
City of CRY BOUNDARY:
Garden Giove J
I
r
7 City of
L Orange
Chdpff(d n Ave
Public Recreation (PR) District Plan
LEGEND MAP FEATURES
The Anaheim Resort Parcels in the PR District
Boundary
The Anaheim Resort
Specific Plan Boundary
City Boundary
Notes/Sources
City Legal Lol Do1c. 2022
City Boundary Data, 2022
0 750 I'sw
8NEEEEE10======= Feet 0
MARCH 202i
3-14
The Anaheim Resort Specific Plan 3.0 Land Use Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
Exhibit 3.3-6 1 Theme Park (TP) Overlay in the C-R District
yem°^t Ave �i.
� city,o! �
Or e® *
r An Anaheim
µ
1
Ball Rd BaII Rd
rt� d �o r
II
n�.
I J
A a ��
I ��
r
r�
im
-Cerritos _Ave ri
_,
'(3
----
°
I
qc
O'
a
a
r —i—�
RIW- {1ARK'W-11
Cfty Of c --J
I CA
DisoeyWgy N\
Ad�enfu`re
Anaheim = L
f
ICatella_ Ave e- i i r �1� Katella Ave_
w" r 7 —a
moAdli I
_ c:enr
— ..
I
TXEMEPARKEAST r a
N
CRYBOUNDARY,_I
r -- — —"" - — —
_ 1
drdngewood Ave
I FA
City of LEI r_ _ CRY BOUNDARY
Garden Grove
I City of
4� Orange ✓
:Chapman Ave "L — — —y
Theme Park (TP) Overlay in the C-R District
LEGEND MAP FEATURES I Notes/sources
�-j 022
The Anaheim Resort Parcels subject to the Theme Park city&— Loy 13Wto oio.z02
Boundary Overlay (East and West) Zone in the C-R District caysovntloryooro.zozz
'+ The Anaheim Resort
I— Specific Plan Boundary
J City Boundary
0 750 1,500 ■1
Feet i��
3-15
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH
3.0 Land Use Plan
Exhibit 3.3-7 1 Parking (P) Overlay in the C-R District
�, ve�otii P_ve
t ' ► City, of
Anaheim
Bd_II 'Rd m-. t
�� -- ��� ,la_ �. ➢ Ball Rd
1 �f
'lliern'e. Palk_. ,
�1v18�it,4,W5y' Lr � 4
' f —�
I �.
Cerritos Ave r y -Ql
= Cerritos Ave_
C
of '1
- r A Adranlurr � 1
ACity naheim =� ...I theme pork
�I-
Kafella Aye —,r-� I _ r KaJella Ave
II
s �P
i + q S�
I_— e
CDl'BOUNDARY I _
r — — � — J O�angewood:d_ve
City of CRY BOUNDARY
Garden Grove I I
I City of n
Orange
—I Chapman Ave- ` — — — —
1
Parking (P) Overlay in the C-R District
LEGEND
17—, The Anaheim Resort
Boundary
— The Anaheim Resort
Specific Plan Boundary
C J City Boundary
MAP FEATURES
—Parcels subject to the Parking
Overlay Zone in the C-R District
Notes/Sowaes
City, legal Lot Dafa. 2022
City Boundary Data, 2022
0 750 1,500
Feet
3-16
The Anaheim Resort Specific Plan 3.0 Land Use Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
3.3.8 Central Core Development
Standards
The third factor affecting land use within the
ARSP area are the additional development
standards applied to parcels in the heart, or
Central Core, of The Anaheim Resort. The
Central Core includes parcels with frontage on
Harbor Boulevard between 1-5 and Orangewood
Avenue, and all parcels with frontage on Katella
Avenue between Haster Street/Anaheim
Boulevard and Walnut Street. For reasons
described in the next paragraph, the Central
Core requires different standards than does the
periphery, especially with respect to building
massing and provision for pedestrians. The
Central Core is depicted in Exhibit 3.3-8 (Central
Core Plan).
Development on the parcels within the Central
Core has an especially important role to play in
creating an overall image for The Anaheim
Resort. Inasmuch as the Central Core is in close
proximity to The Anaheim Resort's major
attractions, the potential for pedestrian use is
greatest in this area. By making the Central Core
a more interesting area to walk through, the
Central Core development standards will
encourage more people to leave their cars and
walk, thereby improving vehicular traffic flow. The
uses adjacent to these stretches of road within
the ARSP area will also have a stronger visual
impression on the large number of vehicles that
pass through it each day.
Among the differences in development standards
between the Central Core and the periphery are
the following:
• In the Central Core, no parking will be
allowed between the public right-of-way and
the building face, making the Central Core
more visually interesting since the parked
vehicles will be behind the buildings.
Whereas in the periphery, parking is allowed
in front of a building provided said parking is
not within the minimum required setback
from the public right-of-way;
• Buildings in the Central Core will be required
to occupy a minimum of 60% of the frontage
adjacent to the right-of-way (or provide a
solid mass of landscape to achieve the
same effect) in order to create a well-defined
"edge" for the street. No such restrictions will
apply to parcels outside the Central Core;
and,
• Special Landscaped Intersections will be
required at the entrances to The Anaheim
Resort and the center of the Central Core to
create an edge and orient the pedestrian
visually.
These special development standards for the
Central Core are described in Section 7.0,
Zoning and Development Standards. Section 5.0,
Design Plan, also contains guidelines which
distinguish one area from another.
3-17
The Anaheim Resort Specific Plan 3.0 Land Use Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
Exhibit 3.3-8 1 Central Core Plan
C � V etrt'o�tAve
S
o I` C1ty ,Of
Anaheim
w
Ball Rd` - _ s e�7-� =-C .:.
fi'dII Rd
IL
a,
Diineylond�
tTFiemeYgark..
-Cerritos�Ape p r�\
%-Cerritos Ave
C
o: —
�t \
Gify, of F �
CAA ,enfu`ie
Anaheim I Theme7Rark
�v ,
Kdtellq Ave - aa � KaYella Ave
-� • I I C6nViliflon I J I y 1
Cr
W%% GYP
CNY_BOUNDARY.
City of
Garden Grove
Central Core Plan
LEGEND
I—, The Anaheim Resort
Boundary
The Anaheim Resort
I. r Specific Plan Boundary
C J City Boundary
:Orangewood Ave:
r� C1rY BOUNDARY]
r l City °f I
— Orange
Chapman Ave — —
MAP FEATURES
Central Core (Standards and guidelines apply to
Vroperties with frontage along these portions of
atella Avenue and Harbor Boulevards
Special Intersection Landscape Treatment
Harbor Boulevard/Katella Avenue Central Core
Intersection Area described in The Anaheim
Resort Public Realm Landscape Program
Notes/Sources
City Legol Lot Data. 2022
City Boundary Doto, 2D22
0 750 1,500
feet
MARCH 2O A
3-18
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT
3.4 Non Visitor -Serving Uses
In order to foster the establishment and growth
within The Anaheim Resort of tourist, convention
and entertainment -related industries, such as
theme parks, hotels, motels, vacation ownership
resorts, tourist -oriented retail and entertainment,
restaurants, movie theaters, convention and
conference facilities and other visitor -serving
facilities, and recognizing that the presence of
non -visitor -serving uses in The Anaheim Resort
would be incompatible with this goal, residential
uses may only be permitted in limited areas of
the ARSP area as provided by and in accordance
with the Anaheim Resort Residential (ARR)
Overlay (Anaheim Municipal Code Section
18.116.125) in effect as of March 19, 2007
(conditionally permitted residential uses in
conjunction with the development of a full service
hotel having at least 300 hotel rooms and where
(i) hotel uses comprise at least half of the site
density, (ii) residential uses on the site are fully
integrated into the hotel, and (iii) adjacent to
public rights -of -way, residential uses are at least
two stories or 25 feet above ground level, and
residential uses are also permitted as provided
by and in accordance with the Mobile Home Park
(MHP) Overlay (Anaheim Municipal Code
Chapter 18.26) in effect as of March 19, 2007.
No other residential uses shall be incorporated
into the Commercial Recreation land use
designation and/or allowed within the ARSP area
without (i) completion of an Environmental Impact
Report prepared in accordance with the
requirements of the California Environmental
Quality Act, (ii) completion of a long-term
economic impact analysis of the proposed
change by an independent financial advisor
retained by the City, (iii) approval by the City
Council, and (iv) approval of a majority of voters
of the City of Anaheim at a regularly -scheduled
municipal election.
3.0 Land Use Plan
3-19
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
This page is intentionally blank.
3-20
3.0 Land Use Plan
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
4.0 PUBLIC FACILITIES PLAN
The Public Facilities Plan contains a description
of the proposed plans for transportation, utilities,
infrastructure, and services for the ARSP area.
The first two subsections describe regional
improvements, which have an impact on the
ARSP area. The improvements described under
each of the remaining sections are intended to
summarize the infrastructure/services needed for
the complete build -out of The Anaheim Resort.
More detailed information concerning the public
facilities is provided in SEIR No. 340 and SEIR
No. 352, which contain detailed maps and
exhibits, including a thorough discussion of the
existing conditions within the ARSP area.
4.1 Regional Circulation
Programs
Currently, several major facilities provide
vehicular access to the ARSP area. They
include: 1-5, Katella Avenue, Haster
Street/Anaheim Boulevard, Ball Road, Harbor
Boulevard, Chapman Avenue, and Disney Way.
Secondary roads within the ARSP area include:
Manchester Avenue, Clementine Street,
Orangewood Avenue, Walnut Street, West
Street, and Disneyland Drive. All other streets
within the ARSP area are Local Streets, including
Alro Way, Casa Vista Street, Vermont Avenue,
Wilken Way, and Zeyn Street.
Many roads within the ARSP area have been, or
are anticipated to be improved, in connection
with other local, county, and State circulation
programs. Facilities in this category include:
• 1-5, interchanges at West Street/ Disneyland
Drive, Harbor Boulevard/Ball Road, Katella
Avenue/Disney Way/Anaheim Boulevard,
Gene Autry Way, and Orangewood Avenue
4.0 Public Facilities Plan
have been improved as part of the 1-5
widening;
• Katella Avenue has been improved and will
be further widened as part of the Orange
County Smart Street Program; and,
• Several intersections have been identified in
the City's Planned Roadway Network to
receive additional supplemental turning lanes,
including but not limited to, Harbor Boulevard
and Katella Avenue, Katella Avenue and
Anaheim Boulevard/Haster Street, Harbor
Boulevard and Ball Road, Harbor Boulevard
and Convention Way, and Haster Street and
Gene Autry Way.
Improvements are funded by State and Federal
funds, Orange County's Measure M funds, City
Traffic Impact Fees, as well as other public and
private sources.
As part of DisneylandForward, which amends
The Disneyland Resort Project, previously
contemplated extensions of Gene Autry Way
east of Harbor Boulevard to Haster Street and
Clementine Street from Katella Avenue to
Orangewood Avenue were removed to allow for
application and buildout of the DRSP Southeast
District and the TP East Overlay. From Haster
Street, the existing Gene Autry Way connects to
the 1-5 high occupancy vehicle (HOV) lanes and
the Platinum Triangle.
Exhibit 4.1-1 (Vehicular Circulation Plan) shows
the existing circulation system as well as planned
improvements to the existing system described in
the preceding paragraphs. The Transportation
and Traffic Sections of SEIR No. 340 and SEIR
No. 352 also contain detailed information on the
existing circulation system.
4-1
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
Exhibit 4.1-1 1 Vehicular Circulation Plan
4.0 Public Facilities Plan
�i♦ `�` V ercAo�t -Aye
City of
s r Anaheitm'
S `JDoll Rd
1 } •��PAYIFKiN6�.
I I for — Ball_Rd;
—� �% <;
f?
Paklwairig,
- idr'e"o. D'ianeylbnd.
�NiU¢IE?G�JSy' `T►reme�Park
I ` 1
,Cer, ritos Ave-
4 N, ♦ Cerritos-Ave
s
c O OVERL't41;.60S
•Q ___� ®m. S�
a 7 J i
�l rjE%PARK WEST Ltp ,
O - VERUY` -
City ofr J Divi—efy W�a'1y�� t�
Anclheim j JI� 7&4k ePgrk ` o
L L
Kgtellq AYe L t — r ` e �'
�O' ryrMr I'.IRI•. ra,sr
7 II C OVcRl.RY C X
��I 9
I P
[IiC BOUNDARY.
r
111
y I 1i I
I �I
yL
CIIYROUNDAFYI
I �
City of
r Oiange
_ ClidpmanAve L — — —
Vehicular Circulation Plan
LEGEND
MAP FEATURES
r _, The Anaheim Resort
Partially Completed AR SP
a� Boundary
Vehicular Circulation Improvements
The Anaheim Resort
`Carnh'vnl'wn alcwnpk1e andnpnalnirgtobe
°named""""RetlevB1op eM
l� r Specific Plan Boundary
C Lane Configurations Modified Due
City Boundary C
J
to Removal of Gene Autry Way -
�RelerrosERaszxcmnarytea�-oar.Padanan
Modified
Due NRe �IdC e�/wrryrwl�
S Pro posed Traffic Signal
(o dex'pimnoi R�apared4airc sgn�oblS�
Feasible Improvements
Proposed
IReln to SEIR 3525ecRon 511
-uan: odarronlordesviplion of
rea:ie� ImPra.'emenh ttoPo>ca1
Existing Theme Park
Drop Off Area
Proposed Theme Park
�lDorcooBDon )ff, Area
prop OII AraeaRu epP'obnolelPo4
Notes/Sources
City Legal Lot Data, 2022
City Boundary Data, 2022
0 750 11500
Feet
MARCH 2O24
4-2
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
4.2 Regional Infrastructure
Programs
The Anaheim Resort is located in an area that
has been served by public utilities and facilities
for many years. As part of ongoing efforts to
improve the City's infrastructure, new facilities
have been installed within the ARSP area, are
currently planned, or are underway. Some of
these (such as improvements to the regional
sewage treatment facilities) are planned to
proceed regardless of the activity in the ARSP
area. Among the projects currently proposed are:
• Enlargement of sewers, or parallel lines to
handle increased flows;
• A new water transmission main and a new
water well to supply increased demand;
• Construction of a new electrical substation
facility;
• Upgrades to existing and construction of new
storm drain facilities; and
• New larger water mains (16" in Harbor Blvd.
from Orangewood Ave. to Chapman Ave.)
and a new well to supply increased demand.
These projects are discussed in greater detail in
SEIR No. 340.
4.3 Vehicular Circulation Plan for
the Anaheim Resort
Convenient automobile access to The Anaheim
Resort is an essential component to the success
of the area. Most visitors will come to The
Anaheim Resort by automobile or bus, and it is
especially important that the visitors' experience
be pleasant upon both arrival and departure.
In connection with The Disneyland Resort,
several improvements to the area wide
circulation system have been implemented.
4.0 Public Facilities Plan
These improvements are more fully described in
The Disneyland Resort Specific Plan. The
following is a discussion of the circulation
improvements completed or proposed for The
Anaheim Resort including those improvements
completed as part of The Disneyland Resort
Specific Plan.
4.3.1 Connections to Interstate 5 (1-5)
Convenient connections from 1-5 to the proposed
public parking facilities in The Disneyland Resort
have been implemented. Approximately 70% of
the visitors to The Disneyland Resort arrive on I-
5. Moving them on and off 1-5 safely and
efficiently is accomplished in a variety of ways.
During the early stage of implementation of The
Disneyland Resort Specific Plan, a new mixed
flow off -ramp was constructed at the Disneyland
Drive exit north of Ball Road. This permits
southbound traffic to exit to Disneyland Drive and
then onto a ramp that provides a direct link to the
public parking facility in the West Parking Area of
The Disneyland Resort Specific Plan Parking
District.
When the traffic leaving the parking facilities in
The Disneyland Resort exceeds the traffic
entering these facilities, the lanes leading into the
parking facilities and crossing over Ball Road are
reversed, permitting visitors to exit conveniently
onto 1-5. Generally, the lanes are used for
inbound traffic in the morning and for outbound
traffic in the afternoon and evening. Use of the
interchange by those not visiting The Disneyland
Resort and/or not in a HOV, have also been
accommodated.
A similar system permits visitors arriving from the
south to exit the HOV lane on a ramp that travels
under the elevated portion of 1-5 directly to
Disney Way and provides convenient access to
uses located in the east part of the ARSP area.
4-3
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
This system keeps The Anaheim Resort traffic
from congesting traffic on Katella Avenue.
Existing access patterns to surrounding
properties have generally been maintained,
except that West Street was made into a cul-de-
sac south of Ball Road and renamed West Place.
In addition, Cerritos Avenue has been relocated
approximately 1,000 feet north of its previous
location. The relocated street section is named
Magic Way and was constructed when West
Street was realigned south of Ball Road.
4.4 Anaheim Resort Arterial/
Secondary System
One of the important objectives of the ARSP is to
minimize traffic impacts on surrounding arterial
and secondary streets. The system of
connections to 1-5 that lead conveniently to area
uses contributes significantly to this objective. In
addition, improvements that have been
completed since the 1994 adoption of the ARSP
or are proposed to be made to the local streets
will enhance the overall vehicular circulation
within The Anaheim Resort. The street cross
sections described in this Section are typical mid -
block sections. They are not intended to depict
every condition which may exist in the ARSP
area. Additionally, more detailed information
about street rights -of -way can be found in the
Design Plan. They are subject to variation at
intersections and at other locations as
determined by the City Engineer.
4.0 Public Facilities Plan
Exhibit 4.1-1 (Vehicular Circulation Plan) shows
the location of the major roads and streets within
the ARSP area. The specific improvements
proposed for each street are discussed on the
following pages. Exhibit 4.4 (Cross Section Street
Segments Within The Anaheim Resort) depicts
the segments of the designated road cross
sections, which correspond to the proposed
improvements described for the following major
roads and streets:
• Disneyland Drive (Exhibits 4.4-1 and 4.4-2);
• West Street (Exhibit 4.4-3);
• West Place (Exhibit 4.4-4);
• Disney Way (Exhibit 4.4-5);
• Katella Avenue (Exhibits 4.4-6 to 4.4-7);
• Walnut Street (Exhibit 4.4-8);
• Harbor Boulevard (Exhibits 4.4-9 to 4.4-12);
• Ball Road (Exhibits 4.4-13 to 4.4-15);
• Clementine Street (Exhibit 4.4-16);
• Haster Street/Anaheim Boulevard
(Exhibit 4.4-17);
• Convention Way (Exhibit 4.4-18);
• Gene Autry Way (Exhibits to 4.4-19;
• Manchester Avenue
(Exhibits 4.4-20 to 4.4-23);
• Orangewood Avenue (Exhibit 4.4-24);
• Chapman Avenue (Exhibit 4.4-25);
• Alro Way (Exhibit 4.4-26);
• Casa Vista Street (Exhibit 4.4-27);
• Vermont Avenue (Exhibit 4.4-28);
• Wilken Way (Exhibit 4.4-29); and,
• Zeyn Street (Exhibit 4.4-30).
4-4
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
As a part of Disneyland Forward, the planned
extensions of Clementine Street south of Katella
Avenue and Gene Autry Way between Harbor
Boulevard and Haster Street were removed from
the Circulation Element of the City of Anaheim
General Plan and the Specific Plan. For that
reason, the previous Cross -Sections 18
(Clementine Street, south of Katella) and 21
(Gene Autry Way between Harbor and Haster)
were removed from Exhibit 4.4 (Cross -Section
Street Segments Within The Anaheim Resort).
4.0 Public Facilities Plan
4-5
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
Exhibit 4.4 1 Cross Section Street Segments Within The Anaheim Resort
4.0 Public Facilities Plan
1 ,
♦, O v6�mont Pie
,
a. City of
µ Anaheim
_ 1
BaII:Ra 13 -• ball Rd
4e 4 .!1
�.- _
3
Disneyland
Theme Park 20 \
�Iv1c�Ic: VJb� v
I i
ya21+
,CemtosAve e a?,
II a 6— 22, Cemfos Ave_
r � w
l' `r
a
nii= v.%y 36
Y
Ci/tCA Ad
Anaheim Theme Pprk j1 {II -
30
Katella Ave 7 T _ L —_ b
�---
17
a
t4
C11Y BOUNDARY I
Orangewood.Ave
A
Kafella, "Ave_
C t t i9 r CRY BOUNDARY'
Garden, Grove' p _ I ,
_ -� City of
r r Orange
I
Chapman Avg I— — — — — —
Cross Section Street Segments
LEGEND
[_-IThe Anaheim Resort
Boundary
MAP FEATURES
�� Segments of the Designated Road
Nots/Sourcrs
cityl_n lotoato.202
CtyBoundary Data, 2022
— '2� The Anaheim Resort
I— Specific Plan Boundary
Specific Plan 92-1
Boundary
J City Bounds
Specific Plan 92-2
S ® p
Specific Plan 93-1
NOTE.
The numbers shown in the map above conespond
To street cross sections spectried within Section 4.4,
Anaheim Resart Arterial/Secondary system (with
the prefix 4.4-X).
0 750 ".0
Feet
MARCH 2O24
4-6
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
Disneyland Drive between 1-5 and Katella
Avenue serves both The Disneyland Resort and
uses within the ARSP area such as the Anaheim
Convention Center.
Disneyland Drive is connected to 1-5 with an
interchange. Between 1-5 and Ball Road,
Disneyland Drive accommodates traffic arriving
or departing from The Anaheim Resort, including
the public parking facilities in The Disneyland
Resort, the Anaheim Convention Center and
area hotels. Exhibit 4.4-1 (Disneyland Drive
(North of Ball Road) Cross Section), shows the
typical right-of-way, parkways, sidewalks and
travel lanes for this portion of Disneyland Drive.
Exhibit 4.4-1 Disneyland Drive (North of
Ball Road) Cross Section
r 5-foot sidewalk 5-foot sidew
8-foot parkway 8-foot parkway
3 travel lanes, 3 travel lanes,
typical typical
13 ft 36 feet min 36 feet min 13 ft
i Right-of-way: 98 ft min
At Ball Road, traffic on Disneyland Drive may
either go over Ball Road directly to and from The
Disneyland Resort parking facilities via a two
lane overpass with reversible lanes or through
the Ball Road intersection. Traffic bound for other
destinations has full access to Ball Road. South
of the Ball Road intersection, Disneyland Drive
has two basic cross section conditions.
The first cross section is described and depicted
in The Disneyland Resort Specific Plan and
applies to the portion of Disneyland Drive located
south of Ball Road up to the entry to The
Disneyland Resort parking facilities.
4-7
4.0 Public Facilities Plan
The second cross-section applies to the portion
of Disneyland Drive located south of The
Disneyland Resort parking facilities to Katella
Avenue. This cross-section is depicted in Exhibit
4.4-2 (Disneyland Drive (Between 825 feet n/o
Katella Avenue and 1,350 feet n/o Katella
Avenue)). This portion of Disneyland Drive
provides access to hotels and other uses within
The Anaheim Resort. The cross-section depicts
two northbound and two southbound lanes of
traffic separated by a raised landscaped median.
Right and left -turn lanes have been installed in
some locations to improve traffic flow.
Exhibit 4.4-2 Disneyland Drive (Between
825 feet n/o Katella Avenue and 1,350 feet
n/o Katella Avenue) Cross Section
8-foot sidewalk 8-foot sidewalk
Landscaped
8-foot parkway median 8-foot parkway
2 travel 2 travel
lanes lanes
v
16ft 24ft 15ft 24ft 16ft
Right-of-way: 95 ft min {
West Street is a continuation of Disneyland
Drive, south of Katella Avenue. Supplemental
turning lanes have been added to Disneyland
DriveANest Street at the intersection of Katella
Avenue to facilitate traffic flow. South of this
intersection (approximately 600 feet south of the
intersection with Katella Avenue), the right-of-
way and roadway accommodates two lanes of
travel in each direction. Exhibit 4.4-3 (West
Street (South of Katella Avenue) Cross Section)
shows the current configuration of this portion of
West Street.
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
Exhibit 4.4-3 West Street (South of Katella
Avenue) Cross Section
5-foot sidewalk 5-foot sidewalk
8-foot parkway 8-foot parkway
2 travel lanes, 2 travel lanes
typical typical
13 ft I 32 ft i 32 ft I 13 ft
Right-of-way: 90 ft min
West Place is a cul-de-sac, located
immediately south of its intersection with Ball
Road and depicted in Exhibit 4.4f (West Place
Cross Section).
Exhibit 4.4-4 West Place Cross Section
10-foot parkway 10-foot parkway
4-foot parkway 4-foot parkway
Minimum one travel
0-20 foot lane each direction 0-20 foot
parkway I parkway
i I
14-34 ft I 52 ft 1 14-34 ft
Minimum right-of-way: 100-120 ft fright -of -way: 100-120 ft
1111t
Disney Way between Anaheim Boulevard and
Harbor Boulevard has two to three travel lanes in
each direction, except at Anaheim Boulevard
and Clementine Street where the street has been
widened to provide supplemental turning lanes.
Classified as a Primary Arterial, Disney Way
serves the traffic entering and leaving the east
portion of The Anaheim Resort and the public
parking facility located in the Parking Overlay and
the East Parking Area of The Disneyland Resort
Specific Plan. The portion of Disney Way west of
Clementine Street is described in The Disneyland
Resort Specific Plan. East of Clementine Street,
a landscaped median will ultimately be
constructed, as illustrated in Exhibit 4.4-6 (Disney
Way (East of Clementine Street) Cross Section).
4-8
4.0 Public Facilities Plan
Concurrent with the adoption of Amendment No.
17 (Disneyland Forward) to the Specific Plan, the
City adopted a General Plan Amendment which
reclassified Disney Way between Anaheim
Boulevard and Harbor Boulevard from a six -lane
Major Arterial to a four -lane Primary Arterial (with
no change to the width of the ultimate public
right-of-way). This allows Disney Way to be
reduced from three to two through travel lanes
between Anaheim Boulevard and Harbor
Boulevard.
As part of Disneyland Forward, the eastbound
travel lanes for Disney Way east of Clementine
Street will be modified to provide an exit
ramp/flyover from the public parking facility
located within the East Parking Area of the
Disneyland Resort Specific Plan Parking District.
With the approval of Disneyland Forward, the
following roadway improvements associated with
the East Parking Facility within the Disneyland
Resort Specific Plan will occur within the ARSP:
• Reconfiguration of Disney Way/Clementine
Street to accommodate the East Parking
Area parking facility exit ramp/flyover;
• Disney Way/Clementine Street intersection
improvements to accommodate the East
Parking Area parking facility exit ramp;
• Reconfiguration of the west side of
Manchester Avenue, north of Disney Way to
accommodate a Class I bicycle facility.
Exhibit 4.4-5 Disney Way (East of
Clementine Street) Cross Section
2 travel lanes Flyover ramp from
parking structure
8-foot parkway, 12 travel lanes
8-foot parkway
10-foot multi -use, Class Landscaped 5-foot sidewalk
I bicycle facility east of median I east of Clemenline
Clementine' + least
713 ft 35-39 ft 24 ft 35-39 ft 13 ft
Min- right-of-way: 120 ft
Improvements Note.- 3 travel lanes in each direction were completed prior to DisneylandForward (see
plans on file in the Public Works Department for the nghFOF-way dimensions along Disney Way which
may vary from the abom cross section). During DisneylandForwam, 2 travel lanes in each direction
are proposed. A Gass 1 bicycle facility will be added to the north side of Disney Way partially within the
existing dghtrof-way. An additionat 5-foo! easement hom Southern California Edison and Caltrans will
be needed to allow for the Class I bicycle facility. Final design of Disney Way is subject to the approval
of the City Engineer.
The Anaheim Resort Specific Plan 4.0 Public Facilities Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
Katella Avenue has three to four travel lanes
in each direction within The Anaheim Resort.
Eastbound and westbound Katella Avenue
include right -turn lanes and double left -turn lanes
at most intersections, as well as a raised
landscaped median, which separates opposing
traffic between signalized intersections.
Katella Avenue ultimately will be widened to four
lanes in each direction east of West
Street/Disneyland Drive, as shown in Exhibit 4.4-
6 (Ultimate Katella Avenue (Between Interstate 5
and West Street/Disneyland Drive) Cross
Section). These exhibits show the location of the
ultimate right-of-way as well as the interim
condition. Katella Avenue is currently four lanes
westbound from Manchester Avenue to 600 feet
west of Clementine Street. Katella Avenue
between Walnut Street and West
Street/Disneyland Drive will continue to have
three travel lanes in each direction, with a
minimum 15 foot wide landscaped median.
Exhibit 4.4-7 (Ultimate Katella Avenue (Between
Walnut Street and West Street/Disneyland Drive)
Cross Section), shows the ultimate of Katella
Avenue between West Street/Disneyland Drive
and Walnut Street.
4-9
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
Exhibit 4.4-6 Ultimate Katella Avenue (Between Interstate 5 and West
Street/Disneyland Drive) Cross Section
Ufinate rw-of-wm
"Ot lamed padmray
Bloat skkinmk
84od hwhcaped
i I -
1 4 Usael lanes
4.0 Public Facilities Plan
Utinate rift-0f-ray
84M 1-d—ped padnmy
8400t skkwMk
l.amismped 840d kndscWed
=dkn padaray
1 4 hwol hffm - I i * W
24 t 1 46 It 1 242E t I 46 R
Right-of-way Iscles R
24 R
Exhibit 4.4-7 Ultimate Katella Avenue (Between Walnut Street and West
Street(Disneyland Drive) Cross Section
8-foot landscaped parkway Landscaped median 8-foot landscaped parkway
8-foot sidewalk width varies: 8-foot sidewalk
26 ft at West St.!
SCE Corridor Disneyland Dr.; 8-foot landscaped
15 ft east of Walnut St. parkway
3 travel lanes 1 3 travel lanes
16
ft
35 ft
varies
35 ft
24 ft
i
Right-of-way: 125-136 ft
Improvements Note: Partially completed. Remaining 8-foot wide
landscape parkway improvement on the south side of Katells
Avenue will be ingtallled as new developments occur in the ARSP.
4-10
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
Walnut Street carries two lanes of traffic in
each direction between Katella Avenue and Ball
Road with a raised median. The portion of
Walnut Street south of Goodhue Avenue is
described in the Disneyland Report Specific Plan.
North of Goodhue Avenue, the cross section is
depicted in Exhibit 4.4-8 (Walnut Street (Between
Ball Road and Goodhue Avenue) Cross Section).
Consistent with the City's Bicycle Master Plan, a
Class I bicycle facility will be installed within
and/or adjacent to the existing ultimate right-of-
way on the east side of the street. These
improvements will be installed consistent with the
City standards, as determined by the City
Engineer.
Exhibit 4.4-8 Walnut Street (Between Ball
Road and Goodhue Avenue) Cross
Section
Setback and sidewalk/parkway
condition varies; to remain as -is
Landscaped 3-Toot parkway
median 10-foot multi -use,
2 travel I 2 travel Class I bicycle
lanes i lanes I facility
9ft1 24ft 15ft 24ft ft
Right-of-way: 85-87 ft
Improvement Note: A Class I bicycle facility will be added to the easq side of Walnut
Street within the exis?ing nghtof--way. Final design of Walnut Street is subject to the
approval of the City Engineer.
Harbor Boulevard. Within the ARSP area,
south of 1-5, Harbor Boulevard is a six -lane
divided road except at Manchester Avenue,
Disney Way, Katella Avenue, Convention Way,
Orangewood Avenue, and Chapman Avenue,
where it has been widened to accommodate
additional right- and left -turn lanes.
Exhibit 4.4-9 (Harbor Boulevard (Between
Chapman Avenue and Orangewood Avenue)
Cross Section) reflects the ultimate condition of
this section of Harbor Boulevard. A landscaped
4.0 Public Facilities Plan
median will ultimately be constructed. The cross
section in the exhibit below does not apply for the
portion of Harbor Boulevard located within the
City of Garden Grove, south of Wilken Way.
Exhibit 4.4-9 Harbor Boulevard (Between
Chapman Avenue and Orangewood
Avenue) Cross Section
8-Toot parkway Landscaped parkway
5-foot sidewalk I median 18-foot
5-foot sidewalk
Min. 3 travel l Min. 3 travel
lanes lanes
G24
13 ft 35-39 ft ft 35-39 ft 13 ft
Minimum right-of-way: 120 feet min
Median and travel lanes vary in width to a curb to curb width of 94
feet.
Exhibit 4.4-10 (Harbor Boulevard (Orangewood
Avenue to Manchester Avenue on the East Side
and Orangewood Avenue to 150-250 Feet South
of Manchester Avenue on the West Side) Cross
Section) shows the typical Harbor Boulevard
cross section which applies between
Orangewood Avenue and a point approximately
150-250 feet south of Manchester Avenue on the
west side and to Manchester Avenue on the east
side.
4-11
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
Exhibit 4.4-10 Harbor Boulevard
(Orangewood Avenue to Manchester
Avenue on the East Side and
Orangewood Avenue to 150-250 Feet
South of Manchester Avenue on the West
Side) Cross Section
&foot parkway
8-foot parkway
8-fo sidewalk
8-foot sidewalk
kwayot
6-foot parI
Landscaped
18 foot parkway
median
!I
Min. 3 travel Min. 3 travel
1
lanes lanes
2D-26 ft
24 ft
35-38 ft mm
m1n
35-38 ft min 24 ft
Ultimate Right-of-way: 150 ft
Improvements Nate: PadiaWy completed. Remaining &foot wide
landscpae parkway improvements wX be inslaeed as new devefapmerda
occurei the ARSP.
Exhibit 4.4-11 (Harbor Boulevard (Between
Manchester Avenue on the East Side and 150-
250 feet South of Manchester Avenue on the
West Side to the Interstate 5 Interchange) Cross
Section) applies to Harbor Boulevard between
Manchester Avenue on the East Side and 150-
250 feet south of Manchester Avenue on the
west side to the 1-5 interchange, the Harbor
Boulevard right-of-way. This portion of Harbor
Boulevard narrows to transition to the Harbor
Boulevard overpass, which is raised above 1-5.
Exhibit 4.4-11 Harbor Boulevard (Between
Manchester Avenue on the East Side and
150-250 feet South of Manchester Avenue
on the West Side to the Interstate 5
Interchange) Cross Section
II9400tperkwayl Lan
dscaped 9-fadpetkwayl
sidewalk7p Mnirnmt 3traM tames Niunttm 3trarA lanes
-,I-
6-9ft35ft"n 20tnat 35ftnit 69 ft
1I Nght-0Lway vanes 102-109 t mkiim nt III I
North of 1-5, Harbor Boulevard has a raised
median and six lanes of travel except at Ball
Road and 1-5 where it has been widened to
4.0 Public Facilities Plan
accommodate additional through, right- and left -
lanes. The parkway consists of a 9-foot sidewalk
with cutouts for tree wells.
Exhibit 4.4-12 Harbor Boulevard
(Interstate 5 to Vermont Avenue) Cross
Section
94od sidewalk 9toot sideasdt
land mpw
ITree wets tredwrt Tree
W Nidrmm 3 fraud tales hillin mnt 3 kwel lanes
9ft 41ft 1161ttm 41ft 9t
i t14nalle tbgltt-0f-my: 12a ft j
Ball Road is six lanes, except at West Street/
Disneyland Drive, Cast Place and Harbor
Boulevard, where it is wider to accommodate
additional through right- and left -turn lanes. Ball
Road has landscape medians, with the exception
of between West Place and Cast Place where it
has painted medians. Currently, the right-of-way
varies from 103 to 120 feet. The ultimate right-of-
way west of West Place will be 120 feet, and the
ultimate right-of-way between West Place and
Cast Place and east of Cast Place will continue
to be 106 feet as designated in the General Plan.
As part of a City -led update to the Circulation
Element of the General Plan in 2017, Class II
bicycle lanes were added to Ball Road, as
reflected in Exhibits 4.4-13 through 4.4-15.
Exhibit 4.4-13 Ball Road (With
Landscaped Median West of West Place)
Cross Section
Class II bicycle facility
6-foot parkway 3 travel lanes, typ. ri
foot parkway
Landscaped
4-foot sidewalk I med1, F Jian 4-foot sidewalk
i
ftRI 35fl I16ft 1 35fl I ftft
Ultimate night -of -way: 120 ft
Improvements Note: Prior to DisneylandFonvaM, all improvements were
completed, with the exception of the north side ofBafl Road. As part of Street
reconfiguration. a Class 11 bicycle lane will be added within the right-of-way.
Final design of Ball Road is subject to approval of the City Engineer.
4-12
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
Exhibit 4.4-14 Ball Road (Between West
Place and Cast Place) Cross Section
Painted
6-foot parkway median 6-foot parkway
4-foot sidewalk) I I
4-foot sidewalk
+II 3 travel 1 3 travel
lanes, typ. lanes, typ.
�� L 35ft 18ft 35ft ft
Ultimate right-of-way: 106 ft
'Within 600 feet east and west of Harbor Boulevard. this dimension is 9 feet
including 9-foot sidewalks with tree wells only.
Improvements Note: Prior to DisneylandForward, all improvements were
completed, with the exception of the north side of Ball Road. Final design of
Bell Road is subject to approval of the City Engineer.
Exhibit 4.4-15 Ball Road (East of Cast
Place) Cross Section
Raised
median"
Tree wells I ITlee wells
10-foot' sidewalk sidewalk
3 travel 3 travellanes,typ. lanes, typ.
lfit7?
35 ft 16 ft 35 ft fta
Ultimate right-of-way: 106 ft
Within 600 feet east and wes9 of Harbor Boulevard, this dimension is 9 teat
including 9-loot sidewalks with tree wells only.
"Median is landscaped east of Harbor Boulevard.
Improvements Note: Priw to oisneylandForward, all improvements were
completed, with Me exception of the north side of Ball Road. Final design of
Bali Road is subject to approval or the City Engineer.
Clementine Street serves two lanes of travel in
each direction and is 87 feet to accommodate a
landscaped median. Concurrent with the
adoption of Amendment No. 17
(Disneyland Forward) to the ARSP, the City
adopted a General Plan Amendment to remove
the planned future extension of Clementine
Street between Katella Avenue and Orangewood
Avenue in the south.
Prior to Disneyland Forward, the Disneyland
Resort Specific Plan contemplated transit
improvements within the median for the segment
of Clementine Street between Disney Way and
Katella Avenue. As transit improvements within
the median are not contemplated as part of
DisneylandForward, all improvements to this
street were completed prior to
4.0 Public Facilities Plan
Disneyland Forward. All street improvements to
this street were completed prior to Phase IV, with
the exception of potential future transit
improvements (i.e., bus or other improvements)
as approved by the City.
As part of Amendment No. 17
(Disneyland Forward) to the ARSP, improvements
to Clementine Street will include the replacement
of the existing sidewalk on the west side of
Clementine Street between Disney Way and Alro
Way with a multi -use Class I bicycle facility. The
adjacent property owner(s) will dedicate the
required property to the City to allow for the
minimum, adequate horizontal width for the multi-
use Class I bicycle facility. Improvements
associated with DisneylandForward may also
include a traffic signal at Arlo Way. The timing for
installation of these improvements is identified in
Mitigation Monitoring Plan No. 387, associated
with Disneyland Forward.
Exhibit 4.4-16 Clementine Street Cross
Section
4-foot sidewalk
4-foot sidewalk
Landscaped
8-foot parkway
Median
8-foot parkway
2 travel lanes
2 travel lanes
12ft
I 24ft
I 15ft I
24ft
I 12ft I
Right-of-way: 87 ft
Haster Street/Anaheim Boulevard includes
three travel lanes in each direction with a 16-foot
wide raised median north of Katella Avenue.
South of Katella Avenue, there are two travel
lanes in each direction with a 12-foot wide
painted median. At the street's intersection with
Katella Avenue, the street is wider to
accommodate turning lanes. The ultimate
condition for Haster Street, south of Katella
Avenue is six lanes with a 16-foot wide
landscaped median, consistent with its
4-13
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
designation as a Primary Arterial Highway in the
Circulation Element of the City's General Plan
and the current street configuration north of
Katella Avenue. Improvements to the west side
of Haster Street, south of Katella Avenue to the
southern boundary of the Disneyland Resort
Specific Plan were completed. The remaining
improvements on the east side of Haster Street
are in ARSP area and will be completed as new
development occurs. As part of
Disneyland Forward, improvements to Haster
Street may include a potential left -turn lane on
northbound Haster Street and a potential right -
turn lane on southbound Haster Street into and
out of the Southeast District of the Disneyland
Resort Specific Plan and a potential traffic signal.
The timing for installation of these improvements
is identified in Mitigation Monitoring Plan No.387.
At Gene Autry Way, Haster Street will also be
widened to accommodate additional turning
lanes. In addition, consistent with the City's
Bicycle Master Plan, a Class II bicycle facility will
be installed within the existing street right-of-way.
These improvements will be installed consistent
with the City standards, as determined by the
City Engineer.
Exhibit 4.4-17 Haster StreetJAnaheim
Boulevard Cross Section
6-foot parkway I Class II bicycle facility 6-foot parkway
4-foot sidewalk I Landscaped 4-foot sidewalk
median
3 travel 3 travel
lanes, typ. 1 lanes, typ.
11
ft ft 35ft 16ft 35ft ft ft
Ultimate right-of-way: 120 ft
Improvements Note: With the exception of partially completed travel
lanes on the east side of Haster, all improvements completed prior to
Disneylandforward.
Convention Way will continue to serve the
Anaheim Convention Center in its current right-
of-way width of 110 feet as depicted in Exhibit
4.4-20 (Convention Way Cross Section). An 18-
foot wide landscape median is provided except
where left -turn lanes reduce the median to 8 feet.
Three travel lanes are provided in each direction
4.0 Public Facilities Plan
and a 10-foot wide sidewalk area. The sidewalk
has 4-foot wide landscaped cutouts at the back
of the sidewalk.
Exhibit 4.4-18 Convention Way Cross
Section
4-fia1 plan" anas 4-roort penfbg areas
LmWscgmd
I10400tsidewak m lo-faotaidewalr
'IIY 3 (ravel tares 3 U%W tangy l
1011 3611 i } left ! Wa loft .t
ffl#*0F%W. 110 ft j
The western portion of Convention Way is
currently improved with the Anaheim Convention
Center Grand Plaza no typical cross section
exists at this time.
Gene Autry Way. Concurrent with the adoption
of Amendment No. 17 (Disneyland Forward) to
the ARSP, the City adopted a General Plan
Amendment to remove the planned future
extension of Gene Autry Way between Harbor
Boulevard and Haster Street as a primary arterial
roadway on the Circulation Element. As a result,
Gene Autry Way will not be constructed between
Harbor Boulevard and Haster Street.
Between Haster Street and 1-5, Gene Autry Way
transitions to the HOV interchange
accommodating vehicles from the HOV lanes on
1-5. This interchange is elevated and sound walls
have also been constructed in this location.
4-14
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
Exhibit 4.4-19 Gene Autry Way (East of
Haster Street) Cross Section
1.5 foot soundwall 1.5 foot soundwall
5-foot sidewalk Landscaped 5-foot sidewalk
median
�5-foot landscaped parkway 5-foot landscaped parkway I
3 travel lanes 3 travel lanes IIW
loft 35it 1611 35ft 10ft
Right-of-way: 108 ft .�
Manchester Avenue is divided into three
parts: West Manchester Avenue (extends in an
east -west direction from Harbor Boulevard);
North Manchester Avenue (extends in a
southeastern direction from West Manchester
Avenue adjacent to 1-5 to Clementine Street);
and, Manchester Avenue, south of Katella
(extends in a southeastern direction adjacent to I-
5, east of Disney Way to the southern boundary
of The Anaheim Resort.
West Manchester Avenue will retain its current
right-of-way and parkway/sidewalk configuration,
as depicted in Exhibit 4.4-22 (Manchester
Avenue Cross Section)
Exhibit 4.4-20 West Manchester Avenue
Cross Section
5-faot adewak 5 fad adown
Landscaped
kw 8.5-krd paray meldian 8.5-fad pwicws
2travel lanes W 2travellanes
13.52 I 24111 - 1 15ft 24ft 13.5ft
I laght-of-way: 90 a j
North Manchester Avenue is the portion of
Manchester Avenue located adjacent to 1-5 that
was relocated as part of the widening of the
freeway and improvements for the interchange at
Katella Avenue and 1-5. The ultimate
configuration for this portion of Manchester
4.0 Public Facilities Plan
Avenue, which occurs adjacent to 1-5, is depicted
in Exhibit 4.4-21 (North Manchester Avenue
(Adjacent to Interstate 5, North of the Parking
Overlay) Cross Section). As part of
Disneyland Forward, a transportation facility may
be located within the P Overlay adjacent to North
Manchester Avenue. To enhance access to the
transportation facility, North Manchester Avenue
would be widened up to five lanes in front of the
transportation facility to provide a two-way left
turn lane, and may include a landscaped median,
as shown in Exhibit 4.4-22 (North Manchester
Avenue (Adjacent to Interstate 5 and the Parking
Overlay North of Arlo Way) Cross Section).
In addition, consistent with the City's Bicycle
Master Plan, a Class I bicycle facility will be
installed partially within the existing street right-
of-way. As part of Disneyland Forward, an
additional 4 feet was added to the existing street
right-of-way to accommodate the Class I bicycle
facility on the west side of Manchester Avenue
from the proposed Bus Shuttle Drop -Off Area to
the East Parking Area of The Disneyland Resort
Specific Plan. These improvements will be
installed consistent with the City standards, as
determined by the City Engineer.
Exhibit 4.4-21 North Manchester Avenue
(Adjacent to Interstate 5, North of the
Parking Overlay) Cross Section
8-foot parkway 5-foot parkway
4-foot sidewalkl
ill 2 travel 2 travel
lanes lanes
12it 25ft 25ft 5
ft
Right-of-way: 67 ft
Improvement Note: Final design of MancheaTerAvenue is subject to approval of the City Engineer.
4-15
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
Exhibit 4.4-22 North Manchester Avenue
(Adjacent to Interstate 5 and the Parking
Overlay, North of Alro Way) Cross Section
8-foot parkway Varies from 20-foot to 30-foot 12-foot parkway
10-foot multi -use, landscaped median
Class I bicycle facility 2 travel I 2 travel
lanes + lanes
ft2D ft 22 ft 24 ft ft
Right-of-way: 96 ft
Improvements Note: As part of Phase IV, a muN-use Class I bicycle facility will be
added to the west side of North ManchesterAvenue within the right-of-way The
adjacent property owner(s) will dedicate the required property to the City to allow
for the minimum, adequate horizontal width for the multi -use Class I bicycle facility.
A precise alignment was approved for this section.
Manchester Avenue, south of Katella Avenue
(Adjacent to Interstate 5, east of Disney Way)
became a one-way (traveling south) frontage
road adjacent to 1-5 as part of the widening of 1-5.
There are three lanes of travel as depicted in
Exhibit 4.4-23 (Manchester Avenue, East of
Anaheim Boulevard (Adjacent to Interstate 5)
Cross Section.
Exhibit 4.4-23 Manchester Avenue, East of
Anaheim Boulevard (Adjacent to
Interstate 5) Cross Section
4-foot sidewalk 5-foot parkway
64cwt. parkway
Minimum 3 travel lanes
(n one direction)
10 ft I Minimum 37 ft 61
Right-of-way_ Minimum 521t
I
Orangewood Avenue is designated as
Secondary Arterial with four travel lanes except
at Harbor Boulevard where Orangewood Avenue
will be widened to accommodate additional left -
and right -turn lanes.
4.0 Public Facilities Plan
Exhibit 4.4-24 Orangewood Avenue Cross
Section
5-fwt sidewalk 54aat sidedvalk
y 5-ioot aa�r�
Travel lanes vary w
loft I 35ft I 35ft 10ft
1 Riight-0f�.90ft 1_
Chapman Avenue is a Primary Arterial with six
travel lanes and a landscaped median. At
Harbor Boulevard, Chapman Avenue will be
widened to accommodate additional left- and
right -turn lanes.
Exhibit 4.4-25 Chapman Avenue Cross
Section
4-1nart WK11-aped 4-hXd S dewak
medlim
I � Ply
1&f0&PWft" 3 travel Isnea, iypiral �Ir 3 travel Yrtes. iypfical �IV
loft MR 16ft 351t "an
UIllnste RVd-&-way: 106 ft I
Alro Way has two travel lanes, a 4-foot wide
sidewalk and a 6-foot wide parkway within its 60-
foot right-of-way and is designated as a Local
Street, as depicted below.
Exhibit 4.4-26 Alro Way Cross Section
6-foot parkway
4-foot sidewalk I 1 travel 10-foot parkway
I lane each
iii direction
10
R
Right -of --way. 60 ft
4-16
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
Casa Vista Street has one travel lane in each
direction and a 4-foot wide sidewalk with a 6-foot
wide parkway within its 60-foot wide right-of-way
and is designated as a Local Street, as depicted
below.
Exhibit 4.4-27 Casa Vista Street Cross
Section
4-foot sidewalk 4-foot sidewalk
Y� 6-foot parkway 6-� Yr parkway
1 travel lane each direction
loft 40ft loft
J Rightof�xraY so ft
Vermont Avenue has one travel land in each
direction and 9-foot wide sidewalks with 5-foot
wide tree wells within its 66-foot wide right-of-way
and is designated as a Local Street. The exhibit
below shows the Vermont Avenue cross section
condition.
Exhibit 4.4-28 Vermont Avenue Cross
Section
9-foot sidewalk 9400t sidewalk
well 5400t
�5-foot treetravel lane each d iecUo� wetil
9ft 48ft 9ft
Right=of-vray: 66 ft
Wilken Way has one travel lane in each
direction, 4-foot wide sidewalks and 6-foot wide
parkways within a 60-foot wide right-of-way and
is designated as a Local Street. The exhibit
below shows the Wilken Way cross section
condition.
4.0 Public Facilities Plan
Exhibit 4.4-29 Wilken Way Cross Section
4-foot sidewalk 4-foot sidewalk
I 64bot parkway
6-foot parkway
1 travel lane each direction W
loft 401t loft
Right way. 60 It
r
Zeyn Street has one travel lane in each
direction, 4-foot wide sidewalks and 6-foot wide
parkways within a 60-foot wide right -of way and
is designated as a Local Street. The exhibit
below shows the Zeyn Street cross section
condition.
Exhibit 4.4-30 Zeyn Street Cross Section
4-foot sidewalk 4-foot sidewalk
I
6-foot parkway 6-foot parkway
1 travel lane each direction
loft 40ft loft
Right-0f way 60 ft
4-17
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
4.5 Transit Plans
To minimize automobile traffic on local streets,
existing and proposed transit systems will service
uses within the ARSP area. The main component
of the existing system is the Orange County
Transit Authority (OCTA) bus service to the
ARSP area. Current bus routes are located on
Harbor Boulevard, Katella Avenue and Ball
Road, and provide regular service to The
Anaheim Resort.
4.5.1 The Disneyland Resort
The Disneyland Resort Specific Plan transports
theme park visitors to the theme parks from
public day -use parking facilities via pedestrian
walkways, buses, tram services and monorail.
These existing services could be expanded in the
future to provide additional transit improvements.
4.5.2 East-West Transit Connection
An East-West Transit Connection is
contemplated to connect The Anaheim Resort
and the Anaheim Regional Transportation
Intermodal Center (ARTIC).
4.5.3 HOV Lane System
OCTA and Caltrans have developed a plan to
construct a countywide system of transit ways
and commuter HOV lanes in freeway corridors.
These facilities will be used by regional 'express'
buses, regular intercity buses, shuttle buses,
vanpools, and carpools. Buses and other HOVs
would access or egress these facilities at
exclusive HOV ramps to streets or at designated
at -grade merge locations along freeways.
HOV lanes have been constructed on 1-5, State
Route (SR) 57, and SR 22, with a direct HOV
connection between SR-57 and 1-5. The HOV
interchange at Gene Autry Way allows access to
and from areas east and west of 1-5, including
The Anaheim Resort and Angel Stadium of
Anaheim. As part of a long-term project,
4.0 Public Facilities Plan
exclusive HOV ramps have been identified at
Cerritos Avenue on the SR-57.
4.5.4 Bus Service
OCTA and Anaheim Transportation
Network/Anaheim Regional Transportation
provide bus service to and within The Anaheim
Resort.
4.5.5 Intercity Commuter Rail Service
Amtrak and Metrolink provide train service to The
Anaheim Resort via stations in Fullerton and
Anaheim.
4-18
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
4.6 Pedestrian Circulation Plans
An increase in the number of hotel rooms and the
development of new attractions will increase
pedestrian activity in The Anaheim Resort. This
will enhance the urban character of the area and
will require that facilities be enhanced to meet the
needs of these pedestrians.
Exhibit 4.6-1 (Proposed Pedestrian Circulation)
illustrates the pedestrian circulation system within
the ARSP area and the surrounding areas. On
this plan, public pedestrian routes have been
identified. The primary destinations of
pedestrians within The Anaheim Resort will
include:
• Hotels, restaurants and other businesses in
The Anaheim Resort;
• The Anaheim Convention Center;
• The existing Disneyland theme park, Disney's
California Adventure theme park, as
described in The Disneyland Resort Specific
Plan and in the Theme Park (TP) East and
West Overlays of the ARSP area; and
• The East and West Parking Areas of The
Disneyland Resort Specific Plan Parking
District.
Exhibit 4.6-2 (Pedestrian and Vehicular Access
Points) depicts the pedestrian and vehicular
access points, associated with
Disneyland Forward, within the ARSP Theme
Park East and Parking Overlays. This exhibit
also describes the locations of existing and
potential bridges. Areas where pedestrian
bridges may be installed serve as a key
connector over public street rights -of -way,
connecting users from one side of the street to
the other without having to impede traffic flow.
Pedestrian bridges were constructed over
Disneyland Drive and Magic Way in the DRSP.
Up to two additional pedestrian bridges or
4.0 Public Facilities Plan
crossings will be constructed over Disneyland
Drive as part of Disneyland Forward. At least one
and up to three pedestrian bridges will be
constructed over Harbor Boulevard, at least one
of which will be constructed in conjunction with
construction of a parking facility within the
Parking Overlay and/or the DRSP East Parking
Area. Exhibit 4.6-2 (Pedestrian and Vehicular
Access Points) also describes the potential future
pedestrian bridge over Katella Avenue
connecting the DRSP Theme Park District to the
PR District. Any pedestrian bridges constructed
over public right-of-way will be required to obtain
an encroachment license from the City.
4-19
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
Exhibit 4.6-1 1 Proposed Pedestrian Circulation
vnrinLlt'i pve
City ou
Anaheim
Ball Rd'
7i
om,
4.0 Public Facilities Plan
Oisrreyifznd
l Q
theme Part y t
- - t
Y'errlrs Ave - 0�•- �
.Cerritos Ave-
� a `
City of c 7. ,AB enfuie
Anaheim L '' TCAhemeP,aik %
_1_
Katella Ave
-
Center
I 1
CNY BOUNDARY
r — — — — — Orangewood _Ave
I City of
J Garden Grove
1
Clry 80111DARY,
i
NOTES:
1. Sidewalks are provided far oil public sheets unless shown on
this e>fh)bh. Public sidewafks loaafed outside oT the bounaanes
I
I
City of
of The aheim sh Resort are not own on this eMlbff.
AnMown
2. Unlit parking shure uctis conshre ucfetl In the East Parking Aa,
_fOng pUbflc sidewalk to remain on the north side of Disney
Way, west of Cfenentine Sheet.
r
Orange
- — Chapman Ave
—
— — —
Proposed Pedestrian Circulation
LEGEND MAP FEATURES
r• —, The Anahiem Public Pedestrian Route
Resort Boundary
The Anaheim Resort
�— Specific Plan Boundary
C J City Boundary
It I
Notre/Sources
City Legal Lot Data, 2022
City Boundcry Data, 2022
0 750 I,soo
Feet
4-20
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
Exhibit 4.6-2 1 Pedestrian and Vehicular Access Points
4.0 Public Facilities Plan
-.44"41"t. me I
Citj Of
+�{' 1 Anaheim
BallRd ' �t �} Ball'Rd'
��
I� %
r a,
Dis"neylund�`
711eme� Park. ,
I I—tNdgig]p-afy- L
%
-Ce4itos Ave
I °
�cP�. Cemfps Ave_
f r__-P
City of
■ CA AdvehNrre
Anaheim y� L — I Theme Palk - a %
1
- —7 �r -
Katella Ave �^.s� �� " �I i J ` ^- .1
r—�I 1=,r ICafellaA,v_e_-_
coc.Anaheim n�
I �
CITY BO,UNOARY_I
r — 1 FT- Orangewood'Ave
.- J II
I
it
F W _
_ CITY,BOUNDARY'
NOTES:
1. P H.r bor Locations. between a Bridges:
• Harbo fb k rtl, between Manchester Avenue and Disney Way.
• Dmeyland 0,Ne, between Magic Way and Ktebb Avenue. City Ot • Katelte Avenue connecting the Anaheim Convention Center area to I
_ l I r
what h now Disney CONtomure ia Adventtheme park •
2. As at November 2021, there is bus/shuttle access, however. such Orange
access m ybe removed ilahonsib center is movetltoth DRSP I— 1 —
PaMng East
OBMct t Parking Area or the adjacent ARSP Parking Overlay. I 3. The location of occess points maybe adjusted subject to Me approval
of the City Engineer. Chapman Ave L— — •�
Pedestrian Circulation Plan
LEGEND MAP FEATURES Notes/sources
City legal Lot Data, 2D22
�-j The Anaheim Resort Pedestrian and Vehicular Access Point in the City Boundary Data, 2022
Boundary Parking Overlay or Theme Park East Overlay
The Anaheim Resort
Specific Plan Boundary
J City Boundary
0 750 1,500 .{
Feet [�
MARCH 2O24
4-21
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
4.7 Water
The City of Anaheim Public Utilities Department
provides water to the ARSP area. Its sources
include both wells to tap groundwater resources,
and water purchased from the Metropolitan
Water District. Based on preliminary estimates,
the average additional daily water consumption
for The Anaheim Resort will be about 7 million
gallons (including The Disneyland Resort).
The existing water supply system consists of
numerous water lines that surround or traverse
the ARSP area. Modification of this system is
necessary to provide water at the pressures and
in the quantities needed to supply the ARSP
area. The following is a list of the improvements
that have been made to the water distribution
system to support implementation of the ARSP.
• Replacement of the 8-inch pipe in Clementine
Street from Katella Avenue to Disney Way
with a 20-inch pipe;
• Replacement of the existing 10-inch pipe in
Disney Way from Clementine Street to
Harbor Boulevard with a 20-inch pipe;
• Installation of a new well (Well 55) near the
intersection of Clementine Street and Disney
Way;
• Replacement of the existing 10-inch pipe in
Harbor Boulevard from Convention Way to
Disney Way with a 20-inch pipe;
• Replacement of the existing 10-inch pipe in
Harbor Boulevard from Disney Way to Harbor
Boulevard north of Manchester Avenue with a
16-inch pipe;
• Replacement of the existing 12-inch pipe in
Katella Avenue from Harbor Boulevard to
Clementine Street with a 20-inch pipe; and,
• Replacement of the existing 12-inch and 14-
inch pipes in West Street/Disneyland Drive
4.0 Public Facilities Plan
from Ball Road to Katella Avenue with a 20-
inch pipe.
The following additional improvements to the
water distribution system will be made as part of
the on -going implementation of the ARSP.
• Installation of a 16-inch pipe in Harbor
Boulevard from Orangewood Avenue to
Chapman Avenue; and,
• Provision for a new well to be constructed
near the intersection of Haster Street and
Orangewood Avenue.
Additional information about water use, supply
and improvements is provided in SEIR No. 340. If
any analyses or conditions above demonstrate
that improvements are necessary, those
improvements would be regulated by Anaheim's
Water Rates, Rules and Regulations, Water
Services Administrative Procedures and Design
Guidelines (APDG), and Water Services
Standard Specifications (WSSS). The cost of all
Main Extensions, Main Enlargements,
abandonments, relocations, and easements
documents are the responsibility of the owner or
developer of the properties served by these
mains in accordance with Rule 15A.
Water conservation is an important part of the
Plan and will be achieved through numerous
measures intended to reduce water consumption.
Among the measures to be implemented within
the ARSP area to the extent applicable, include,
but are not limited to, the following:
• Low -flow sprinkler heads in irrigation
systems;
• Waterway recirculation systems;
• Low -flow fittings, fixtures, and equipment,
including low flush toilets and urinals;
• Efficient irrigation systems such as drip
irrigation, low flow irrigation heads, automatic
4-22
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
irrigation scheduling equipment, flow sensing
controls, rain sensors, soil moisture sensors
and other water conserving equipment;
• Low -flow shower heads in hotels;
• Water efficient ice -machines, dishwashers,
clothes washers and other water -using
appliances;
• Irrigation systems used primarily at night
when evaporation rates are lowest;
• Provision of information to the public in
conspicuous places regarding water
conservation;
• Water conserving landscape plant materials;
wherever feasible; and,
• Construction of separate irrigation lines and
implementation of recycled water when it
becomes available.
In addition to these measures, development in
the ARSP area will comply with Chapter 10.18
(Water Conservation and Water Shortage
Contingency Rules and Regulations) and chapter
10.19 (Landscape Water Efficiency Ordinance) of
Title 10 Anaheim Municipal Code, and Guidelines
for Implementation of the City of Anaheim
Landscape Water Efficiency Ordinance.
4.0 Public Facilities Plan
4-23
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
4.8 Sanitary Sewer
The ARSP area is served by local sewer lines
owned and maintained by the City of Anaheim.
Wastewater in the local sewer lines generally
flows south and then west to the Orange County
Sanitation District (OCSAN) sewer trunks.
Wastewater from the ARSP area is conveyed
through City and OCSAN sewer trunks and
interceptors to the OCSAN Treatment Plant No. 1
in Fountain Valley.
The Central Anaheim Master Plan of Sanitary
Sewers (adopted by Anaheim City Council on
January 9, 2018, by Resolution No. 2018-001)
analyzed sewer system capacity in the ARSP
area. This plan identified the new regional sewer
lines to be constructed specifically for continued
buildout development within the ARSP area. As
specific projects with detailed information on
precise location, project statistics, and precise
sewer loading become available, sewer studies
may be required to determine if additional local
improvements are required.
4.0 Public Facilities Plan
4-24
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
4.9 Storm Drain
Storm water from the northern portion of the
ARSP area will flow west in new or existing
underground storm drains to the Anaheim -Barber
Channel, located several hundred feet west of,
and parallel to Walnut Street as identified in the
Master Plan of Storm Drainage for Anaheim
Barber City Channel Tributary Area June 2009
(adopted by Anaheim City Council on October
27, 2009 by Resolution No. 2009-163). Storm
water from the southern portion of the ARSP
area will flow south to the East Garden Grove-
Wintersburg Channel as identified in the Master
Plan of Storm Drainage for East Garden Grove
Wintersburg Channel Tributary Area January
2006 (adopted by Anaheim City Council on
March 7, 2006 by Resolution No. 2006-029).
Eventually, the storm water from the entire ARSP
area empties into the ocean at Huntington
Harbor.
The following is a list of the planned facilities to
be constructed to handle the storm water flows
from the ARSP area:
• A relief drain in Harbor Boulevard, Vermont
Avenue and East Street;
• An upgrade drain in Ball Road;
• A parallel or relief drain in Cerritos Avenue,
Walnut Street and Magic Way;
• An upgrade or parallel storm drain in Katella
Avenue and an upgrade drain and new storm
drain line north of it in Anaheim Boulevard;
• An upgrade drain in Manchester Avenue;
• New storm drain lines in Guinida Lane, Palm
Street and Winston Road;
• A parallel or upgrade drain in Orangewood
Avenue, Harbor Boulevard and Wilken Way;
• A relief drain in Haster Street and Gene Autry
Way.
4.0 Public Facilities Plan
• A parallel or upgrade drain in Hotel Way
All new development and/or redevelopment
projects shall participate in the City's Master Plan
of Drainage and related Infrastructure
Improvement (Fee) Programs to assist in
mitigating storm drainage system deficiencies as
described in SEIR No. 340.
With approval of Disneyland Forward, the
following additional storm drain improvements
will be required:
• With development of the Southeast
District of The Disneyland Resort Specific
Plan and the Theme Park East Overlay,
connections to the existing storm drains in
surrounding streets would be required;
and,
• Disney will continue to comply with the
Master Water Quality Management Plan,
which applies to all Disney Properties in
The Anaheim Resort.
25
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
4.10 Electricity
Electricity for the ARSP area is provided by the
City of Anaheim Public Utilities Department.
Electric utilities are installed underground in
accordance with City Electrical Construction
Standards, the Electric Rates, Rules and
Regulations, and the Development Standards
and Guidelines for The Anaheim Resort. Full
implementation of the ARSP will increase the
demand for electricity by approximately 291.7
million kilowatt hours annually and an estimated
799,344 kilowatt hours on an average day. The
estimated net increase in electrical demand
associated with implementation of the ARSP
area is 110.5 million volt amperes. The load
could be higher if theme park uses are moved
from the DRSP Theme Park District to the ARSP
Theme Park East and West Overlays.
As part of an existing City of Anaheim Capital
Improvement Program, the existing overhead
electric utilities on Katella Avenue, West Street/
Disneyland Drive, and Harbor Boulevard were
placed underground. The undergrounding was
completed prior to or at the same time that the
area street improvements were completed. New
lines constructed to serve the area will also be
placed underground.
A new substation facility was constructed at the
northeast corner of Katella Avenue and Zeyn
Street in November 2019.
In order to conserve energy, the owner or
developer shall implement energy saving
practices which may include the following:
• High -efficiency air-conditioning with EMS
(computer) control;
Variable air volume (VAV) distribution
• Outside air (100%) economizer cycle;
4.0 Public Facilities Plan
• Staged compressors or variable speed drives
to flow varying thermal loads;
• Isolated HVAC zone control by
floors/separable activity areas;
• Specification of premium -efficiency electric
motors (i.e., compressor motors, air -handling
units, and fan -coil units);
• Use of occupancy sensors in appropriate
spaces;
• Use of compact fluorescent lamps;
• Use of cold cathode fluorescent lamps;
• Use of light emitting diode (LED) or
equivalent energy -efficient lighting for outdoor
lighting;
• Use of Energy Star@ exit lighting or exit
signage;
• Use of T-8 lamps and electronic ballasts
where applications of standard fluorescent
fixtures are identified;
• Use of lighting power controllers in
association with metal -halide or high-
pressure sodium (high intensity discharge)
lamps for outdoor lighting and parking lots;
• Consideration of thermal energy storage air-
conditioning for spaces or facilities that may
require air-conditioning during summer, day -
peak periods;
• For swimming pools and spas, incorporate
solar heating, automatic covers, and efficient
pumps and motors, as feasible; and,
• Participation in energy efficiency incentive
programs.
The Public Utilities Department will coordinate
with property owners and developers to
incorporate feasible renewable energy
generation measures, including but not be limited
to the use of solar and small wind turbine
4-26
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
sources on new and existing facilities and the
use of solar powered lighting in parking areas. In
addition, new building construction will be
required to exceed Title 24 Energy Efficiency
Standards for Residential and Nonresidential
Buildings at the time of building permit
application by at least 10 percent.
4.11 Natural Gas
Natural gas for the ARSP area will be delivered
by Southern California Gas Company, which
maintains both standard and high pressure gas
lines in the vicinity of the ARSP area. Wherever
practical, development within the ARSP area will
be required to incorporate energy -saving means
into the project to reduce consumption of natural
gas. In addition, many of the energy conservation
measures described in Section 4.10 above will
also result in natural gas savings.
4.12 Telephone Services
AT&T provides telephone, digital cable, and high-
speed internet services to the ARSP area.
Existing facilities are located in the developed
areas surrounding the ARSP area. The
infrastructure capacity for telephone service
typically expands with new development.
4.13 Television/Cable Service
Time Warner Cable currently provides both fiber
and coaxial feeds in the ARSP area for a variety
of services including, but not limited to, standard
and high definition cable television service, PRI
T1 telephony circuit(s), cable television service,
high speed internet, and digital telephone
service.
4.0 Public Facilities Plan
4.14 Solid Waste
Solid waste from the ARSP area will be collected
by a City contracted disposal company. Collected
waste is processed through Republic Waste
Services of Southern California LLC's Regional
Material Resource Recovery Facility (MRF). The
facility contains an 800-foot-long automated and
manual sorter/conveyor system that separates
more than 70 types of recyclables. Remaining
non -recyclable waste is processed and
consolidated before delivery to the Brea-Olinda
Alpha landfill in unincorporated Orange County
adjacent to the City of Brea. In addition to the
processing of collected waste at the MRF for
recyclable materials, one or more solid waste
reduction programs may be required of new
development, including but not limited to:
• Facilitating recycling by providing chutes or
convenient locations for sorting and recycling
bins;
• Facilitating cardboard recycling (especially in
retail areas) by providing adequate space
and centralized locations for collection and
storing;
• Facilitating glass recycling (especially from
restaurants) by providing adequate space for
sorting and storing;
• Providing trash compactors for non -
recyclable materials whenever feasible to
reduce the total volume of solid waste and
the number of trips required for collection;
• Prohibiting curbside pick-up; and,
• Providing the following on -going practices
during project operations as feasible:
o Use of recycled paper products for
stationery, letterhead, and packaging;
o Recovery of materials such as aluminum
and cardboard;
o Collection of office paper for recycling;
4-27
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
o Collection of polystyrene (foam) cups for
recycling; and
o Collection of glass, plastics, kitchen
grease, laser printer toner cartridges, oil,
batteries, and scrap metal for recycling or
recovery.
Property owners that develop in accordance with
the ARSP will be required to implement a Waste
Management Plan that includes, but is not limited
to:
• Detailing the location and design of on -site
recycling facilities;
• Providing on -site recycling receptacles to
encourage recycling;
• Complying with all Federal, State, County,
and City regulations for hazardous material
disposal; and,
• Participating in the City's "Recycle Anaheim"
program or any additional substitute
programs as developed by the City.
4.15 Public Services
The City Fire Department, in conjunction with the
Utilities Department has set the minimum
standards for water flow for the ARSP area. In
addition, they will review all future development
for compliance with City Fire Department
standards. Typical requirements include the
installation of sprinklers in accordance with the
Anaheim Municipal Code, preparation of
emergency fire access and construction fire
protection plans, provision of adequate access to
structures for fire fighting vehicles and location of
fire hydrants in conveniently accessible locations.
Since continued development in the ARSP area
will increase the number of service calls to the
Fire Department, new development shall be
required to participate in fair share funding of the
4.0 Public Facilities Plan
following measures intended to improve fire
protection:
• One additional fire truck company;
• One additional paramedic company;
• Modifications to existing fire stations to
accommodate the additional fire units,
additional manpower, equipment and
facilities;
• A vehicle equipped with specialty tools and
equipment to enable the Fire Department to
provide heavy search and rescue response
capability; and,
• A medical triage vehicle/trailer, equipped with
sufficient trauma dressings, medical supplies,
stretchers, etc., to handle 1,000 injured
persons, and an appropriate storage facility.
The Anaheim Fire Department will provide the
following list of services:
• Development Project Meetings;
• Preconstruction Plan Review;
• Preplanning for firefighting and
evacuations;
• All new construction inspections;
• All state mandated CUPA inspections;
• All state mandated and non -state
mandated annual fire inspections;
• Review and inspections of all special
event permits;
• Monitoring of pyrotechnics and special
effects; and,
• Interconnected Safety System (ISS)
Testing.
4-28
The Anaheim Resort Specific Plan 4.0 Public Facilities Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
The Anaheim Police Department provides law
enforcement services to the ARSP area. The
Police Department is divided into four service
districts (Central [Main], South, East, and West)
each containing a police station. The ARSP is
located within the Central District and is seared
by the Central Station.
Law enforcement services to be provided by the
Police Department include traffic control and
enforcement, narcotics violations, crime control,
community and tourist regulation, detention
facilities, various investigations, and patrol. The
additional police service personnel needed for
the development of The Anaheim Resort will be
funded through annual tax proceeds and
incremental growth in and around The Anaheim
Resort
4-29
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
This page is intentionally blank.
4.0 Public Facilities Plan
4-30
The Anaheim Resort Specific Plan 5.0 Design Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
5.0 DESIGN PLAN
The Design Plan contains descriptions of the
basic concepts that will help achieve the ARSP's
fundamental goal of creating a unified resort
identity for the ARSP area. Written text in this
Section describes the fundamental design
concepts, while the drawings that accompany the
text show how the concepts will be implemented.
The Design Plan has been coordinated with
several adopted documents that describe design
concepts for the ARSP area. These documents
include The Disneyland Resort Specific Plan,
The Anaheim Resort Public Realm Landscape
Program, and The Anaheim Resort Identity
Program. In addition, this Section is intended to
supplement the Zoning and Development
Standards contained in Section 7.0, which is
codified as Chapter 18.118 of the Anaheim
Municipal Code.
Since the public streets are the interface between
the ARSP and The Disneyland Resort Specific
Plan, both specific plans describe in detail the
design of the public streets, as well as the
treatment of setback areas adjacent to public
streets. The emphasis in both plans is on
creating unity through landscape design, a
standardized design vocabulary for streetscape
elements (such as light poles and directional
signs), and regulation of private property,
including standards for signs, building heights,
and setbacks.
For ease of reference and to better depict the
relationship between the two specific plans, the
ARSP contains information about the treatment
of all public streets that border or are within the
ARSP area boundaries. As a result, there is an
overlap in the information contained in both
specific plans along the border between the two
areas. For example, the description and
5-1
illustrations of the design concept for Harbor
Boulevard appear in both specific plans.
On September 20, 1994, the City Council
adopted Resolution No. 94R-239 approving The
Anaheim Resort Public Realm Landscape
Program. Subsequent amendments have been
adopted as described in the Program document
on file in the City of Anaheim Planning and
Building Department. The Anaheim Resort Public
Realm Landscape Program summarizes
landscape concepts proposed for the public
streets within The Anaheim Resort and provides
a general overview of the different landscape
treatments that will help create a unifying resort
identity.
The ARSP is also consistent with The Anaheim
Resort Identity Program approved by the City
Council by adoption of Resolution No. 94R-238.
Subsequent amendments have been adopted as
described in the Program document on file in the
City of Anaheim Planning and Building
Department. The Anaheim Resort Identity
Program contains specific recommendations for
the location and design of gateways, directional
signs, banners, light fixtures, street furniture, and
potential pedestrian bridges or crossings for The
Anaheim Resort. Section 5.5, Identity Concept
Plan, of the ARSP summarizes how signs and
other identity elements will help create the unified
environment envisioned for the entire Anaheim
Resort area.
The information in this Section supplements the
Zoning and Development Standards contained in
Section 7.0 in the following ways. First, it
describes the fundamental design ideas and
concepts that are the basis for the standards and
regulations. This description of the basic
concepts will assist in the interpretation of the
intent of the ARSP in situations where several
options may be consistent with the regulations.
Also, it contains design guidelines that would be
The Anaheim Resort Specific Plan 5.0 Design Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
considered too general to be standards or
regulations but convey useful information about
the character and quality of development
anticipated within the ARSP area. Finally, this
Section contains sketches, cross -sections and
photos that show what the physical appearance
of important conditions in the ARSP area should
be if the standards, regulations, and guidelines
are implemented in accordance with this section
and Section 7.0. By showing how the two work
together, the intent of the ARSP can be
conveyed in a more comprehensive manner.
In addition to this introduction, this Section is
divided into eight parts, including:
• 5.1 Design Plan Objectives;
• 5.2 Design Concepts;
• 5.3 Landscape Concept Plan;
• 5.4 Landscape Cross Sections;
• 5.5 Identity Concept Plan;
• 5.6 Design Criteria for the Public Realm;
• 5.7 Design Criteria for the Setback Realm;
and,
• 5.8 Design Criteria for the Private Realm.
5.1 Design Plan Objectives
The Design Plan is intended to achieve three
principal design objectives. They are:
• Create visual continuity between the ARSP
area and the adjacent Disneyland Resort
Specific Plan area;
• Create a high quality, visually appealing,
pedestrian -oriented environment;
• Create landscape and design standards and
regulations to reinforce the area's identity;
and,
5-2
• Enhance Public Views of the Theme Parks,
including Back -of -House Uses, From Public
Walkways and Streets.
The following are descriptions of each of these
objectives.
5.1.1 Create Visual Continuity between
the ARSP Area and the Adjacent
Disneyland Resort Specific Plan Area
An important objective of the ARSP is to visually
tie the ARSP area to the adjacent Disneyland
Resort Specific Plan area through the consistent
use of landscape and other streetscape elements
including signs, gateways, lights and other
elements. The Anaheim Resort will then have a
more unified identity, and there will be a smooth
transition from the ARSP area and The Dis-
neyland Resort Specific Plan Area.
5.1.2 Create a High Quality, Visually
Appealing, Pedestrian -Oriented
Environment
A second design objective is to create a high
quality pedestrian environment that reinforces the
urban character of the ARSP area. With the
development of Disney's California Adventure
theme park and new theme park attractions
within the ARSP area, construction of the new
public parking facilities in The Disneyland Resort,
and the increase in the number of visitor
accommodations both within The Disneyland
Resort Specific Plan and the ARSP, there will be
a measurable increase in the number of
pedestrians in the area. Anticipated improvement
and expansion of the Anaheim Convention
Center will also contribute significantly to the
increase in pedestrians. This will help support an
active street environment for shopping, dining
and lodging within walking distance from the
theme parks and the Anaheim Convention
Center. The Design Plan addresses the needs of
pedestrians by:
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
• Establishing the size and location of
pedestrian walks;
• Defining the type of landscape necessary to
create a pedestrian scale; and,
• Providing for other amenities, such as
directional signs, intended to enhance the
overall pedestrian experience.
5.1.3 Create Landscape and Design
Guidelines to Reinforce the Area's
Identity
The Design Plan also provides landscape
guidelines for the setback areas and along the
public streets that pass through the center of the
ARSP area in order to reinforce the overall
consistency of the area's identity. The setback
landscape will also help provide a continuity ele-
ment in front of existing buildings that have a
variety of architectural styles. In addition, the
Design Plan includes design guidelines intended
to support the overall quality of development in
the ARSP area by establishing sound minimum
criteria for private development.
5.1.4 Enhance Public Views of the Theme
Parks, including Back -of -House Uses,
From Public Walkways and Streets.
A fourth design objective is to enhance public
views of theme park uses, from public walkways
and streets through a variety of design
interventions. Leading up to the theme parks,
visitors outside the park utilize public walkways
and streets to access theme park uses. As
visitors make their way to and from theme park
uses, landscaping and walls/fencing are utilized
at the pedestrian level to screen on -site buildings
and structures, enhance the visual experience,
and add to the sense of anticipation and arrival.
Buildings and structures are treated with varying
design elements based on height and visibility
from public walkways and streets in order to
5-3
5.0 Design Plan
enhance the experience of visitors outside of and
leading up to the theme park uses.
5.2 Design Concepts
The concepts described below are the basic
design policies for the ARSP area and form the
basis for implementation of the Design Plan.
They address the objectives of the Design Plan
described in Section 5.1, Design Plan Objectives,
and include a description of the important site
factors that will affect implementation of the
design concepts.
5.2.1 Transform and Unify with
Landscape
The primary concept of the Design Plan is to
transform the visual character of The Anaheim
Resort with landscape. The primary component
of this transformation will be the streetscape,
which includes trees and shrubs, as well as man-
made elements such as light fixtures, benches,
entry gateways, and signs. Setback areas on
private land between the public street and
buildings are also important in this
transformation. In some instances, the visible
portions of buildings and private land behind the
setbacks will also play a role in defining the
character of the ARSP area.
5.2.2 Create a District with a Grand Scale
The Anaheim Resort encompasses
approximately 1,078 acres, a large urban area in
which to create a unified identity. In addition,
many of the streets within The Anaheim Resort
are wide and provide important regional
circulation linkages. Finally, the number of
visitors to the area is flexibility significant and will
grow with development of the Anaheim Resort
and The Disneyland Resort Specific Plans.
Consequently, the character of The Anaheim
Resort as a whole must be grand in scale to
complement the size and importance of the area
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
as a world -class destination resort. The Design
Plan proposes creating a grand scale primarily
with large-scale landscape plantings and
architectural regulations, including building
heights and setbacks.
5.2.3 Emphasize Landscaping on Public
Streets
Most visitors to the ARSP area and the adjacent
Disneyland Resort Specific Plan area will
experience the area's streets at some time during
their visit, either from automobiles, other vehicles
(such as the pedestrian and/or transportation
system(s) or monorail discussed in The
Disneyland Resort Specific Plan), or on foot.
Nearly all of the publicly -owned land within both
areas is contained within the street rights -of -way
(or in easements), though the space available for
landscaping within the public right-of-way will be
somewhat limited because of the need to serve
vehicle and pedestrian circulation.
Streets and their edges furnish the primary space
in which landscaping can be placed to transform
the identity of The Anaheim Resort. Where new
rights -of -way are being created, sufficient space
will be provided within the right-of-way to
accommodate the proposed landscape.
5-4
5.0 Design Plan
Exhibit 5.2-1 Utilize the Streets for
Landscaping
5.2.4 Orient Visitors Visually
Visitors to the ARSP area and the adjacent
Disneyland Resort Specific Plan area often come
from great distances and lack familiarity with
Anaheim and The Anaheim Resort. These
visitors need well-defined visual cues that orient
them to their location within the area. In addition,
there is great variety in the different uses and
functions of the spaces within the ARSP area,
and the scale of the spaces often varies as well.
The Design Plan differentiates the major streets
within the ARSP area by establishing landscape
treatments that will help create a unique
character for each.
5.2.5 Create a Recognizable Center for
the Anaheim Resort
In coordination with The Disneyland Resort
Specific Plan, the Design Plan establishes an
area known as the Central Core, which will have
special design standards. It includes parcels
located on Harbor Boulevard between Interstate
5 and Orangewood Avenue, and on Katella
Avenue between Interstate 5 and Walnut Street.
For parcels adjacent to Harbor Boulevard and to
Katella Avenue, special design standards will
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
apply to setbacks and streetscape treatments
that are different from other locations in The
Anaheim Resort.
5.2.6 Coordinate Streetscape
Improvements with Other Improvements
The construction of the streetscape
improvements in the ARSP area will be
coordinated to the extent feasible with public and
private improvements, such as the
undergrounding of utilities. The intent is to install
public streetscape improvements as soon as
possible, while minimizing the need to disrupt
these improvements once they have been
installed.
5.2.7 Establish a Clear Design Hierarchy
The ARSP specifies three distinct levels of
design hierarchy called the Public Realm, the
Setback Realm, and the Private Realm. The
intent is that the most visually prominent areas
have the most rigorous design controls, and that
the design of less visually prominent areas be
more flexible.
Exhibit 5.2-2 The Three Elements of the
Design Hierarchy. The Public Realm, The
Setback Realm, and the Private Realm
Public Setback Private
Realm Realm Realm
Buiding
Envelope
Ultimate Pubic Building : Buildable
Right-of--%hy I Setback I Portion
Areas within the ultimate public right-of-way are
called the Public Realm. This visually prominent
area is the most precisely defined and designed
5-5
5.0 Design Plan
of the three Realms. The Public Realm concepts
for the entire Anaheim Resort area are regulated
by The Anaheim Resort Public Realm Landscape
Plan. The Setback and Private Realm concepts
are regulated for the respective specific plan
areas by the Anaheim Resort and Disneyland
Resort Specific Plans. The Setback Realm
includes the private property between the
ultimate right -of way and the required minimum
building setback. Since these areas are not quite
as significant to the overall character of the
ARSP area as the Public Realm, the plan
provides for more flexibility in their design. The
Private Realm, which includes areas behind
building setbacks adjacent to public streets, is
guided by design criteria that are the most
flexible of the three realms, but still contain
important design guidelines intended to enhance
the overall identity of the ARSP area.
Development of the Private Realm will occur with
less predictability than the other Realms, and so
less specificity is provided in the design
guidelines. Additional discussion of the three
Realms can be found in Subsections 5.6, 5.7,
and 5.8.
6.3 Landscape Concept Plan
This section of the Design Plan describes the
landscape design principles for the ARSP area
that will contribute to the unified environment
envisioned by the Plan. It contains a description
of the basic landscape concepts, criteria for the
selection of plant material, and general planting
design guidelines for the public streets and
adjacent setbacks, which the Plan calls the
Public Realm and the Setback Realm. The
Landscape Concept Diagram (Exhibit 3.9-9 of
The Anaheim Resort Public Realm Landscape
Program) shows how the principles have been
applied to the important streets in The Anaheim
Resort. Section 5.4, Landscape Cross Sections,
illustrates the basic landscape design principles.
The adopted Anaheim Resort Public Realm and
Landscape Program and Anaheim Resort Identity
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT
Program regulate the Public Realm within The
Anaheim Resort.
The landscape design drawings, photos and
landscape cross sections found in this Section
and Section 5.4, Landscape Cross Sections,
illustrate basic landscape design concepts, and,
unless needed to illustrate a concept described in
the text, do not contain dimensions or other
detailed information about street right-of-way
widths or minimum setback dimensions. Informa-
tion about street rights -of way and minimum
setbacks can be found in Section 4.3, Vehicular
Circulation Plan, and Section 7.0, Zoning and
Development Standards, respectively.
5.3.1 Plant Material Selection and Use
The purpose of this subsection is to:
• Describe the basic plant selection criteria for
the plants that will be used in the ARSP area;
• Describe the role each type of plant (tree,
shrub, ground cover) will play in establishing
the overall character of the ARSP area; and,
• Identify in a general way where and how each
type will be used.
The information in this subsection is
supplemented by a detailed plant palette in
Planning Standard Detail No. 10, which contains
a list of plants recommended for use in the ARSP
area. The purpose here is to provide the rationale
that serves as the basis for the plant palette.
6.3.1.1 Basic Selection Criteria
The desirable attributes of plants to be used in
the ARSP area include:
• Climate appropriate;
• Drought tolerant and/or low water using;
• Reasonably low in maintenance;
• Relatively free from disease and pest
infestation,
5-6
5.0 Design Plan
• Outstanding in some characteristic, such as
form, color, bark, etc.;
• Unlikely to be familiar outside subtropical
areas;
• Evergreen;
• Native to Southern California;
• Moderate or fast in growth; and,
• Suitable for use around people.
The intent is to establish an overall appearance
that has connection to Southern Californian
character while also integrating plants that are
climate -appropriate and/or low water using.
There is virtually no list of plants that could be
developed that would completely satisfy all of
these conditions. The intent is to provide a list
from which plants can be selected that will
provide the best plants to respond to the needs
of different uses/functions in the ARSP area, as
well as the flexibility to be used in a variety of
different situations.
6.3.1.2 Tree Selection and Use Criteria
Trees will be the backbone plant material of the
planting design because of the size and
widespread presence in the street rights -of -way
and setback areas. The following describes the
different types of tree forms that will be used
throughout the ARSP area, and the criteria that
will be used to determine how they will be used.
Small canopy trees: Small canopy trees are
intended for use where it is desirable to create a
more intimate scale (such as along narrow
streets or in pedestrian areas), where a contrast
with a larger tree will help reinforce the layered
landscape concept, or to contrast with a tree with
a distinctly different form. On wide streets where
the separation between trees from one side of
the street to another (or from a parkway to a
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
median planting) is thirty feet or greater, small
canopy trees should always be combined with
medium or large canopy trees.
Small canopy trees will have a mature height of
at least twenty feet, but not more than forty feet.
Their mature spread will be approximately equal
to their height. Along streets with regularly
spaced trees, small canopy trees will be planted
at a rate of one tree for each twenty to thirty
lineal feet of frontage; spreading trees may
require a somewhat wider spacing.
Medium canopy trees: Medium canopy trees
may serve the same purposes as either the large
or small canopy trees. Typically, they will have a
mature height of at least thirty feet but will not
typically exceed sixty feet. Their mature spread
will approximately equal their height. Along
streets with regularly spaced trees, medium
canopy trees will be planted at a rate of one tree
for each twenty-five to thirty-five lineal feet of
frontage; spreading trees may require a
somewhat wider spacing. Medium canopy trees
may be used on local or secondary streets but
should not be used alone on arterial roads or
other streets greater than sixty feet wide unless
there is a landscaped median.
Exhibit 5.3-1 Medium Canopy Trees
5-7
5.0 Design Plan
Large canopy trees: Large canopy trees will be
used on arterial roads to help reinforce the grand,
civic scale of The Anaheim Resort landscape.
They are intended to be large scale elements
that create a strong, positive visual impression.
Their mature height will not be less than fifty feet
and may exceed eighty feet. For the smaller
trees in this category, the spread will
approximately equal the mature height, while in
larger trees the spread will typically be 50% to
75% of the height. Along streets with regularly
spaced trees, large canopy trees will be planted
at a rate of one tree for each thirty to forty lineal
feet of frontage; spreading trees may require a
somewhat wider spacing. Large canopy trees
may also be used in setback areas that exceed
twenty feet in width and may be planted in
masses.
Exhibit 5.3-2 Large Canopy Trees
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
Vertical and Pyramidal trees: Vertical trees
have a mature height that dramatically exceeds
their mature width. Vertical trees will have a ratio
of height to width not less than 4:1, but which
may (in the case of certain varieties of palm)
exceed 20:1. Vertical trees will range in height
from 30 to 100 feet when mature. The spacing of
vertical trees will typically be from eight feet to
thirty feet on center for streets on which they are
regularly spaced, depending on the ultimate size
and spread of the specific tree. When the primary
purpose is screening, vertical trees will be
evergreen and will be spaced so that the mature
trees form a dense visual barrier. When used in
the Public Realm, vertical trees will generally be
used in combination with canopy trees, especially
areas with pedestrians, who will need canopy
trees to provide shade. Vertical trees are
especially useful in narrow setback areas as a
contrast with lower growing canopy trees or
shrubs to create the layered landscape.
Vertical and pyramidal trees are intended to
serve a variety of purposes. Among these are:
• Screening views of adjacent uses or property;
• Establishing regular, easily recognizable
geometric patterns; and,
• Providing a dramatic vertical expression that
stands out from the surrounding landscape.
Pyramidal trees have a characteristic shape like
a pyramid, and benefit from having space that
permits their lower branches to touch the ground.
Many needle -leafed evergreens, such as pine
and cedar trees, belong to this category.
Pyramidal trees will be used as screens, as
large-scale backdrop, in formal rows within
setbacks, or, where space permits, as large
specimens.
5-8
5.0 Design Plan
Exhibit 5.3-3 Vertical and Pyramidal Trees
6.3.1.3 Shrub, Vine and Ground Cover
Selection and Use Criteria
This subsection explains the role that will be
played by shrubs, vines and ground cover to
support the basic design established by the
trees.
Shrubs: Shrubs will serve several main design
purposes to reinforce the basic landscape plan,
including the following:
• Screen views of surface parking lots, service
areas, trash enclosures, and other sights that
detract from the garden -like character
envisioned for the area, or to provide privacy
for pool areas, outdoor eating areas, and
patios associated with ground floor hotel
rooms;
• Providing a physical barrier to discourage
pedestrians from crossing streets mid -block,
or to direct pedestrian and vehicular traffic;
and,
• Introducing an intermediate to low layer within
a layered landscape.
The Anaheim Resort Specific Plan 5.0 Design Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
Exhibit 5.3-4 Use of Shrubs to Screen
Surface Parking Lots
A large range of shrub species with varying
heights will be utilized to create an identity and
diversity within the planting palette in order to not
be dominated by a single species. Shrubs will
often appear as either loose (unclipped) or formal
(clipped) hedges of consistent height. Shrubs
that are very low growing (less than two feet tall),
and that spread widely will be used as a ground
cover, while shrubs that grow taller (up to fifteen
feet) will be used for screening.
Exhibit 5.3-5 Formal (Clipped) Hedges
Vary in Height
; l
5-9
Vines: Vines will be used for the following main
purposes:
• Creating a cloak to cover walls and buildings.
For example, clinging vines will be used on
parking facilities, buildings and walls to
enhance building elevations, and will help
discourage graffiti;
• Creating vertical and hanging gardens. Vines
will be trained to the trunks of palms in order
to enhance their appearance at the
pedestrian level and will be used in planters
on parking facilities or other buildings. Vines
will also be used on garden structures such
as arbors and trellises, especially where
limited planting area precludes a more
traditional planting of trees and shrubs; and,
• Establishing a sprawling ground cover in
large areas where the vine's growth can be
contained in the available space.
Ground Cover: In addition to spreading, low
growing shrubs and sprawling vines, ground
covers include turf and other grasses, low
growing annuals, and other varieties of plants
that do not generally exceed two or three feet in
height at maturity. Large areas of landscape will
be planted with low water -using ground covers in
order to reduce water usage and long-term
maintenance costs. The use of turf as a ground
cover will be limited to particular areas where its
smooth, green, manicured appearance and
ability to accommodate light pedestrian traffic is
needed. Generally, ground covers will be used to
create a green or colored blanket over the
ground.
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
Exhibit 5.3-6 Ground Cover Includes Turf
and Other Grasses, Annuals, and Other
Varieties of Plants
5.3.2 Layered Landscape Design Criteria
This subsection describes in more detail the
layered landscape concept and provides criteria
that will be used to design areas in the Setback
Realm designated to have a layered landscape
treatment.
Since planting in both the Public Realm and
adjacent Setback Realm will be needed to create
a layered landscape, successful implementation
requires that planting in both reinforce each
other. As a result, setback landscaping will vary
depending on the treatment of adjacent Public
Realm landscape.
Implementation of the layered landscape is most
important in two areas: along Katella Avenue and
Harbor Boulevard, the two major streets within
the Central Core; as an additional device to
create a unified appearance; and, adjacent to
large parking facilities, which will benefit from the
articulation of the building facade provided by the
variation in the size and height of plant material.
Such effective articulation for these buildings
would be difficult to provide only with
architecture. While construction of the layered
5-10
5.0 Design Plan
landscape in the Public Realm will be achieved in
large continuous sections of street, layered
landscape in the Setback Realm will be
constructed in smaller pieces as individual
parcels develop or are renovated. Achievement
of the layered landscape look will depend on the
successful enforcement of the concept on
numerous parcels over a number of years.
The length of the street frontage of individual
parcels is the most important factor that will
influence implementation of the layered
landscape. Parcel frontages of more than five
hundred lineal feet are long enough to provide
the variation needed to create the layered
landscape look within a single parcel, while
frontages of less than three hundred feet are too
short to provide much variation. Therefore, areas
that have many parcels with short frontages will
require special consideration. Exhibits 5.3-7
(Layered Landscape Design Criteria for
Properties with Frontages Greater than 300 Feet)
and 5.3-8 (Layered Landscape Design Criteria
for Properties with Frontages Less than 300
Feet) illustrate diagrammatically the criteria for
creating layered landscape based on the length
of parcel frontage.
The width of the landscape setback will also
affect the creation of the layered landscape. In
order to create a layered landscape, there needs
to be at least two horizontal or two vertical layers
of landscape. This means that in narrow set-
backs (10-20 feet wide), the selection of plant
material is likely to be different than for medium
(20-30 feet), or wide (greater than 30 feet)
setbacks. Wider setbacks permit the use of a
larger canopy or pyramidal trees, or will allow
more than three layers in the Setback Realm
alone. Exhibit 5.3-9 (Layered Landscape Setback
Width Criteria) illustrates diagrammatically the
criteria for creating layered landscape based on
setback width.
The Anaheim Resort Specific Plan 5.0 Design Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
Exhibit 5.3-7 Layered Landscape Design Criteria for Properties with Frontages Greater
than 300 Feet
Consistent street tree planting ibrms
layers(s) in Pubic Realm (typical) Vertical or canopy tree greater
than 50 ft tall at maturity
Minimum length: 150 ft
length for ground
Tall shrub or small Medium shrub, 5-15 ft
canopy tree, 10-25 ft tag tall at maturity
Exhibit 5.3-8 Layered Landscape Design Criteria for Properties with Frontages Less than
300 Feet
Consistent with street tree Within Setback Realm, each property
planting forms layer(s) in must match the layered landscape of
Public Realm (typical) one of its adjacent neighbors
Property A Property Property C '
1
5-11
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
Exhibit 5.3-9 Layered Landscape Setback Width Criteria
Typical plant
material "envelope"
1a1sff
Minimum of 2
horizontal and 3 vertical
layers in narrow width
setback areas
Alternate use of
medium scale plant
permitted (typical)
ME
mmm
15-25 ft
Minimum of 3 horizontal
and 3 vertical layers in
medium width setback
areas
5.0 Design Plan
Larger scale plants should
be used on wider setbacks
25-45 ft
Minimum of 3 horizontal and
3 vertical layers in wide
setback areas
Each layer shall be landscaped. The number and size of trees shall be balanced between all layers. See
Exhibit 5.3-10 (Tree Density Factor Plan) for size and number of trees in the setback areas.
5-12
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH
5.3.3 Minimum Tree Density
The Design Plan identifies trees as a critical
element necessary to create a civic scale, and
trees are also needed to establish the layered
landscape envisioned for the Setback Realm.
Trees in the setbacks adjacent to public streets
also support the landscaping proposed for the
Public Realm. Therefore, both the size and
number of trees, which are to be planted in the
Setback Realm are regulated by the minimum
landscape requirement.
To permit flexibility and design creativity in
landscape design, the minimum landscape
requirement recognizes that the effect of planting
many smaller sized trees is comparable to the
effect created by planting fewer large trees.
Therefore, the regulation allows for variation in
the size and number of trees. However, the
Setback Realm landscaping adjacent to public
streets must also be in conformance with the
requirements identified in Subsection 5.3.2,
Layered Landscape Design Criteria, which
requires a balanced number of
trees/plants/shrubs to be planted within the
various landscaping layers.
Refer to Planning Standard Detail No. 10 for
relevant tree spacing recommendations.
6.3.3.1 Tree Density to Vary According to
Adjacent Use
The Design Plan also recognizes that the density
of trees adjacent to some types of uses should
be different than the density adjacent to others.
The densest tree planting will be required
adjacent to residential uses. Dense planting will
also be required when intended to screen an
area as in the case adjacent to parking structures
or service areas. The least dense planting will be
required adjacent to the public right-of-way for
hotels, restaurants, or other visitor -serving uses
where visibility to the public is important.
5-13
5.0 Design Plan
5.3.3.2 The Tree Density Factor
To differentiate one tree density from another, all
final landscape plans submitted to the City for
approval will be required to show the Tree
Density Factor for each landscape area. To
establish the Tree Density Factor, all trees
planted in the setback areas will have a point
value based upon their size at installation. The
point value varies depending on the size of the
tree: large trees have a higher point value than
small trees (the actual values are defined below).
The Tree Density Factor for any landscape area
is defined as the sum of the point values for all
trees installed divided by the total area required
to be landscaped.
The ARSP establishes three levels of tree
density, as indicated in Table 5.3-1 Levels of
Tree Density.
Table 5.3-1 Levels of Tree Density
Tree Density
Tree
Level
Density
Factor
Screening adjacent to
sensitive areas, for
Very Dense
>_.8
example next to residential
zones and the MHP
Overlay Zone
Screening adjacent to
Dense
>%5 to <.8
parking structures, interior
property lines or the 1-5
freeways/ramps
Landscaping adjacent to
Moderately
>.3 to <.5
the public right-of-way for
Dense
hotels, restaurants and
other visitor -serving uses
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
Exhibit 5.3-10 (Tree Density Factor Plan), shows
the location of each density of tree planting
required by the plan adjacent to all public streets
and to properties bordering the ARSP area. All
trees are also subject to a minimum size at the
time of installation. Refer to the Planning
Standard Detail No. 10 for more information. The
tree point values are defined in Table 5.3-2 (Tree
Point Values).
Table 5.3-2 Tree Point Values
5-gallon tree (minimum tree size permitted
5 points
in the Setback Realm)
15 points
15-gallon tree
50 points
24-inch box canopy or vertical tree;
Washingtonia or Brahea species palm
with a trunk
125 points
36-inch box canopy or vertical tree;
Washingtonia or Brahea species palm
with a trunk:5 20 feet in height; Phoenix
species palm with trunk < 5 feet in height
300 points
48-inch box canopy or vertical tree;
Washingtonia or Brahea species palm
with a trunk > 20 feet in height; Phoenix
species palm with trunk:5 20 feet in height
600 points
60-inch box canopy or vertical tree;
Phoenix species palm with trunk > 20 feet
in height
1,200 points
72-inch box canopy or vertical tree
The total number of points for a given landscape
area within the setback must be equal to or
greater than the product of the Tree Density
Factor and the area to be landscaped. For
example, a 10,000 square foot landscape area
with a factor of .5 requires the total point value of
trees planted in this area to equal or exceed
5,000 points.
5-14
5.0 Design Plan
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
Exhibit 5.3-101 Tree Density Factor Plan
5.0 Design Plan
-vertnOnt:.Aye
o
City of
�r
_ :
"Anaheim_
r
��
•
Ball Rd m°^.
_ .....`L-
w - iLj
Bdl_I'.Rd.
Cerriios Ave
O
If
Q.
City of+
Anaheim. --
L-
Katella Ave
I
I
CRY BOUNDARY J
I
a�
City of
Garden Grove
Tree Density Factor Plan
LEGEND
The Anaheim Resort �-j
Boundary
The Anaheim Resort
t� Specific Plan Boundary
J City Boundary
`%
a,.
or:�eyrar,e'
ifieme. Park
S
flF
:o_\�
_Cemtos_Ave
0
o_
CA e rYlemr Park
=
..� . I175, .. Katella Ave.
i 9
`e
� . I
u — — — Orangewood_Ave R
I
� r� • ' � ---; � - - ... _ CITY BOUNUARY,
— — —City Ot
r Orange l
s —J Chapman Ave
I
MAP FEATURES
ttttttttt Moderately Dense -Tree Density Factor? 0.3 to <0.5
� Dense -Tree Density Factor? 0.5 to < 0.8
� Very Dense -Tree Density Factor>_ 0.8
t Central Core Intersection
5-15
Notes/Sources
ary Legal Lot Data, 2022
ary Boundary Dal.. 2122
0 800 1,600 `■
Feet ()
MARCH 2O24
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT
5.3.4 Plant Selection
This subsection is intended to assist in the
selection of plant material to be used within all
three Realms of the ARSP area. Planning
Standard Detail No. 10 contains two plant
selection matrices: one for trees and another for
shrubs, vines and ground cover. The plants listed
in Planning Standard Detail No. 10 fulfill the
planting design requirements contained in
Subsection 5.3.1, Plant Materials Selection and
Use, and identify the specific plant material that
may be used to satisfy the landscape
requirements in the Design Plan.
Planning Standard Detail No. 10 identifies the
trees by street location and Exhibit 5.4
(Landscape Cross Sections) identifies the
location of application. Subsection 5.3.1, Plant
Material Selection and Use, contains a
description of these classifications, and generally
describes the basic uses for each type of tree.
For each species, Planning Standard Detail No.
10 contains detailed information about the
character of the tree, including:
• maximum height and spread;
• spacing at installation;
• water use;
• intended use; and
• tree type.
Planning Standard Detail No. 10 identifies where
and how trees should be used, and the
appropriateness of each species for use in
different Realm areas. For the Private Realm,
any tree listed in the matrix may be utilized.
Planning Standard Detail No. 10 follows a similar
pattern by identifying the shrubs, vines and
ground cover by street location and application.
For each species, Planning Standard Detail No.
10 contains detailed information about the
character of the shrubs, vines and ground cover,
including:
5-16
5.0 Design Plan
• maximum height and spread;
• spacing at installation; and
• water use.
Planning Standard Detail No. 10 identifies where
and how shrubs, vines and ground cover should
be used, and the appropriateness of each
species for use in different Realm areas. For the
Private Realm, any shrubs, vines and ground
cover listed in the matrix may be utilized.
For Planning Standard Detail No. 10, a 'P'
indicates that the particular plant has either the
quality indicated (in the case of the portion of the
matrix which describes the plant's character), or
that the plant is preferred for the designation. A
solid dot indicates that the plant is acceptable for
the indicated use, and the absence of a dot
generally means that the plant should not be
used for the specified situation. Within the Private
Realm, the matrix may be interpreted more
freely; for example, it is acceptable for trees not
identified as specimens to be used as specimens
if planted in larger sizes (48" box, or larger). The
intent is to permit more flexibility for landscape
areas located in the Private Realm but visible
from the public right-of-ways.
Plants listed in Planning Standard Detail No. 10
should comprise at least 80% of the area to be
landscaped and 80% of the total list of plants to
be used within the Setback Realm and Public
Realm. Plants listed in Planning Standard No. 10
should also comprise at least 80% of the area to
be landscaped and 80% of the total list of plants
to be used within the Private Realm, where
visible from the public right-of-way. Ensuring
similar and complementary tree, shrubs, vines
and ground cover within both the Specific Plan
and The Anaheim Resort Public Realm
Landscape Program, and Planning Standard
Detail No. 10 will strengthen the overall
appearance of The Anaheim Resort.
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
Planning Standard Detail No. 10 may be
amended from time -to -time by the Planning and
Building Director to update the matrices with
more current and contemporary plant nursery
offerings that are more drought, disease and/or
pest -resistant plantings.
For plantings within the Public Realm, Planning
Standard Detail No. 10 identifies the preferred
species and location. The Public Realm matrix
may be amended from time -to -time by the
Planning and Building Director and the Public
Works Director. All plants and trees in the Public
Realm shall be subject to the review and
approval of the City.
5-17
5.0 Design Plan
The Anaheim Resort Specific Plan 5.0 Design Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
6.4 Landscape Cross Sections
The Landscape Concept Diagram in Exhibit 5.4
(Landscape Cross Sections) shows the different
landscape treatments proposed for each of the
major public streets in the area. This Diagram is
intended to illustrate the overall planting design
concept and does not show the actual size or
placement of trees and other landscape
elements.
The following landscape cross sections are
intended to provide a general overview of the
different landscape treatments that will help
create the unifying identity for The Anaheim
Resort. They also show the approximate location
of the Public Realm, Setback Realm and Private
Realm on each public street in the ARSP area. In
this way they provide a key to Sections 5.6,
Design Criteria for the Public Realm, 5.7, Design
Criteria for the Setback Realm, and 5.8, Design
Criteria for the Public Realm, which contain more
detailed information about each Realm, including
the role of each Realm creating an overall
unifying identity and a description of the specific
components of each respective Realm.
The cross sections are not intended to illustrate
every condition that may occur within or adjacent
to the street right-of-way, nor do they contain
setback and right-of-way dimensions.
5-18
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
Exhibit 5.41 Landscape Cross Sections
5.0 Design Plan
� � 28 • V eF bO Wv'
° C6" of-
C
1 Anaheim.
I 1
Ball''RcJ` r
_
74 �,p�, ,
d
gT7 1
1
!
=
It m:..
Disneyland
Theme Park 70
'-"Ma®ic Way'
f 21 %,
C•erriPos Ave t
0
4.
� �� 22f :Cemtos-A4e
I
!r
AnaWe- A - L�
CA Adyenfwe 5
ThemePo'k
!R
1
Kdtella Ave r7
L — a = '—= �
Kdtdllci -Ave
�
--- �= 7a
T
+
2319
f
-
9�
m
crryaau�aA.r
--� L
24
Orangewood Ave
}ar
City of
29 1 _
T
— _
�
cCrfy
Garden Grove
Jl� �
9
ofRY
I
r
Orange
`" - Chapman Ave-
t
Landscape Gross Sections
LEGEND
MAP FEATURES
fate./Source.
The Anaheim Resort
Boundaryg
—'� The Anaheim Resort
I— Specific Plan Boundary
a Segments of the Designated d
�nated Road
Specific Plan92-1
County Parcel Data, 2021
City Boundary Data,
*Refer to DRSP Sectionn 4 for additional
4f
information an road abandonment areas.
Boundary
C J CityBound.
Specific Plan 92-2
NOTE:
The numbers shown in the map above conespond
Specific Plan 93-1
to street cross sections specified within Section 4.4,
Anaheim Resort Arterial/Secondary system (with
the prefix 4.4-X).
0 750 L500
Feet
MARCH 2O24
5-19
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
Disneyland Drive
Exhibit 5.4-1 Disneyland Drive (North of Ball Road) Landscape Cross Section
Private j Setback
Realm I Realm
Setback landscape to consist of trees,
shrubs, ground cover and/or turf, planting
design to be layered landscape
Pedestrian sidewalk
eet trees in parkway to
isist of closely spaced
6cal trees
Public Realm
5-20
5.0 Design Plan
Setback I Private
Realm Realm
The Anaheim Resort Specific Plan 5.0 Design Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
Exhibit 5.4-2 Disneyland Drive (Between 825 feet n/o Katella Avenue and 1,350 feet n/o
Katella Avenue) Landscape Cross Section
Setback landscape to consist of trees, shrubs,
and ground cover and/or turf_
Pedestrian sidewalk
Street trees in parkways and
median to consist of altemating
vertical trees and medium or
large canopy trees
Planting on ground
may include shrubs,
ground cover and/or
turf
Private Setback Public Realm
Realm I Realm
Anaheim Resort
Specific Plan
5-21
Setback Private
Realm Realm
Disneyland Resort
Specific Plan
The Anaheim Resort Specific Plan 5.0 Design Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
West Street
Exhibit 5.4-3 West Street (South of Katella Avenue) Landscape Cross Section
Private Setback
Realm I Realm
Layered landscape in setback to consist of
trees, shrubs, vines, ground cover and/or turf
Pedestrian sidewalk
Parkway planting to consist of
medium or large canopy trees f
Planting on ground
may include ground
cover and/or turf .
Public Realm
5-22
Setback Private
Realm Realm
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
West Place
Exhibit 5.4-4 West Place Landscape Cross Section
Parkway landscape to consist of trees,
shrubs, ground cover and/or turf, planting
design to be layered landscape
Pedestrian Sidewalk
Small or medium canopy
tree as street tree
Planting on ground
may include ground
cover and/or turf
Private Setback I Public Realm
Realm I Realm
5-23
a-clu
Setback
Realm
5.0 Design Plan
16
Private
Realm
The Anaheim Resort Specific Plan 5.0 Design Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
Disney Way
Exhibit 5.4-5 Disney Way (East of Clementine Street) Landscape Cross Section
Private Setback
Realm Realm
Multi -use, Class I
bicycle facility
Pedestrian Sidewalk---n
edium or large canopy trees to be pl;
in landscaped parkway
Medium or large canopy trees
to be planted in median
I
5-24
ck Private
n Realm
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH
5.0 Design Plan
Exhibit 5.4-6 Ultimate Katella Avenue (Between Interstate 5 and West Street/Disneyland
Drive) Landscape Cross Section
Private I Setback
Realm Realm
Layered landscape in setback consists of trees,
shrubs, ground cover and turf.
Double row of Date Palms
twenty-four feet (24) on center
Ground cover
Special light fixtures mayinclude turf,
with banners in ground cover, or
ti
parkwayand median rshrubs
Public Realm
5-25
Setback I Private
Realm Realm
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH
5.0 Design Plan
Exhibit 5.4-7 Ultimate Katella Avenue (Between Walnut Street and West Street/Disneyland
Drive) Landscape Cross Section
Layered landscape in setback consists of trees,
shrubs, ground cover and turf.
Double row of Date Palms
twenty-four feet (24) on center
Special fight
fixtures with
banners in
parkway and
Private Setback
Realm I Realm
Ground cover
may include
turf, ground
cover, or shrubs
Public Realm
5-26
Setback Private
Realm I Realm
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
Walnut Street
Exhibit 5.4-8 Walnut Street Landscape Cross Section
Setback landscape to consist of trees, shrubs,
ground cover and/or turf; planting design to be
layered landscape.
Trees in parkway and median
to be regularly spaced medium
canopy trees
Landscape on ground
may consist of shrubs;
ground cover and/or turf
and may be bermed
Public Realm
Multi -use,
Class I
bicycle
facility
5-27
Setback Private
Realm I Realm
5.0 Design Plan
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
Harbor Boulevard
5.0 Design Plan
Exhibit 5.4-9 Harbor Boulevard (Between Chapman Avenue and Orangewood Avenue)
Landscape Cross Section
* F
Alternatin vertical tree and -=
Private I Setback
Realm Realm
Setback landscape to consist of trees,
shrubs, vines and ground cover
Pedestrian Sidewalk
medium or large canopy tree to � q'
be planted in tree wells
4.
h
Public Realm
5-28
Setback I Private
Realm Realm
The Anaheim Resort Specific Plan 5.0 Design Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
Exhibit 5.4-10 Harbor Boulevard (Orangewood to Manchester on the East Side and
Orangewood to 150-250 Feet South of Manchester Avenue on the West Side) Landscape
Cross Section
Layered landscape consisting of
trees, shrubs and/or ground cover
Vertical trees with vines planted at
base, thirty-two feet (32') on center,
Medium or large canopy trees in parkway and
median, thirty-two feet (37) on center, typical
Planting on
Special tight fixtures ground to consist
with banners in of barrier shrubs,
parkway and rnedian, gwnind cover
I I � 4
typical and/or tuq
Private I Setback Public Realm I Setback I Private
Realm Realm Realm Realm
5-29
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
5.0 Design Plan
Exhibit 5.4-11 Harbor Boulevard (Between Manchester Avenue on the East Side and 150-
250 feet South of Manchester Avenue on the West Side to the Interstate 5 Interchange)
Landscape Cross Section
Medium or large canopy trees in median
and parkway (as space permits), thirty-
two feet (32) on center, typical
Fence to be Planting on ground Special tight fbdwes
planted with to consist of with banners in
vines shrubs, ground parkway and median,
cover and/or fief N e Nf typical
Public Realm
5-30
Fence to be
planted with
vines
Note: Planting of vines
and parkway flee as
shown subject to approval
of Caltrans and the City
Engineer_
Setback I Pmiate
Realm Realm
The Anaheim Resort Specific Plan 5.0 Design Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
Exhibit 5.4-12 Harbor Boulevard (Interstate 5 to Vermont Avenue) Landscape Cross
Section
Private I Setback
Realm Realm
Setback landscape to consist of trees,
shrubs, urines and ground cover
Pedestrian Sidewalk
medium•' canopy tree to
be planted
Public Realm
5-31
Setback I Private
Realm Realm
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24
Ball Road
Exhibit 5.4-13 Ball Road (West of West Place) Landscape Cross Section
Setback landscape to consist of trees,
shrubs, vines and ground cover
Medium or large canopy trees to be planted
in landscaped parkway
Class II bicycle facility
Medium or large canopytrees
to be planted in existing
landscaped median
Public Realm Setback Private
Realm I Realm
5-32
5.0 Design Plan
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
5.0 Design Plan
Exhibit 5.4-14 Ball Road (Between West Place and Cast Place) Landscape Cross Section
Private
Realm
Setback landscape to consist of trees,
shrubs, vines and ground cover
Medium or large canopy
trees to be planted in
landscaped parkways
Painted
median
Public Realm
5-33
Setbac k I Private
Realm Realm
The Anaheim Resort Specific Plan 5.0 Design Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
Exhibit 5.4-15 Ball Road (East of Cast Place) Landscape Cross Section
Setback landscape to consist of trees, shrubs,
vines and ground cover
Medium or large canopy trees to be planted
in landscaped parkway
Medium or large canopy trees
to be planted in median, east
of Harbor Boulevard
Private I
Setbackl Public Realm I Setback I Private
Realm Realm Realm Realm
5-34
The Anaheim Resort Specific Plan 5.0 Design Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
Clementine Street
Exhibit 4.4-16 Clementine Street Landscape Cross Section
Parkway planting to consist of
alternating vertical trees and small
or medium canopy trees
Planting on ground may include
ground cover and/or turf
Median
planting to
consist of small
canopy trees,
shrubs, vines,
ground cover
and/or turf
Public Realm Setback Private
Realm I Realm
5-35
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
Haster Street/Anaheim Boulevard
Exhibit 5.4-17 Haster Street/Anaheim Boulevard Landscape Cross Section
$Otb*Cx kznd=ope to canes as trees.
shnam, vMw. ^Dew covo onrdfor hart
Parkway and median landscape to
consist of altennatire tall vertical trees
and small or medium carkopy trees
ftriMg on ground moycov,
of kK rhrld/or g nd COVW
Class II bicycle
facility
JS
1-3
6-M-1
5.0 Design Plan
The Anaheim Resort Specific Plan 5.0 Design Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
Convention Way
Exhibit 5.4-18 Convention Way Landscape Cross Section
Private I Setback
Realm Realm
Setback landscape to consist of trees, shrubs, ground
cover and/or turf, planting design to be layered landscape
Vertical Dalm where
Public Realm
5-37
Setback I Private
Realm Realm
The Anaheim Resort Specific Plan 5.0 Design Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
Exhibit 5.4-19 Gene Autry Way Landscape Cross Section
Setback landscape to consist of trees, shrubs,
ground cover and/or turf
Pedestrian Sidewalk
Alternating Palm/Canopy
Trees in the Parkways and
medians
Supplementary
median planting
of large, upright,
broad -leaf
evergreen
J shrubs
Public Realm
5-38
Setback I Private
Realm Realm
The Anaheim Resort Specific Plan 5.0 Design Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
Manchester Avenue
Exhibit 5.4-20 West Manchester Avenue Landscape Cross Section
Setback landscape to consist of trees, shrubs,
ground cover and/or turf, planting design to be
layered landscape_
Pedestrian Sidewalk
Street trees in parkways and
median to consist of alternating
vertical trees and small or
medium canopy trees
W
Private I Setback I Public Realm I Setback Private
Realm Realm 11 Realm Realm
5-39
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
5.0 Design Plan
Exhibit 5.4-21 North Manchester Avenue (Adjacent to Interstate 5, North of the Parking
Overlay) Landscape Cross Section
Private I Setback
Realm I Realm
Setback landscape to consist of trees, shrubs, ground
cover and/or turf; planting design to be layered landscape
Pedestrian Sidewalk
Street trees in
parkways to
consist of ,
alternating
vertical trees
and small or
medium canopy
trees
Public Realm
5-40
Interstate 5
Right -of -Way
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
5.0 Design Plan
Exhibit 5.4-22 North Manchester Avenue (Adjacent to Interstate 5 and the Parking Overlay,
North of Alro Way) Landscape Cross Section
Private Setback
Realm I Realm
Setback landscape to consist of trees, shrubs, ground
cover and/or turf; planting design to be layered landscape
Multi -use, Class
bicycle facility
Alternating
vertical trees
or small or AL A
medium
canopy trees
in landscaped
median
Street trees in
parkways to
consist of
alternating
vertical trees
and small or
medium canopy
trees
Public Realm
5-41
Interstate 5
Right -of -Way
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
5.0 Design Plan
Exhibit 5.4-23 Manchester Avenue, East of Anaheim Boulevard (Adjacent to Interstate 5)
Landscape Cross Section
Setback landscape to consist of trees, shrubs, ground
comer and/or turf; planting design to be layered landscape
Pedestrian Sidewalk
Street trees in
parkways to
consist of
alternating
vertical trees
and small or
medium canopy
Private I Setback
Realm I Realm
Public Realm
5-42
Interstate 5
Right -Of -Way
The Anaheim Resort Specific Plan 5.0 Design Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
Orangewood Avenue
Exhibit 5.4-24 Orangewood Avenue Landscape Cross Section
Pedestrian Sidewalk
Parkway planting to consist
of medium or large canopy
trees
Planting on ground
may include ground
At. cover and/or turf
Y
Private Setback Public Realm
Realm Realm
5-43
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
Chapman Avenue
Exhibit 5.4-25 Chapman Avenue Landscape Cross Section
Setback landscape to consist of trees,
shrubs, vines and ground cover
Medium or large canopy trees to be
painted in landscaped parkway
Medium or large canopy
trees to be planted in
existing landscaped median
Public Realm
5-44
5.0 Design Plan
Setbackl Private
Realm I Realm
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
Local Streets
Exhibit 5.4-26 Alro Way Landscape Cross Section
Setback landscape to consist of trees,
shrubs, ground cover and/or turf;
planting design to be layered landscape
Pedestrian Sidewalk
Small or medium
canopy tree as street
r
trees
Planting on ground
may include ground
cover and/or turf
Private Setback Public Realm
Realm Realm
5-45
5.0 Design Plan
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
Exhibit 5.4-27 Casa Vista Street Landscape Cross Section
Setback landscape to consist of trees,
shrubs, ground cover and/or turf,
planting design to be layered landscape
"--'est"an Sidewalk
mall or medium
anopy tree as street
Des
Planting on ground
may include ground
cover and/or turf
E ----
Prorate Setback Public Realm
Realm Realm
5-46
5.0 Design Plan
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
Exhibit 5.4-28 Vermont Avenue Landscape Cross Section
Setback landscape to consist of trees,
shrubs, ground cover and/or turf,
planting design to be layered landscape
4%
f
1
Pedestrian Sidewalk
Small or medium
canopy tree as street
trees
Public Realm I Setback I Private
Realm Realm
5-47
5.0 Design Plan
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH
Exhibit 5.4-29 Wilken Way Landscape Cross Section
Setback landscape to consist of trees,
shrubs, ground cover and/or turf;
planting design to be layered landscape
Pedestrian Sidewalk
Small or medium
canopy tree as street
trees
¢ r
' Planting on ground
may include ground
cover and/or turf
Private Setback Public Realm
Realm Realm
5-48
5.0 Design Plan
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
Exhibit 5.4-30 Zeyn Street Landscape Cross Section
Setback landscape to consist of trees,
shrubs, ground cover and/or turf;
planting design to be layered landscape
Pedestrian Sidewalk
Small or medium
canopy tree as street
trees
4 r
Planting on ground
may include ground
carver and/or turf
Private Setback Public Realm
Realm Realm
5-49
5.0 Design Plan
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
5.5 Identity Concept Plan
The Anaheim Resort Identity Program describes
how signs and other identity elements, such as
entry gateways and street furniture in the Public
Realm, and freestanding monument signs
identifying private businesses in the Setback
Realm, will help create the unified environment
envisioned for the entire Anaheim Resort. The
Anaheim Resort Identity Program was approved
by the City Council as a separate document. All
Public Realm Identity elements, as well as the
Freestanding Monument Sign Design, described
in the Anaheim Resort Identity Program are ap-
plicable to the entire Anaheim Resort.
This sign program for the ARSP will have the
following characteristics:
• Prior to installation, plans will be prepared
which show the location, sign type, and
message (or messages, in the case of a
changeable message sign) that will be used
for each sign in the ARSP area;
• Signs in the Public Realm (the ultimate public
right-of-way) and the freestanding monument
signs in the Setback Realm have been
designed as a family of signs with a con-
sistent design vocabulary; and,
• Consistent regulations for signs on private
property will make it easier for visitors to
quickly find their destination.
Additional important information about signs is
also contained elsewhere in the ARSP in Section
5.6, Design Criteria for the Public Realm; Section
5.7, Design Criteria for the Setback Realm; and
Section 1.1, Design Criteria for the Private
Realm. Section 7.0, Zoning and Development
Standards, contains the Anaheim Municipal Code
regulations which apply to signs in the ARSP
area.
5-50
5.0 Design Plan
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
5.6 Design Criteria for the Public
Realm
Exhibit 5.6-1 The Three Elements of the
Design Hierarchy. The Public Realm, The
Setback Realm, and the Private Realm
Public Setback Private
I Reafm Realm Realm
Bulding
Envelope
ultimate Public Building Buildable
Right-of-way I setback I Portion 1
As described in Section 5.2.7, Establish a Clear
Design Hierarchy, the Design Plan divides the
ARSP area into three segments: the Public
Realm, the Setback Realm, and the Private
Realm. The most visible segment, known as the
Public Realm, includes all the area within the
ultimate public right-of-way within the specific
plan area and includes public streets, street
medians, parkways and sidewalks. Because of
its visual prominence and because development
of this segment will primarily be implemented by
the City or other government agencies (i.e.,
Caltrans), more specific design solutions are
prescribed for the Public Realm than for the other
Realms. These design solutions are described in
The Anaheim Resort Public Realm Landscape
and Identity Programs, with supplemental
information provided in this section.
5-51
5.0 Design Plan
The primary design emphasis in the Public
Realm is to provide a streetscape design that
implements the major design concepts described
in the preceding sections. Adherence to the
streetscape design concepts for the Public
Realm is extremely important because of the
dominant role a street's image has in creating
The Anaheim Resort's identity. Creating a strong
identity is critically dependent on implementing a
consistent, high quality, streetscape treatment.
Virtually all who pass through the area will be
affected by the quality of the street environment.
The Public Realm includes public streets wholly
within the ARSP area or public streets on the
border of the Specific Plan area. The ARSP
describes all public streets contained wholly or
partially within the ARSP area. The Disneyland
Resort Specific Plan also identifies the ultimate
right-of-way within its boundaries as the Public
Realm. The design concepts of streets within the
Disneyland Resort Specific Plan and the ARSP
have been designed to be compatible so that The
Anaheim Resort, as a whole will have a
consistent design and identity. The public streets
that are entirely outside the ARSP area are not
described in this document. Interstate 5, which is
located outside The Anaheim Resort, has been
included within the Public Realm because of its
importance to the arriving visitor's experience.
Exhibit 5.6-2 (The Public Realm), shows the
extent of the Public Realm throughout The
Anaheim Resort.
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
Exhibit 5.6-2 1 The Public Realm
Vermont Nye
Q '_ i� CIfy�Of
s f`' Anaheim,
Ball' Rd'
FialI;R'd' a
3`
,Q
Ulsney qg4,
'Tileme°,Pork,
:fvlLrgiE";Nlay J
5.0 Design Plan
Cerritos Ave
CerritorsAge.
D
o
w
A.
�j}I
a-6,.Jex-V/.ay
Cltj/„of,
r
CALAbentuie' I;
.QnafiCln7 L 1 Th'eme,Park i
�` r
_Ort
Katella Ave � �r � t _ — _ � _ JICatella it
� Ia -� I , •.
cece� °
_ .,ane�Au'r,. W. .
I v1 9�
0
17-
:cny BOUNDARY_ I�
OrangewoodAve-
it
C'y__ of r COYBOUNDARy'___f
Garden Grove I G y of
--� r�!
F.—vecIF"
I Oi••= 4
abonment of Disneyland DrNe and Magicoadjacent Pudic Realm omw wig be.
Chapman",Ave — — — —
The Public Realm
LEGEND
�-j The Anaheim Resort
Boundary
The Anaheim Resort
Specific Plan Boundary
C J City Boundary
MAP FEATURES
_ The Public Realm
5-52
NM -/Sources
City Legal Lot Data, 2022
City Boundary Data, 2022
D 750 1.`.�DD O
�reet
MARCH 2O24
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
5.6.1 Gateways
Since many visitors will arrive in the area by
vehicle, the Specific Plan defines three different
types of gateways that will be oriented primarily
to vehicles: Freeway Gateways, Arterial
Gateways and Vehicular Arrival Gateways. The
Specific Plan also contains a Pedestrian Arrival
Gateway that will be oriented primarily to
pedestrians. The design of the gateways
reinforces the overall identity of The Anaheim
Resort according to the Identity Concept Plan
described in Section 5.5. The locations of the
Freeway Gateways, Arterial Road Gateways,
Vehicular Arrival Gateway, and Pedestrian Arrival
Gateway are shown on Exhibit 5.6-3 (Gateway
Location Plan).
The following is a general description and guiding
principles for each of these major gateways.
6.6.1.1 Freeway Gateways:
The Plan identities three freeway gateways along
Interstate 5 as shown on Exhibit 5.6-3 (Gateway
Location Plan). They will be the first experience
of The Anaheim Resort for nearly 70% of arriving
visitors and will be oriented primarily to vehicles.
Because most of the visitors to The Anaheim
Resort will be arriving via Interstate 5, it has an
important role in creating and enhancing the
overall Anaheim Resort identity. The design of
the Interstate 5 interchanges with Disneyland
Drive, Harbor Boulevard/Ball Road, and Katella
Avenue/Disney Way will reinforce and
complement the overall design objectives of the
Plan. Secondary carpool access to The Anaheim
Resort and Platinum Triangle is provided at Gene
Autry Way; however this interchange does not
include the same design considerations as the
other major interchanges.
Each interchange is treated as a large-scale gar-
den easily perceived from vehicles traveling at
5-53
5.0 Design Plan
freeway speeds. To differentiate the interchanges
from one another, each features a distinct
landscape type found in Southern California. The
Disneyland Drive interchange is a temperate
garden, featuring vertical evergreen trees; the
Harbor Boulevard/Ball Road interchange, a
temperate/subtropical garden, featuring large
flowering canopy & vertical trees consistent with
the Public Realm landscape on Harbor
Boulevard; and the Katella Avenue/ Disney Way
interchange, an and garden, featuring succulent
and other plants characteristic of the Southern
California deserts. Plants are selected for their
drought tolerance to the extent feasible, as well
as their ability to create a visual impact and
identity.
The three primary Freeway arrival gateways are
located at the Interstate 5 Katella Avenue/Disney
Way, Harbor Boulevard/Ball Road, and
Disneyland Drive interchanges, since the majority
of vehicles to The Anaheim Resort will use these
interchanges. The design concept for these
gateways extends the landscape treatment of the
adjacent Freeway interchange in The Anaheim
Resort until a smooth transition can be made to
the public streets.
The character of the freeway gateways will be
created primarily by landscaping, which may
consist of large-scale plantings of trees and
directional signs. Other features incorporated into
these gateways include:
• Night lighting which highlights the arrival
experience;
• Architectural elements consistent with the
other garden -like elements to be used in the
area; and,
• Identification signs to supplement the
directional signs.
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
Exhibit 5.6-3 1 Gateway Location Plan
Ve�o�s Pve
96CI Rd
I
City;afw
Aria_ him
Ball' Rd'
A ti c
.� a
Dlsneyldn'rl i
?Tifemg.Rark,
I' AAp�FVJOM _. L �• w .
,Cerritos Ave �'
', Cerritos -Ave.
I m o.
m.
° o r
City of
Anaheim ») j I Theme; Park �
r
_ Canrenlfon ` a _� ' f
yY ,
I 6 !B
' N 9.
P
CrrY 60UNDARY_ I, _
r . = — — —' :Orangewood A've
5.0 Design Plan
City of
Garden. Grove
NOTES:
I.
Freewoy, Adedal, and ArrivalGateways all camPlefed prior }o Disneylandr-onward.
With the exception of the Amval Gateways at fM1e Southeast Disfnct and Disney Way, all
other Gatewayys wmplefed Ppnnor fo DisneylandForward. Completed gateway desrgns
moy be modir�d as part of ruNre development, in accordance with relevant DRSP
and ARSP design guidance.
Gateway Location Plan
LEGEND
The Anaheim Resort
Boundary
The Anaheim Resort
i_ Specific Plan Boundary
J City Boundary
CFWDOUNDARY! _
I
City o`f
I r Orange
-Chap man A've — — —
MAP FEATURES
Freeway Gateways Pedestrian Arrival
Gateways
. Arterial Road Gateways
_ Vehicular Arrival Gateways
IDimeyland Drive North, Disneyland Drive
South, Southeast District North, Southeast
District East, and Disney Way/Clementine Street]
5-54
Notes/Sourc.s
City legal Lot Dota. 2022
aty Bwnd.,y Dot., 2022
•The Anaheim Rewl Identify Program
�-, 0
MARCH 2O24
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
6.6.1.2 Arterial Gateways:
Arterial gateways occur on Harbor Boulevard and
Katella Avenue near the edges of the Central
Core area. They are oriented primarily to vehicles
and include the following primary elements:
• Trellis -like architectural elements located in
the median and/or parkways, depending on
local conditions;
• Trellis elements with the same appearance at
each location, though their arrangement may
vary;
• Trellis elements placed on a base which
reinforces the element's traditional character;
• Landscape on the ground features color and
large, uniform shrub masses, seasonal color,
or other similar landscape plantings;
• The gateways allow for the attachment of
flags and banners; the deployment of these
elements is related to seasonal or event -
driven needs;
• The Anaheim Resort logo is included in the
gateway; and,
• Night lighting highlights the gateway after
sunset.
There are four arterial road gateways, which are
described below. Additional information regarding
the arterial road gateways is provided in The
Anaheim Resort Identity Program.
5.6.1.2.1 Harbor Boulevard North
The Harbor Boulevard North gateway is located
at the northern entry into the Central Core area. It
is located immediately south of the intersection of
Harbor Boulevard and Manchester Avenue.
Because of the constrictions in the parkways on
the east side of Harbor Boulevard, the garden
trellis architectural elements are limited solely to
the medians.
5-55
5.0 Design Plan
Exhibit 5.6-4 Harbor Boulevard North
Gateway
5.6.1.2.2 Harbor Boulevard South
The Harbor Boulevard South gateway is located
at the southern entry into the Central Core area.
It is located immediately north of the intersection
of Harbor Boulevard and Orangewood Avenue.
To match the Harbor Boulevard North gateway,
the garden trellis architectural elements are
limited solely to the medians.
5.6.1.2.3 Katella Avenue East
The Katella Avenue East gateway is located west
of the intersection of Katella Avenue and
Anaheim Bou levard/H aster Street. The gateway
elements, including the garden -trellis
architectural elements are placed in both the
median and 8-foot parkway on either side of the
street. No elements span the street. The gateway
area begins several hundred feet west from the
intersection with Haster Street west of the left -
turn lane median.
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
5.6.1.2.4 Katella Avenue West
The Katella Avenue West gateway is located
east of the intersection of Katella Avenue and
Walnut Street. The gateway elements, including
the garden -trellis architectural elements, are
placed in both the median and 8-foot parkway on
either side of the street. No elements span the
street. The gateway area begins immediately
east of the intersection unless there is a left -turn
lane for westbound traffic, in which case the
gateway area will begin immediately east of the
left -turn lane median.
Exhibit 5.6-5 Katella Avenue West
Gateway
6.6.1.3 Vehicular Arrival Gateways
There are two Vehicular Arrival Gateways
located within the Specific Plan area. These
vehicular arrival gateways include Harbor
Boulevard at the Theme Park East Overlay
entrance and Manchester Avenue along the
Parking Overlay.
These Vehicular Arrival Gateway will be primarily
oriented to vehicles but will also accommodate
pedestrians. To be compatible with the Arterial
Gateways in The Anaheim Resort Identity
Program, the Vehicular Arrival Gateway may
include elements located in the parkways,
subject to the approval of the Planning and
Building Director and Public Works Director.
Special landscape planting will enhance these
gateway areas and may provide for pageantry,
such as flags and banners. Special architectural
1_1
5.0 Design Plan
features may span from one side of the street to
the other, or from parkways to medians. Night
lighting will be used during the evening to
enhance the gateway's effect. Sign copy
identifying The Disneyland Resort may also be
included within the Vehicular Arrival Gateways
and are regulated by Section 7.0, Zoning and
Development Standards. Any elements
constructed in the public right-of-way prior will be
required to obtain an encroachment agreement
from the City. A more detailed plan depicting the
arrival areas in the public right-of-way shall be
submitted for review and Public Works Director
for conformance with The Anaheim Resort
Identity Program.
5.6.1.3.1 Theme Park East Overlay Vehicular
Arrival Gateway
As part of DisneylandForward, a new Vehicular
Arrival Gateway is proposed along Harbor
Boulevard at the Theme Park East Overlay within
the Specific Plan area. The Theme Park East
Overlay Vehicular Arrival Gateway will be located
on the east side of Harbor Boulevard at the
intersection of Convention Way. This Vehicular
Arrival Gateway will be primarily oriented to
vehicles and include special landscape planting,
surrounding garden elements, and along with
pageantry and night lighting to enhance the
gateway's effect.
5.6.1.3.2 Parking Overlay Vehicular Arrival
Gateway
As part of DisneylandForward, a new Vehicular
Arrival Gateway is proposed along Disney Way
between Clementine Street and Harbor
Boulevard and Manchester Avenue/Clementine
Street from Disney Way to the north boundary of
the Parking Overlay. Since the final configuration
of the DRSP East Parking Area has not yet been
determined, the precise configuration and
character of this gateway has not yet been
established. However, the gateway elements
may include:
• The drop-off area adjacent to Harbor
Boulevard, which may be moved to the
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
Parking Overlay or DRSP East Parking
Area in conjunction with the construction
of a parking facility and at least one and
up to three pedestrian bridges over
Harbor Boulevard;
Landscape, architectural, and sign
elements that visitors entering the theme
parks will use and see;
Pedestrian walkways and/or
transportation system(s) which will move
people to the entry plaza; and,
A Harbor Boulevard pedestrian crosswalk
in combination with at least one and up to
three pedestrian bridges over Harbor
Boulevard.
5.6.1.4 Pedestrian Arrival Gateway
Pedestrian Arrival Gateways occur between
public parking facilities and theme park entry
plazas, such as the existing Pedestrian Arrival
Gateway on Harbor Boulevard in the Disneyland
Resort Specific Plan. They will be primarily
oriented to pedestrians and the gateway area
may include the entire experience from the
parking facility to the theme park entry. The
character of these gateways is related to the
theme park experience and may consist of
architectural, lighting, and landscape elements
which are organized to heighten the pedestrian's
anticipation of entering the theme park.
Informational and directional signs, flags and
displays may be part of the gateway, as well as
marquee signs intended to identify the theme
parks to pedestrians and vehicles. Sign copy
identifying The Disneyland Resort may also be
included within the Pedestrian Arrival Gateway
and are regulated by Section 7.0, Zoning and
Development Standards. A more detailed plan
depicting the arrival areas in the public right-of-
way shall be submitted for review and approval
by the Planning and Building Director, and Public
Works Director for conformance with The
Anaheim Resort Identity Program.
5-57
5.0 Design Plan
5.6.1.4.1 Theme Park East Overlay Pedestrian
Arrival Gateway
As part of Disneyland Forward, a new Pedestrian
Arrival Gateway is proposed along Harbor
Boulevard at the Theme Park East Overlay. The
Theme Park East Overlay Pedestrian Arrival
Gateway will be located on the east side of
Harbor Boulevard at the intersection of
Convention Way. It will include special landscape
planting, surrounding garden elements, and
pageantry and night lighting to enhance the
gateway's effect.
5.6.2 Public Streets
Public streets are the backbone of the Public
Realm. The design concepts for the public
streets are described in The Anaheim Resort
Public Realm Landscape Program.
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
5.7 Design Criteria for the Setback
Realm
The Setback Realm includes the required
structural setback area between the Public and
Private Realms. The primary role of the Setback
Realm is to support the design objectives for
ARSP area by reinforcing the design of the
streets. The setback areas vary significantly in
width, use and character. Consequently, the
design guidelines for the Setback Realm vary
depending on these factors. Visual consistency
will be achieved by application of the common
landscape vocabulary, such as the layered
landscape concept described in preceding
sections, and the regularity of the landscape
treatment along the adjacent public streets. The
widths of the setback areas are identified in
Section 7.0, Zoning and Development Standards.
Exhibit 5.7-1 The Three Elements of the
Design Hierarchy: The Public Realm, The
Setback Realm, and the Private Realm
Public Setback Private
Realm I Realm Realm
Buiding
Envelope
Ultimate Public Building Buildable
Right -of -Way I Setback I Portion
5-58
5.0 Design Plan
5.7.1 Exterior Lighting
The following guidelines apply to exterior lighting
in the Setback Realm or where visible from the
public right-of-way.
• Special accent lighting may illuminate unique
architectural details where appropriate, but
such lighting should be focused and used
sparingly.
• Multi -colored lights may only be used
sparingly.
• Landscape lighting, including tree uplights,
small bare -bulb incandescent lights, "twinkle"
lights, and other similar lighting effects are
encouraged to add a glittering or specular
effect to supplement the indirect nature of the
rest of the Specific Plan area's night lighting.
Requirements for exterior lighting are found in
Section 7.0, Zoning and Development Standards.
5.7.2 Freestanding Monument Sign
Guidelines
The major sign element in the Setback Realm is
the freestanding monument sign for identification
of private businesses. Since these signs are
designed to reinforce the identity of The Anaheim
Resort, a similar trellis vocabulary is used.
The plan provides for freestanding monument
signs to be located within the Setback Realm.
These signs are intended to identify particular
uses or properties. The Anaheim Resort Identity
Program (Appendix C) and Section 7.0, Zoning
and Development Standards, contains design
criteria, which regulate the location, size,
appearance and message of these signs.
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
Exhibit 5.7-2 Freestanding Monument
Sign
Hotel/motel owners may place standardized
affiliation information on the Freestanding
Monument Sign as shown in Exhibit 5.7-3
(Freestanding Sign Design Criteria).
Exhibit 5.7-3 Freestanding Sign Design
Criteria
ww" m seba& sgeaNdto
MeftAve between Hader
Shut WW W*4d Sheet end
He�hor Badowd WWwn
hde�slste 5 end omnwwxw
AYeme_ 0 feet else iw% 7 feet
mhnmm.
Freestanding monument signs are located in the
Setback Realm to provide a primary source of
business identification for all categories of
commercial enterprise. They are part of the
identity elements for The Anaheim Resort and as
such contribute to the unifying effect of the
overall identity sign and streetscape program.
5-59
5.0 Design Plan
5.7.3 Central Core
The principal objective within the Setback Realm
in the Central Core is to create a consistent, high
quality pedestrian environment that reinforces the
character established by the landscape and other
street elements contained in the Public Realm.
Generally, these objectives are achieved by:
• Building massing that defines the street edge
in a consistent manner;
• Limiting the extent of the area devoted to the
automobile;
• Special intersection landscape treatment for
intersections in the Central Core as well as
other major entrances in The Anaheim
Resort;
• Planting design which is compatible with the
treatment of the adjacent Public Realm
• Limiting the variety of outdoor lighting effects;
and,
• Consistent size, placement and treatment of
signs.
Requirements for the Central Core are contained
in Section 7.0, Zoning and Development
Standards. Exhibit 5.7-4 (Basic Central Core
Design Principles) is a diagram, which illustrates
the basic Central Core design principles. The
following guidelines provide property owners with
additional recommendations for this area.
Exhibit 5.7-4 Basic Central Core Design
Principles
Ground floor use to
attract pedestrians
f�
No parking between building
and right-of-way
Consistent sign design
k
Consistent paint pallette and
landscpae design treatment ■ i
Public I Setback ;Private
Realm Realm ;Realm
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
6.7.3.1 Central Core Architectural
Guidelines
Property owners are encouraged to articulate
building masses adjacent to the right-of-way with
elements such as:
• Recesses in windows and door openings.
• Variations in building height.
• Balconies and awnings.
• Buildings with distinct layers —a base, a
middle and a top.
6.7.3.2 Central Core Circulation and Parking
Guidelines
The following circulation and parking guidelines
are intended to enhance the pedestrian
experience:
• Eliminate curb cuts and driveways that
disrupt the flow of pedestrians whenever
feasible; eliminate redundant access
driveways to the same parcel or consolidate
driveways on adjacent parcels.
• The maximum width of a driveway should not
exceed twenty-eight (28) feet.
• Entry to hotel parking areas (including those
located under buildings) and surface parking
lots may be directly from the adjacent Central
Core street provided such entry is not more
than 28 feet wide and is less than 20% of the
width of the property.
• The maximum number of curb cuts per lot
should adhere to the following:
Parcel Width
Number of Curb Cuts
300 feet or less
1
>300 feet
2
5-60
5.0 Design Plan
Exhibit 5.7-5 Redundant Curb Cuts
Parcel A
Parcel A
!
Parcel B
Parcel B
access
'
access
driveway
'
driveway
J ,
_+I
a!
2i
a;
i
Sidewalk
-----------
-i -
-••-••-••-•
...................
'
T
Central Redundant curb
Core Street cuts disrupt
pedestrian traffic
Exhibit 5.7-6 Consolidate Curb Cuts
Parcel A
!
Parcel A !
Parcel B Parcel B
access (Di
access
driveway -i !
driveway
�i
ai
2
d!
Reciprocal access
easements may be
necessary to assure
permanent access
ht_of_way
Sidewalk
Central
Core Street
Consolidated
driveways smooth
pedestrain flow
Exhibit 5.7-7 Limit Portion of Elevation
Devoted to Parking Area Entries
Entry to parking areas
covers no more than 28 feet
I
! !
i Parcel Width
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
6.7.3.3 Central Core Landscape Guidelines
The landscape character of the Setback Realm in
the Central Core should support the "garden
district" image of The Anaheim Resort, the
landscape of the adjacent Public Realm and the
underlying layered -landscape concept described
earlier in Subsection 5.3.2, Layered Landscape
Design Criteria. Where there is adequate space
and the scale is appropriately grand, trees should
be planted in a way that creates large-scale
horizontal and vertical layers.
Special intersection landscape treatment, as
depicted in Exhibit 5.7-8 (Special Intersection
Landscape Treatment), is required and further
described in Section 7.0, Zoning and
Development Standards, for the following
intersections, which are either entry points to The
Anaheim Resort or major intersections within this
area. All of these intersections are within the
Central Core except for the Ball Road
intersections:
• Harbor Boulevard and Manchester Avenue;
• Harbor Boulevard and Orangewood Avenue;
• Katella Avenue and Anaheim Boulevard/
Haster Street;
• Katella Avenue and West Street;
• Ball Road and West Street/Disneyland Drive;
and,
• Ball Road and West Place.
The criteria for the Harbor Boulevard and Katella
Avenue Intersection Area are located in Section
7.0, Zoning and Development Standards and
Section 1.5 of The Anaheim Resort Public Realm
Landscape Program and are generally depicted
in Exhibit 5.7-9 (Harbor Boulevard/Katella
Avenue Intersection Area).
5-61
5.0 Design Plan
Exhibit 5.7-8 Special Intersection
Landscape Treatment
Low shrubs
colorfulplar
Intermix of
street trees
Public Right-0fway
Exhibit 5.7-9 Harbor Boulevard/Katella
Avenue Intersection Area
IIPECNLPAVWG:
All PAYING WRNW THE PUBLIC RE"
SKALL6E SPECIAL PAVWOMATTRIAL
PER CRY STANDARDS
LE.TMVLTE RIDER OFWAY—
CURB—
SIDEWALK—
DATE PALM TREE
PALM TREE IN —
TREE ORATE
SPECIAL PAVING START
POINfATMIERSECIWN
OF EKMMN OF CURS LINES
KING PALMIREES
IN TREE MATES
I• AD1%C'ENTTO Bus UMP
/ — Bu88TOP-
IJ WHERE OCCURS
L DAIS PALM TREE
SCULPTURALIWBA
DESIGN ELEMENTS
NOTE;
FINAL LANDSCAPE DESIGN SMECT TO
REVIEW AND APPROVAL FROM PLANNING
AND PUBLIC WORKS DEPARTMENT.
5.7.4 Areas Outside of the Central Core
In the areas of the Anaheim Resort Specific Plan
outside of the Central Core, the intent of the
Design Plan is to permit flexibility in site planning,
architectural design, location of parking areas,
and landscape design. The design standards for
this area are contained in Section 7.0, Zoning
and Development Standards.
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
5.8 Design Criteria for the
Private Realm
Exhibit 5.8-9 The Three Elements of
the Design Hierarchy. The Public
Realm, The Setback Realm, and the
Private Realm
Public Setback Private
Realm Realm I Realm
guiding
(Ultimate Public Right -I Building I Buildable
j of -Way j Setback ; Portion
The Private Realm includes the privately -
owned property not included in the Setback
Realm described in the previous section. It
encompasses all of the developable area of
a parcel. Although the Private Realm is less
visually prominent than the Public Realm
and the Setback Realm, the design
guidelines contained in this section and the
design standards contained in Section 7.0,
Zoning and Development Standards, are
intended to help strengthen the over quality
and character of development in the
Specific Plan area. The design guidelines
and standards serve two main purposes:
• To ensure high quality development
projects will occur over time by providing
uniform design criteria; and,
• To help minimize development costs by
reducing ambiguity about what type of
criteria will be applied by the City when
evaluating specific development
proposals.
5.0 Design Plan
5.8.1 Organization of Private Realm
Design Standards and Guidelines
The design guidelines and design standards
provide both the general design principles
and the specific regulations that will guide
the design of private development projects
within the Specific Plan area.
In this Section, "guidelines" are considered
to be generalized rules to be applied by
designers with discretion and judgment to
the particular condition which they address.
They are intended to help guide designers
to solutions that will enhance the quality of
development projects within the Specific
Plan area. They are not intended to provide
the only design solution to every condition a
designer might face, and should not
discourage creative and innovative
solutions. In situations where they apply,
however, they should be followed.
The term "standards" refers to regulations
found in Section 7.0 of the Anaheim Resort
Specific Plan (ARSP) and in Title 18 of the
Anaheim Municipal Code.
City staff and decision makers will use both
the guidelines and standards to evaluate
projects for conformance with the intent of
the Design Plan and the specific
requirements of the Anaheim Municipal
Code.
5.8.2 General Site Planning
Guidelines
Site planning is the process of arranging
buildings, landscaped areas, circulation,
parking, and service areas on a particular
site. The following are recommended in
5-62
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
addition to the requirements in Section 7.0,
Zoning and Development Standards:
• Long, unarticulated building facades
should not be placed adjacent to
portions of the Setback Realm adjacent
to public rights -of -way.
• Provide landscape buffers between
different land uses.
• Orient at least one public entry toward
major streets.
• Provide direct pedestrian access from
public walkways to buildings, where
appropriate.
• Provide secondary entries to buildings
from parking areas or interior pedestrian
walks.
• Design buildings to allow pedestrians to
circulate around buildings without
stepping into vehicular driveways.
• Provide pedestrian circulation between
adjacent commercial properties where
appropriate.
• Provide reciprocal easements between
adjacent properties for shared
driveways and parking aisle
connections.
Exhibit 5.8-2 Landscape Buffer
between Uses
4
5.8.3 Service, Storage and
Maintenance Areas and Loading
Docks Guidelines
Although service, storage and maintenance
areas and loading docks are important to
the smooth function of uses within the
5-63
5.0 Design Plan
Specific Plan area, they are not
aesthetically compatible with the planned
resort and entertainment areas. These
areas should be incorporated into the main
building whenever possible.
It is important that the requirements in
Section 7.0, Zoning and Development
Standards be followed so that these areas
do not detract from the visual quality of the
Specific Plan area.
Exhibit 5.8-3 (Screen Service Areas from
View) demonstrates how these areas
should be screened.
Exhibit 5.8-3 Screen Service Areas
from View
5.8.4 Exterior Lighting Guidelines
Nighttime illumination of buildings is
important in creating an interesting and safe
environment. In addition, it can highlight
building design features, add emphasis to
prominent entrances and plazas, and create
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
an ambiance of vitality and security. In
addition to the requirements of Section 7.0,
Zoning and Development Standards, the
following guidelines suggest ways in which
these purposes can best be served.
• Relate exterior lighting to the design
elements of the site and building they
serve. Lighting should highlight archi-
tectural elements and details and not
entire walls.
• Design exterior lighting to be an integral
part of the overall architectural concept.
Fixtures, standards and all exposed
accessories should be harmonious with
the building design and the visual
environment. Obtrusive lighting
elements that detract from the
appearance of their setting should be
avoided.
• Illuminate the entrances of buildings and
parking areas to promote convenient,
safe and easy identification.
• Exterior lighting within private
development should complement and
not conflict with public lighting.
• Consider energy conservation in
nighttime lighting plans. Plans for the
design and operation of lighting and
illumination should be developed
consistent with the latest technical and
operational energy conservation con-
cepts.
• Include exterior lighting of pedestrian
walkways within private development.
Pedestrian walkway lighting levels
should be set relative to the level of
security necessary
The guidelines shown in Table 5.8-1
(Allowable Lighting Levels by Level of
Security), are averages. Higher lighting
levels may be necessary to provide for
safety, subject to the approval of the City.
5-64
5.0 Design Plan
Table 5.8-1 Allowable Lighting Levels
by Level of Security
Average conditions
0.5 footcandle
Security conditions,
2.0 footcandle
9-15 foot tall fixtures
Security conditions,
4.0 footcandle
15-30 foot tall fixtures
5.8.5 Surface Parking Area
Guidelines
Parking lot design is a critical factor in the
success or failure of a commercial use. In
considering the possibilities for development
of a parking area, the following factors will
be analyzed: ingress and egress; avoidance
of pedestrian and vehicular conflicts;
conflicts with street traffic; and the overall
configuration and appearance of the parking
area.
The following guidelines are in addition to
the requirements of Section 7.0, Zoning and
Development Standards:
• If future expansion is contemplated,
areas should be reserved for parking
expansion and indicated as such on
plan submittals.
• Shared parking should be
accommodated between adjacent
parcels when appropriate.
• Avoid heavily -textured paving that may
create a difficult walking surface.
• Provide pavement strength of all parking
areas consistent with the expected
traffic.
• Discourage surface parking (excluding
short-term parking associated with hotel
drop-off areas) between the street
setback and a building/structure within
one hundred feet of a street intersection,
as measured from the ultimate right-of-
way line. (Surface parking is prohibited
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
in the Central Core between the front
setback and the building/structure.)
• Locate parking areas to the rear or, if no
space is available, to the side of
buildings, whenever possible.
• Design parking facilities in a manner
such that any vehicle on the property
will be able to maneuver to exit from the
property traveling in a forward direction.
• Design parking facilities so that a car
within a parking area will not have to
enter a street to move from one location
to another within the same site.
• Use landscape areas, walkways, and
plazas to reduce the visual impact of
large surface parking areas.
• Encourage right angle (900) parking
stalls to minimize total surface parking
area.
• Design parking areas so that
pedestrians walk parallel to moving
cars.
• Minimize situations where pedestrians
must cross parking aisles at right
angles.
• Design the parking lot so that drive
aisles are perpendicular to the main
building wherever feasible.
• Direct vehicular circulation through a
parking area to the outer edge of the lot
where there is less pedestrian traffic.
• Direct vehicular circulation away from
fire lanes.
• Design the parking area to link the
building to a sidewalk system that is an
extension of the pedestrian walk system
through the use of design elements
such as painted or enhanced paving,
architectural features, and/or landscape
treatments.
• Minimize the number of entrances and
exits to reduce conflicts at entries and
lessen possible congestion at street
intersections.
5-65
5.0 Design Plan
Exhibit 5.8-4 Screen Parking From
View
Exhibit 5.8-5 Pedestrians Move
Perpendicular to Parking Spaces
5.8.6 Parking Structure Guidelines
Parking structures will be found throughout
the ARSP area, and their design is an
important consideration in the overall visual
quality of The Anaheim Resort. The design
guidelines in this section and the
requirements in Section 7.0, Zoning and
Development Standards are intended to
assure that parking structures incorporate
design features, which make them more
attractive.
• Consider allowing climbing vines to
grow on the surfaces of parking
structures on elevations of the structure
that face public streets.
• Consider adding planters for hanging or
climbing vines on the elevations of the
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
structure that face public streets.
• Consider stepping back parking
structures above the fourth level on
elevations adjacent to a public street,
when such structures exceed four levels
in height. If a parking structure has
frontage adjacent to two or more public
streets, consider stepping the structure
back on the street with the highest traffic
volume.
• Consider creating openings in the upper
decks that allow light to lower levels for
parking structures that are only one or
two levels above grade, and permit
trees to be planted on grade under the
openings that, when mature, will extend
above the structure.
• Parking levels may be stepped or
terraced to visually soften the overall
mass of the structure.
• Parking structure facade articulation
should:
o Create a sense of order through play
of light, shadow and texture.
o Minimize horizontal or vertical
banding by balancing both vertical
and horizontal elements.
o Use openings, columns and beams
to visually segment exterior surface
and provide scale.
o Spandrels are to be level and
uniform when feasible.
o Differentiate pedestrian and
vehicular entrances.
• Building design should
employ clean,
simple, geometric
forms and
coordinated massing
that produce
overall unity, scale
and interest.
Appropriate treatments include:
o Straightforward geometry.
o Unified composition.
o Delineation of floor levels and
structure.
o Solid parapets.
5-66
5.0 Design Plan
• Facades should reflect a coordinated
design concept, including portrayal of
building function, structure and scale.
Appropriate treatments include:
o Straightforward, functional design.
o Expression of structure with columns
and beams.
o Unity and scale reinforced through
an integrated grid module.
o Surface delineation through use of
reveals, mullions and recesses.
• Detailing should be clean, clear and
straightforward. Details should reinforce
overall design unity, interest and scale.
Appropriate treatments include:
o Coordinated mullions and details.
o Delineation and alignment of
structural connections
o Finishes commensurate with
building materials.
o Coordinated entry spaces and
landscaping.
• Street facades should be designed to be
visually interesting and screen parked
cars from exterior views.
• Avoid horizontal banding.
5.8.7 Building Appearance
Guidelines
Building appearance guidelines in this
section and the requirements in Section 7.0,
Zoning and Development Standards
address the following elements: massing,
shape, scale, and materials. The intent of
these guidelines and standards is to assure
a harmonious relationship between
buildings in the ARSP area without requiring
a particular architectural theme. This can be
achieved by careful attention to building
massing, building materials and color. The
guidelines in this section are intended to
apply to both new construction and
renovation of existing buildings.
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
Existing buildings may need more latitude in
the interpretation of these guidelines
because of the limited opportunities to make
fundamental changes in building massing,
for example, than would be possible in new
construction.
5.8.8 360-Degree Architectural
Treatments
As part of DisneylandForward, design
guidance for on -site buildings and structures
visible from the public right-of-way and from
abutting residentially -zoned properties, is
provided in DRSP Section 5.7.9, 360-
Degree Architectural Treatments. In the
Anaheim Resort Specific Plan area, 360-
Degree Architectural Treatments is
applicable to the Theme Park Overlay; refer
to the Disneyland Resort Specific Plan for
applicable guidelines. The 360-Degree
Architectural Treatments criteria applies if it
has been determined through a sight -line
study submitted to the Planning and
Building Department that a proposed
building or structure will be visible by a 6-
foot tall person from the furthest point of the
ultimate public right-of-way on the opposite
side of the street or from a point 400 feet
from the property line on perpendicular
streets, as detailed in DRSP Section 7.0,
Zoning and Development Standards.
Application of the design criteria for the
highest height range for a proposed building
or structure, in lieu of criteria for the lower
height ranges, will be required all the way to
grade unless the Planning and Building
Director determines by review of a sight -line
study that the fencing/walls and landscape
buffers provided will adequately screen
views of the proposed building or structure
in the lower height range(s) from the public
right-of-way.
In the Theme Park East Overlay and the
DRSP Southeast District, buildings or
structures adjacent to the abutting
5-67
5.0 Design Plan
residentially -zoned properties, application of
the Greater than 30-Foot up to 50-Foot
Height Level design criteria will be required
for surfaces above 20 feet.
5.8.9 Building Massing
Creating attractive building masses is an
important factor contributing to the overall
character of the Specific Plan area. The
intent of the guidelines is to promote
building mass that is rich visually and
creates a more exciting and varied urban
landscape, but does not place too much
importance on any single building.
Buildings, which have a large
undifferentiated mass are often unattractive,
and detract from the Specific Plan's goal of
encouraging more pedestrian activity,
because their size and scale make pe-
destrians feel uncomfortable.
The following guidelines are intended to
guide designers in creating building masses
that satisfy the goals of the Specific Plan. It
is not necessary that every guideline be
employed in the design of every building;
rather, each guideline should be viewed as
a suggestion that should be considered for
any building in the Specific Plan area.
• Create spaces with building masses,
whenever possible; avoid creating
building masses which are perceived as
objects.
• Design buildings to be members of a
harmonious group, rather than
independent, sculptural masses.
• Use building mass to enhance the
pedestrian scale of the street. Increase
the articulation of building massing adja-
cent to major pedestrian walks and
gathering places. Increase landscape
and architectural detail at the ground
level.
• Consider the location, size and scale of
neighboring buildings when massing
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
new buildings. Create a harmonious
relationship between adjacent facilities,
regardless of whether or not they are on
the same parcel.
• Articulate the different parts of a building
facade using color, arrangement of
facade elements, a change in materials,
or other architectural devices.
• Vary the height of the building so that it
appears to be divided into distinct
elements.
• Use rooflines to help establish the mass
of a building; whenever feasible, the
form of the roofline should physically
represent its function; avoid mansard
roofs.
5.8.10 Building Materials and Colors
The intent of these guidelines is to
encourage the use of materials and colors
that enhance the physical cohesiveness of
the area, and to convey a sense of
permanence. Although no particular
material is specifically prohibited, the use of
some materials is discouraged because it
would be difficult to achieve the guidelines'
goal of promoting cohesiveness and
permanence.
6.8.10.1 Walls
• The preferred dominant material for
walls is masonry in any of the following
forms: natural stone (including granite,
sandstone, marble and limestone),
brick, stucco, poured in place or precast
natural concrete (sandblasted, textured,
or exposed aggregate), and painted
concrete.
• Wall materials that may be used with
care include:
o Split face, slump, or other forms of
concrete block.
o Shingle, clapboard, vertical, or
angled wood siding.
• Use of the following materials will
5-68
5.0 Design Plan
require a special design solution or
other unique condition in order to be
successful:
o Exotic wood treatments, such as
distressed wood, pecky cedar, log
cabin look, stained fir plywood, or
gingerbread filigree.
o Reflective (mirror) glass curtain wall.
o Corrugated metal.
o Imitation rock work.
o Plastic molded imitations of any
conventional building material.
o Silver or clear anodized aluminum
sheets.
o Imitation wood siding.
o Flat or molded plastic sheeting.
o White brick.
o Tilt -up concrete.
o Antique or old brick with partial paint,
mottled light variegated brick,
oversized brick, and white brick
mortar.
• Discourage wall and/or window mounted
room air conditioners unless they are
concealed from public view, or are
integrated into the architecture.
5.8.10.2 Windows
• The preferred dominant material for
windows is transparent or lightly tinted
glass.
• Lightly reflective or solar glass may be
used above the first floor.
• Windows of dark or highly reflective
glass are not recommended, especially
on the first floor elevations, and will
require exceptional or unique solutions
to make them acceptable.
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
6.8.10.3 Roof Materials
• When visible from the street, the
preferred roof materials include natural
colored terra cotta tile, concrete tile, and
other similar materials.
• Roof materials that will require a special
design solution or other unique condition
in order to be successful include: wood
shakes, wood shingles, fiberglass shin-
gles, composition shingles, corrugated
metal and standing seam roofs.
6.8.10.4 Building Color
Building color guidelines provide another
means to visually unify the ARSP area by
narrowing the range of choices to a group of
colors that are visually compatible with one
another. Although it is not the intent of the
guidelines to eliminate any specific color
from consideration or use within the Private
Realm, the following criteria provide
appropriate guidance for the selection of
building color.
• Encourage large building surface areas
to be light colored. In general, accent
elements, including, but not limited to,
windows, doors, awnings, building trim
and light fixtures may be either dark or
light colored.
• Limit the dominant surfaces of a building
to only complementary colors; accent
areas may include a greater variety of
colors.
5.8.10.6 Awnings
Awnings can be used to create an inviting
space in front of a building where people
may step away from the flow of pedestrian
traffic and find a shady protected area.
• Allow awnings that are continuous or
broken to differentiate windows and
display areas; awnings can become an
important element in a storefront design
as they may be used to unify a
storefront with the whole building.
;• • e
5.0 Design Plan
• Design the shape of the awning to fit the
architecture. Awnings that are barrel
shaped segmented arches or round -
ended create distinctive images, but
should be used sparingly and only when
they do not conflict with the building's
architectural elements.
• Ensure the highest point of a first floor
awning not be higher than the midpoint
of the space between the second story
window sills and the top of the first floor
storefront window, awning, canopy, or
transom. This attachment should leave
a comfortable space between awning
and architectural elements, which
comprise the building.
• Ensure that the awnings do not obstruct
the views to adjacent businesses.
• Avoid awnings of more than a single
color per building.
5.8.11 Sign Guidelines
Signs are one of the most visible design
elements in the ARSP area. The purpose of
establishing sign guidelines solely for the
Specific Plan area is to:
• Reinforce Identity.
• Encourage graphic excellence.
• Reduce conflicts between signs.
• Improve appearance of the Specific
Plan area.
• Create consistency among signs.
• Promote sign legibility.
• Promote smooth flow of traffic as people
are able to identify sites.
The guidelines below establish positive
criteria for the design of desirable signs and
which complement the other building
elements in the ARSP area.
• Use a brief message. The fewer the
words, the more effective the sign. A
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
sign with a brief, succinct message is
simpler and faster to read, looks cleaner
and is more attractive.
• Avoid faddish and bizarre typefaces.
Such typefaces may look good today,
but soon go out of style. The image
conveyed may quickly become that of a
dated and unfashionable business.
• Avoid hard -to -read, intricate typefaces.
These typefaces reduce the sign's ability
to communicate.
• Select sign colors and materials to
contribute to legibility and design
integrity. Even the most carefully
thought out sign may be unattractive
and a poor communicator because of
poor color selection.
• Use significant contrast between the
background and letter or symbol colors.
If there is little contrast between the
brightness or hue of the message of a
sign and its background, it will be
difficult to read.
• Use complementary colors on signs.
Too many colors overwhelm the basic
function of communication. The colors
compete with content for the viewer's
attention. Limited use of the accent
colors can increase legibility, while large
areas of competing colors tend to
confuse and disturb.
Harmonize sign size with the scale of
the structure.
Place signs consistent with the
proportions of scale of building elements
within the facade. Within a building fa-
cade, the sign may be placed in different
areas. A particular sign may fit well on a
plain wall area but would overpower the
finer scale and proportion of the lower
storefront. A sign appropriate near the
building entry may look tiny and out of
place above the ground level.
Place wall signs to establish facade
rhythm, scale and proportion where
facade rhythm does not exist. In many
5-70
5.0 Design Plan
buildings that have a monolithic or plain
facade, signs can establish or continue
appropriate design rhythm, scale, and
proportion.
• Use widely recognized logos rather than
print/text whenever possible.
• Avoid signs with strange shapes. Signs
that are unnecessarily narrow or oddly
shaped can restrict the legibility of the
message. If an unusual shape is not
symbolic, it is probably confusing.
Consider carefully the proportion of
letter area to overall sign background
area. If letters take up too much sign,
they may be harder to read. Large
letters are not necessarily more legible
than smaller ones. A general rule is that
letters should not appear to occupy
more than 75% of the sign panel area.
Make signs smaller if they are oriented
to pedestrians. The pedestrian -oriented
sign should read from a distance of
fifteen to twenty feet, the vehicle -
oriented sign is viewed from a much
greater distance. The closer a sign's
viewing distance, the smaller that sign
need be.
Design wall signs to be appropriate to
the building on which it is placed. The
wall sign is an integral part of the
building facade. The style of a wall sign
should be appropriate to the style of a
building's design.
5.8.12 Landscape Guidelines
• Design landscape and open space
areas to be an integral part of the overall
site plan design.
• Use trees to define and enclose exterior
spaces, and to provide physical
protection from the sun and wind.
• Provide for landscaped open space
areas that enhance the building design
and public views and provide buffers
and transitions between adjacent uses.
• Use trees, shrubs and vines to conceal
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
walls, building elevations and parking
facilities.
• Use arbors, trellises, walls, gates and
other elements to reinforce the
architecture of adjacent buildings; land-
scape structures should be compatible
and consistent with the architectural
treatment of the adjacent buildings.
• Screen undeveloped, vacant land
intended for future phases with plants
that prevent wind and water erosion.
• Space plants to assure unobstructed
visual access for vehicles and
pedestrians.
• Ensure that plant materials do not
interfere with security lighting, or restrict
access to emergency apparatus such as
fire hydrants or fire alarm boxes.
• Provide simple, bold and easy to
maintain landscape planting designs
which incorporate many drought tolerant
plant materials.
• Landscape elements visible from the
public right-of-way should blend with
and seem a part of the public right-of-
way landscaping.
• Provide for plant palettes that include
both long- and short-lived plant
materials. Long-lived materials include
trees and most shrubs; short-lived
materials include perennials, annuals
and some shrubs.
• Select plant materials which are suited
to the soil and climatic conditions of the
site.
• Minimize the use of water through the
selection of plants that are drought
tolerant when they are mature.
• Space trees and shrubs with
consideration for their ultimate size.
• Ensure that all ground cover is healthy
and densely foliated, and is comprised
of well -rooted cuttings or container
plants.
5-71
5.0 Design Plan
• Provide a mix of plant material sizes in
informal plantings.
Exhibit 5.8-6 Landscaping Detail at
Ground Level
5.8.13 Wall and Fence Guidelines
• Use walls and fences for security, visual
screening, and aesthetic purposes.
• Ensure that walls and fences are
consistent with the architecture of the
adjacent building in terms of material,
color, and form.
• Avoid walls which feature long,
unarticulated surfaces. Use pilasters,
height variation, setback variation, land-
scaping, and surface texture to vary the
wall surface.
• Provide walls and fences that are of the
following preferred materials: masonry,
wrought iron and painted steel tubing.
5.8.14 Pedestrian Paving Guidelines
These guidelines for pedestrian pavements
apply to all paved areas on private property
intended for use by pedestrians, including
areas to be used by both pedestrians and
vehicles. Pedestrian pavements may
include, but are not necessarily limited to:
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
5.0 Design Plan
sidewalks, paths, walkways, courtyards, and o Wooden boardwalk type paving (not
plazas. suitable where heels might catch in the
cracks between the boards).
• Desirable qualities of pedestrian paving
surfaces:
o A surface texture rough enough to
prevent slipping, but smooth enough
to prevent stumbling.
o Maintenance free.
o Stain resistant.
o Fade resistant.
o Non -reflective.
• Acceptable pedestrian paving materials:
o Concrete: broom finished, salt
finished, heavy sandblasted.
o Colored concrete.
o Stamped and saw -cut concrete,
provided the pattern does not have
joints or score lines that catch high
heels, or cause tripping.
o Unit pavers, including brick, stone,
concrete and tile, provided the
pavers do not have joints or score
lines that catch high heels, or cause
tripping.
• Pedestrian paving surfaces which may
be used in situations where the
limitations of the material have been
considered include:
o Decomposed granite (not suitable
for use where disabled access
should be provided).
o Loose gravel (not suitable for use
where disabled access should be
provided, or where heavy pedestrian
traffic can be expected).
o White, or very light colored paving
(not suitable where glare from the
surface will affect pedestrian safety).
o Asphalt (not suitable where the
asphalt is likely to become soft on
hot days).
5-72
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
Exhibit 5.8-7 1 Wall/Fencing Plan
5.0 Design Plan
`• ve�oRi_Pve
4
City}"Of= �
r r `Anaheim
Ball Rd'' Ball' RcJ'
f off,
- A ♦ cs
bekin8'
�
AsPor_k
I�'MOg1eaVJay� L — ;
� 1
Q
Cernfos Ave p
rl ;ta i 1. � CemtosAve
�( \
�I 0 -
m
' a I r —
G�
city Of N� 1 r 1 DIs eyWSy �`
inn ah eI Rl Theme Park;
ICafellcl _Ave �,� ®e y, t r R 1 4 I� P Katella
IF; A
I ` eYMla
__j
Gene Autry Way-
+ � N
CO BOUNDARY, I -
r — — — - Orangewood AveOR
r
mil r Way
City of
Garden.:Grove I � I l
1 City of
IOrange
Wall/Fencing Plan
LEGEND
The Anaheim Resort
Boundary
The Anaheim Resort
I_ .+ Specific Plan Boundary
C J City Boundary
MAP FEATURES
AffileNeWIND Sound attenuation wall permitted
at surface parking areas with
min. height of 12 feet and max.
height of 16 feet, subject to A.M.C.
Chapter 18.114
5-73
Notes/Sources
City Legal Lot Dot.. 2022
City Boundary Data, 2022
0 750 1,500 IIIA
♦_® Feet fir:
MARCH 2O24
The Anaheim Resort Specific Plan 6.0 General Plan Consistency
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
Section 6.0: General Plan
Consistency
California Government Code §65450-§65453
permits the adoption and administration of
Specific Plans as an implementation tool for
elements contained within the local General Plan.
The City of Anaheim General Plan provides
guidance for long-term growth and development in
the City through comprehensive plans for future
development. Specific Plans must demonstrate
consistency in regulations, guidelines and
programs with the goals, objectives, policies,
programs and uses that are set forth in the
General Plan.
Table 5.9-1 of Supplemental Environmental
impact Report No. addresses the consistency of
the Anaheim Resort Specific Plan (ARSP) with the
relevant City of Anaheim General Plan Goals and
Policies and said table is incorporated by
reference into the ARSP.
For Disneyland Forward, Table 5.10-1 of
Supplemental Environmental Impact Report No.
352 addresses the consistency of the ARSP with
the relevant City of Anaheim General Plan Goals
and Policies. This table is herein incorporated into
the Specific Plan by reference.
6-1
The Anaheim Resort Specific Plan 6.0 General Plan Consistency
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
This page is intentionally blank.
6-2
The Anaheim Resort Specific Plan 7.0 Zoning and Development Standards
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
For purposes of the Planning Commission hearing documents, this Chapter
is provided as Attachment No. 4b of the staff report.
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
8.0 Legal Description
AN
8.0 Legal Description
S_ -
n gar
—
,t
The Anahelm Resort
Speciflc Plan
LEGAL DESCRIPTION
a 9sIS Q `KA TE
AVE
+CrtY of
Garden Grove
Kt y ;b Fires
Amman Earl spedve Plan sawca
5�Y
ter-
SueE
YE-AsM
8-1
CHA4PUAN
clfr0f
Crarig it
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
'vERMdN..�s -
8.0 Legal Description
Inset 1 ■j;,/ Feet
u Anaheim Resort specific Plan Boundary
0 The Anaheim Resort°' Boundary
8-2
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
8.0 Legal Description
Legal Descriptions °� "o
Inset 2 Fee
1�' Anaheim Resort Specific Plan Boundary
,_a The Anaheim Resort"" Boundary
8-3
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
311�
I
1
1
I
I
1
I
1
1
1
Legal Descriptions
Inset 3
0 Anaheim Resort Specific Plan Boundary
I—J The Anaheim Resort"' Boundary
.. 7
I_ Anaheim City Boundary
i"`wA-"j ORANGEWOOD
t-#--370" AVE
8.0 Legal Description
a t0
■
1
"
a,
i N
■
1
8-4
The Anaheim Resort Specific Plan Appendix A
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
APPENDIX A: List of Specific Plan Amendments, Adjustments and Associated
Actions
The following is a consolidated list of past Anaheim Resort Specific Plan (ARSP) amendments,
adjustments, and associated actions since the original ARSP adoption in 1994.
ARSP Amendment No. 1. On June 3, 1997, the City Council approved Amendment No. 1 in
connection with an amendment to the Land Use Element of the City's General Plan and Conditional
Use Permit No. 3917. These actions designated 4.67 acres, located on the northern side of
Orangewood Avenue and east of Harbor Boulevard, for Commercial Recreation land use and
incorporated the site into the Anaheim Resort Specific Plan (SP92-2) Zone. The General Plan
Amendment amended the Land Use Element to designate the site from Medium Density
Residential to Commercial Recreation land uses with a density of Low -Medium permitting up to 75
hotel rooms per gross acre. The Specific Plan Amendment reclassified the site from the RM-1200
(Residential, Multiple -Family) Zone to the SP92-2 Zone, C-R District. Conditional Use Permit No.
3917 approved the conversion of an existing 139-unit, 2-story, 8-building apartment complex into
a 136-unit Vacation Ownership Resort. The City Council approved these actions by adopting
Resolution Nos. 97R-73, 97R-74 and 97R-75 on May 20, 1997, and adopting Ordinance No. 5599
on June 3, 1997. Prior to approving Amendment No. 1, the City Council, by motion, on May 20,
1997, determined that Mitigated Negative Declaration and Mitigation Monitoring Program No. 0096
were adequate to serve as the required environmental documentation for this request.
ARSP Adjustment No.1, On May 18, 1999, the City Council approved Adjustment No. 1, which
amended Chapter 18.116 of the Anaheim Municipal Code (Anaheim Resort Specific Plan 92-2
(SP92-2) Zoning and Development Standards) to modify the setback and yard requirements to
reflect the local street status of Convention Way by Ordinance No. 5685. The City Council found
that this amendment was categorically exempt from CEQA under CEQA Guidelines Section
15061(b)(3), which provides that where it can be seen with certainty that there is no possibility that
the activity in question may have a significant effect on the environment, the activity is not subject
to CEQA.
ARSP Amendment No. 2. [Withdrawn by the applicant.]
ARSP Amendment No. 3 On August 17, 1999, the City Council approved Amendment No. 3 in
connection with an amendment to the Land Use Element of the City's General Plan. Amendment
No. 3 reclassified and incorporated a 0.73-acre site, located at the northwestern corner of Casa
Grande Avenue and Casa Vista Street, from the RM-1200 (Residential, Multiple -Family) Zone to
the ARSP Zone, amended ARSP text, exhibits, legal description and zoning and development
standards to reflect said reclassification. The General Plan Amendment amended the Land Use
Element to designate the project site from Medium Density Residential to Commercial Recreation
with a density of Low -Medium permitting up to 75 hotel rooms per gross acre based on the total
gross acreage of the four lots, and not a per lot or parcel basis. Amendment No. 3 and the
associated General Plan Amendment were approved by Resolution No. 99R-166 and 99R-167
adopted on July 27, 1999 and by Ordinance No. 5694 adopted on August 17, 1999. Prior to
approving Amendment No. 3, the City Council, by motion, on July 27, 1999, determined that a
A-1
The Anaheim Resort Specific Plan Appendix A
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
Mitigated Negative Declaration and Mitigation Monitoring Program No. 0108 were adequate to
serve as the required environmental documentation for this request.
MEIR First Validation Report. On August 30, 1999, the Planning Commission determined that no
substantial changes had occurred with respect to the circumstances under which MEIR No. 313
was certified, and that there was no new available material information which was not known and
could not have been known at the time MEIR No. 313 was certified, thereby validating MEIR No.
313 and the associated Mitigation Monitoring Program No. 0085 for continued use as the
environmental documentation required by CEQA for projects within the ARSP.
ARSP Adiustment No. 2. On September 21, 1999, the City Council approved Adjustment No. 2 to
the ARSP to amend Chapter 18.116 (Anaheim Resort Specific Plan 92-2 (SP92-2) Zoning and
Development Standards) to modify the minimum landscape setback requirement for properties
adjacent to Manchester Avenue between Katella Avenue and the southern boundary of the ARSP
Zone. The City Council approved this action by adopting Ordinance No. 5703, including a finding
that this amendment is categorically exempt from CEQA under CEQA Guidelines Section
15061(b)(3), which provides that where it can be seen with certainty that there is no possibility that
the activity in question may have a significant effect on the environment, the activity is not subject
to CEQA. On August 8, 2000, the City Council subsequently adopted Ordinance No. 5734 to correct
an clerical error in the Code that was adopted by Ordinance No. 5703.
ARSP Adiustment No. 3. On May 1, 2001, the City Council approved Adjustment No. 3 to the
ARSP to amend Chapter 18.116 (Anaheim Resort Specific Plan 92-2 (SP92-2) Zoning and
Development Standards) relating to temporary parking requirements including time limitations,
landscape, and screening requirements, and permitted fence and wall materials. The City Council
approved this action by adopting Ordinance No. 5769, including a finding that this amendment is
categorically exempt from CEQA under CEQA Guidelines Section 15061(b)(3), which provides that
where it can be seen with certainty that there is no possibility that the activity in question may have
a significant effect on the environment, the activity was not subject to CEQA.
ARSP Adiustment No. 4. On April 27, 2004, the City Council approved Adjustment No. 4 to the
ARSP to amend Chapter 18.116 (Anaheim Resort Specific Plan 92-2 (SP92-2) Zoning and
Development Standards) to permit office uses in a legal non -conforming building subject to
approval of a Conditional Use Permit. Ordinance No. 5910 included a finding that the previously -
certified MEIR No. 313 and Mitigation Monitoring Program No. 0085 was adequate to serve as
environmental documentation for this request.
ARSP Amendment Nos. 4 and 5. On June 8, 2004, the City Council approved Amendment No. 5
to the ARSP (which also incorporates Amendment No. 4) in connection with a citywide General
Plan and Zoning Code Update (ZCA 2004-00029). ARSP Amendment No. 4 included modifications
to Chapter 18.116 (Anaheim Resort Specific Plan 92-2 (SP92-2) Zoning and Development
Standards) intended to streamline project review processes. Amendment No. 5 expanded The
Anaheim Resort boundaries to include approximately 26.4 acres located along Harbor Boulevard,
from Orangewood Avenue to the south city limit, into the Anaheim Resort Specific Plan (SP92-2)
Zone. The City Council approved these actions by adopting Resolution Nos. 2004R-95 and 2004R-
97 on May 25, 2004, and by adopting Ordinance Nos. 5920 and 5922 adopted by June 8, 2004.
►_M
The Anaheim Resort Specific Plan Appendix A
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
Prior to approving Amendment No. 5, the City Council, by Resolution No. 2004-94, on May 25,
2004, certified Environmental Impact Report No. 330 prepared for the citywide General Plan
Amendment and Zoning Code Update, adopted a statement of findings and overriding
considerations in connection therewith and adopting Mitigation Monitoring Program 85a, to serve
as the required environmental documentation for this request.
MEIR Second Validation Report. On September 20, 2004, the Planning Commission determined
that no substantial changes had occurred with respect to the circumstances under which MEIR No.
313 was certified, and that there was no new available material information which was not known
and could not have been known at the time MEIR No. 313 was certified, thereby validating MEIR
No. 313 and the associated Mitigation Monitoring Program No. 0085 for continued use as the
environmental documentation required by CEQA for projects within the ARSP.
ARSP Amendment No. 6. On February 8, 2005, the City Council approved Amendment No. 6 to
the ARSP in connection with a zone change (Reclassification No. 2004-00135) to remove the
Mobile Home Park (MHP) Overlay from a property within the ARSP and Conditional Use Permit
No. 2004-04922. Amendment No. 6 modified Chapter 18.116 (Anaheim Resort Specific Plan 92-2
(SP92-2) Zoning and Development Standards) to permit the relocation of an existing service station
facility with frontage on Harbor Boulevard to a location not fronting Harbor Boulevard, allowed
accessory convenience markets to sell beer and wine for off -premise consumption, as an
accessory use to service stations, and prohibited tow truck operations in conjunction with service
station facilities. These actions were approved by Ordinance Nos. 5954 and 5955, including a
finding that the previously -certified MEIR No. 313 and Mitigation Monitoring Program No. 067
incorporating measures from Mitigation Monitoring Program No. 0085 were adequate to serve as
required environmental documentation for this request.
ARSP Adiustmen_t No. 5. On August 22, 2006, the City Council approved Adjustment No. 5 to the
ARSP to amend Chapter 18.116 (Anaheim Resort Specific Plan 92-2 (SP92-2) Zoning and
Development Standards) in its entirety to provide consistent formatting with Title 18 (Zoning Code)
along with minor modifications and clarifications. The City Council approved this action by adopting
Ordinance No. 6031 on August 22, 2006. The Planning Commission determined, on July 10, 2006
that the Previously -Certified Environmental Impact Report No. 330 was adequate to serve as
required environmental documentation for this request.
ARSP Amendment No. 7. On September 12, 2006, the City Council approved Amendment No. 7
to the ARSP in connection with an amendment to the Land Use Element of the City's General Plan
to amend Chapter 18.116 pertaining to the establishment of an ARR (Anaheim Resort Residential)
Overlay to provide the opportunity to develop residential units in conjunction with high -quality,
luxury hotels within two targeted areas by Resolution No. 2006-205 and 2006-206 adopted on
August 22, 2006 and by Ordinance No. 6036 adopted on September 12, 2006. Prior to approving
Amendment No. 7, the City Council, by motion, on August 22, 2006, determined that the Anaheim
Resort Residential Overlay Initial Study/Mitigated Negative Declaration and Modified Mitigation
Monitoring Program No. 0085b were adequate to serve as the required environmental
documentation for this request.
A-3
The Anaheim Resort Specific Plan Appendix A
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
ARSP Amendment No. 8. On May 8, 2007, the City Council approved Amendment No. 8 to the
ARSP in connection with an amendment to the Land Use Element of the City's General Plan to
amend Chapter 18.116 pertaining to development criteria for wholly -residential development within
the ARR Overlay on a designated 26.7-acre site within the ARSP Zone by Resolution No. 2007-
052 and 2007-053 adopted on April 24, 2007 and by Ordinance No. 6058 adopted on May 8, 2007.
Prior to approving Amendment No. 8, the City Council, by Resolution No. 2007-052, determined
that an Addendum (dated May 23, 2006) to the previously approved Mitigated Negative Declaration
for Amendment No.7 was adequate to serve as the required environmental documentation for this
request.
ARSP Amendment No. 9. On March 4, 2008, the City Council approved Amendment No. 9 to the
ARSP to repeal modifications to the Zoning and Development Standards, previously approved by
Amendment No. 8 to the ARSP, and an amendment to the Land Use Element of the City's General
Plan. Amendment No. 9 removed provisions in Chapter 18.116 (Anaheim Resort Specific Plan 92-
2 (SP92-2) Zoning and Development Standards) related to wholly -residential development, with
the exception of residential uses in certain targeted areas when such uses are fully integrated into
a minimum 300-room full service hotel (as approved by Amendment No. 7). The City Council took
these actions by adopting Resolution Nos. 2007-224, 2077-225, 2007-226, 2007-227 adopted on
November 27, 2007, and by adopting Ordinance No. 6099 on March 4, 2008. Under Resolution
No. 2008-016, the City Council found that the City's Actions, either individually or collectively, did
not constitute a "project" under Public Resources Code Sections 21065 and 21080, and
alternatively, (2) even assuming the City Actions could be deemed a "project," that the City Actions,
individually and collectively, were exempt from the requirements of CEQA under State CEQA
Guideline Section 15061(b)(3).
ARSP Amendment No. 10. [Withdrawn by the applicant.]
ARSP Amendment No. 11. On March 4, 2008, the City Council approved Amendment No. 11 to
the ARSP, an initiative measure ("SOAR") pursuant to the provisions of Section 1303 of the
Anaheim City Charter and Section 9214 of the Elections Code of the State of California, to generally
prohibit residential development within The Anaheim Resort unless such a project included
environmental and economic analysis, City Council approval, and voter approval at a City election
by adopting Ordinance No. 6098. Prior to introducing Ordinance No. 6098, the City Council, by
Resolution No. 2008-016, on February 26, 2008, determined that the amendment did not constitute
a "Project" subject to, and within the meaning of, the California Environmental Quality Act ("CEQA"),
and that said proposed action is exempt from CEQA, and that no further environmental review was
therefore required.
ARSP Amendment No. 12. On October 14, 2008, the City Council approved Amendment No. 12
to the ARSP to redesignate a 5.9-acre, "L"-shaped property at Ball Road and Walnut Street from
Low -Density to Medium Density to develop a 120-room hotel in connection with a Variance, Final
Site Plan and Tentative Parcel Map. The City Council approved these requests by adopting
Resolution Nos. 2008-168, 2008-169, and 2008-170 on September 30, 2008, and by adopting
Ordinance No. 6117 on October 14, 2008. Prior to approving Amendment No. 12, the City Council,
by motion, on September 30, 2008, determined that a Mitigated Negative Declaration and the
A-4
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
Appendix A
associated Mitigation Monitoring Program No. 000003 was adequate for the required
environmental documentation for this request.
ARSP Amendment No. 13. On April 14, 2009, the City Council approved Amendment No. 13 to
the ARSP, an amendment to the Anaheim Resort Public Realm Landscape Program, a Conditional
Use Permit, a Variance, a Determination of Public Convienence and Necessity, and a Final Site
Plan to construct a 252-room hotel with supporting accessory uses. These amendments modified
the text in the General Plan Land Use Element and the ARSP to reflect a new density category
called "Low Medium Density (Modified)"; modified the Central Core and Special Intersection
Landscape Treatment exhibits to allow special landscape and hardscape treatments at the corner
of Harbor Boulevard and Katella Avenue; allowed a greater number and larger signs than currently
permitted for hotels and accessory retail; allowed changeable copy signs for hotels when not visible
from any public right-of-way, murals and building integrated multi -tenant signs subject to approval
of a Conditional Use Permit. The City Council approved these requests by adopting Resolution
Nos. 2009-053, 2009-054, 2009-055, 2009-056, 2009-057, 2009-058 and 2009-059 adopted on
March 31, 2009, and by adopting Ordinance No. 6141 on April 14, 2009. Prior to approving
Amendment No. 13, the City Council, by motion, on March 31, 2009, determined that a Mitigated
Negative Declaration and Mitigated Monitoring Program No. 156 were adequate to serve as the
required environmental documentation for the request.
ARSP Adiustment No. 6. On June 5, 2012, the City Council approved Adjustment No. 6 to the
ARSP to amend Chapter 18.116 (Anaheim Resort Specific Plan 92-2 (SP92-2) Zoning and
Development Standards) to modify the Code references and terminology for various uses to be
consistent with Chapters 18.16 (Regulatory Permits) and 18.92 (Definitions) of Title 18 (Zoning
Code). The City Council approved this action by adopting Ordinance No. 6245 on June 5, 2012.
The Planning Commission determined, by motion, on March 26, 2012 that this action was exempt
from the California Environmental Quality Act under Section 21080 of the Public Resources Code.
ARSP Amendment No. 14. On December 18, 2012, the City Council approved Amendment No.
14 to the ARSP, in connection with an amendment to the Land Use Element of the City's General
Plan, to update the ARSP to reflect current development conditions and regulations and increase
the maximum allowable square footage in the Public Recreational (PR) District to accommodate
the future expansion of the Anaheim Convention Center. These actions were in conjunction with
amendments to The Anaheim Resort Identity Program and The Anaheim Resort Public Realm
Landscape Program. The City Council approved these requests by adopting Resolution Nos. 2012-
158, 2012-159, 2012-160, 2012-161 and 2012-162 adopted on December 18, 2012, and by
Ordinance No. 6265 adopted on January 15, 2013. Subsequently, City Council adopted Ordinance
No. 6266 on January 29, 2013 pertaining to Specific Plan conditions of approval. Prior to approving
Amendment No. 14, the City Council, by Resolution No. 2012-158, on December 18, 2012, certified
Final Supplemental Environmental Impact Report No. 2008-00340 ("FSEIR No. 340"), adopting
Findings and a Statement of Overriding Considerations, adopting Mitigation Monitoring Program
85C, and a Water Supply Assessment to serve as the required environmental documentation for
this request.
ARSP Adiustment No. 7. On March 3, 2015, the City Council approved Adjustment No. 7 to the
ARSP to amend Chapter 18.116, Table 116-C (Primary Uses and Structures: C-R District
A-5
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
Appendix A
(Development Area 1) of Section 18.116.070 (Uses — Commercial Recreation (C-R) District
(Development Area 1)) to prohibit "Computer Internet and Amusement Facilities," in conjunction
with a City-wide prohibition by Ordinance No. 6317. The Planning Commission determined, by
motion, on January 12, 2015 that this action was not subject to the California Environmental Quality
Act pursuant to Sections 15060(C)(2) and 15060(C)(3) of the State CEQA Guidelines.
ARSP Adjustment No. 8_ On October 18, 2016, the City Council approved Adjustment No. 8 to
the ARSP to amend Chapter 18.116.030 (Definitions) to include a definition for "Concierge Lounge,"
Table 116-C (Primary Uses and Structures: C-R District (Development Area 1), Table 116-D
(Accessory Uses and Structures Integrated With a Permitted Primary Use: C-R District
(Development Area 1)) and Table 116-E (Accessory Uses Incidental to and Integrated Within a
Hotel or Motel Including Suite -Type Hotels, and Otherwise Limited Herein: C-R District
(Development Area 1)) of Section 18.116.070 (Uses — Commercial Recreation (C-R) District
(Development Area 1)) of Chapter 18.116 (Anaheim Resort Specific Plan No. 92-2 (SP 92-2)
Zoning and Development Standards) of Title 18 (Zoning) to include (1) "Concierge Lounges" as a
permitted accessory use; (2) "Alcoholic Beverage Manufacturing" as a permitted and conditionally
permitted use subject to the requirements of Section 18.38.025; and (3) "Transitional and
Supportive Housing" as a prohibited use in conjunction with a City-wide Zoning Code Update by
Ordinance No. 6382. The Planning Commission determined, by motion, on August 8, 2016 that this
action was not subject to the California Environmental Quality Act pursuant to Section 15060(C)(2)
of the State CEQA Guidelines.
ARSP Adiustment No. 9. On April 10, 2018, the City Council approved Adjustment No. 9 to the
ARSP to amend Table 116-D (Accessory Uses and Structures Integrated with a Permitted Primary
Use: C-R District (Development Area 1)) to permit Valet Parking as an accessory use, subject to
approval of a minor conditional use permit in conjunction with a City-wide Zoning Code Update by
Ordinance No. 6432. The Planning Commission determined, by motion, on February 5, 2018, that
the request was exempt from further environmental review under the California Environmental
Quality Act Guidelines Section 15061 (b)(3).
ARSP Amendment No. 15.On August 14, 2018, the City Council approved Amendment No. 15 to
the ARSP in connection with an amendment to the Land Use Element of the City's General Plan,
a Variance, a Final Site Plan, a Minor Conditional Use Permit, and an Administrative Adjustment.
These amendments created a new density category called "Medium Density (Modified)" in the
Commercial Recreation (C-R) District to allow up to 345 hotel rooms or its equivalent at 1411 and
1441 South Manchester to accommodate development of a 223-room hotel with 1,516 square feet
of accessory retail space and 975 square feet of meeting space on the 2.5-acre site. The City
Council approved Resolution No. 2018-104 on July 31, 2018 and adopted Ordinance No. 6443 on
August 14, 2018. The City Council determined that a Mitigated Negative Declaration and Mitigated
Monitoring Program No. 350 were adequate to serve as the required environmental documentation
for the request.
SEIR No. 340 First Validation Report. On April 1, 2019, the Planning Commission determined
that no substantial changes had occurred with respect to the circumstances under which SEIR No.
340 was certified, and that there was no new available material information which was not known
and could not have been known at the time SEIR No. 340 was certified, thereby validating SEIR
A-6
The Anaheim Resort Specific Plan
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
Appendix A
No. 340 and the associated Mitigation Monitoring Program No. 85C for continued use as the
environmental documentation required by CEQA for projects within the ARSP.
ARSP Adjustment No. 10. On December 3, 2019, the City Council approved Adjustment No. 10
to assign review authority of Final Site Plans in the Anaheim Resort Specific Plan to the Planning
Director; to allow Day Care Centers as a primary use, subject to approval of a Conditional Use
Permit; and consolidate Boat & RV Sales with Automotive — Vehicle Sales, Lease, and Rentals in
conjunction with a City-wide Zoning Code Update by Ordinance No. 6473. The City Council
determined that the request was exempt from further environmental review under the California
Environmental Quality Act Guidelines Section 15061 (b)(3).
ARSP Amendment No. 16. On September 29, 2020, the City Council approved Amendment No.
16 to the ARSP, in conjunction with a General Plan Amendment, a Minor Conditional Use Permit,
a Variance, a Final Site Plan, and an Administrative Adjustment to create a new density category
"Medium Density (Modified A)" in the Commercial Recreation (C-R) District, to allow construction
of a 125-room hotel with accessory uses at 1730 South Clementine Street. The City Council
approved the request by adopting Resolution No. 2020-112, 2020-113, and 2020-114 on
September 15, 2020, and by adopting Ordinance No. 6494 on September 29, 2020. Prior to
introducing Ordinance No. 6494, the City Council adopted Resolution No. 2020-112, determining
that a Mitigated Negative Declaration and Mitigation Monitoring Program No. 372 were adequate
to serve as the required environmental documentation for the request.
ARSP Adjustment No. 11.On September 29, 2020, the City Council approved Adjustment No. 11
to the ARSP to provide standards and regulations for unlicensed community care facilities and
sober living facilities that are not operating as a single housekeeping unit. The City Council adopted
Ordinance No. 6493 on September 29, 2020, and determined that the request was exempt from
further environmental review per California Environmental Quality Act Guidelines Sections
15060(c)(2) and 15060(c)(3).
ARSP Adiustment No. 12. On February 9, 2021, the City Council approved Adjustment No. 12 to
the ARSP as part of a comprehensive Zoning Code update, which included amendments to the
ARSP regulations to prohibit dual -lit signs and allow the encroachment of outdoor dining in required
street setbacks. The City Council adopted Ordinance No. 6506 on February 9, 2021, and
determined that the request was exempt from further environmental review per California
Environmental Quality Act Guidelines Section 15061(b)(3).
ARSP Adjustment No. 13. On April 4, 2023, the City Council approved Adjustment No. 13 to the
ARSP as part of a comprehensive Zoning Code update, which clarified the maximum height of six
feet for the transparent portion of outdoor dining enclosures within the street setback for properties
within the ARSP. The City Council adopted Ordinance No. 6555 on April 4, 2023, and determined
that the request was exempt from further environmental review per California Environmental Quality
Act Guidelines Section 15061(b)(3).
ARSP Amendment No. 17. On [date], the City Council approved ARSP Amendment No. 17
(Disneyland Forward), an update to The Disneyland Resort Project to allow for the transfer of uses
permitted under the Specific Plan to other areas of the Disneyland Resort Specific Plan and
A-7
The Anaheim Resort Specific Plan Appendix A
PLANNING COMMISSION PUBLIC REVIEW DRAFT (MARCH 2O24)
properties within the Specific Plan owned or leased by Walt Disney Parks and Resorts U.S., Inc.
or other subsidiaries of The Walt Disney Company (Disney). ARSP Amendment No. 17 also
provided for future administrative review by the City of Disney's development projects on Disney
property within the Specific Plan and the Disneyland Resort Specific Plan. Disneyland Forward did
not increase previously approved square footage or hotel rooms in the Disneyland Resort Specific
Plan or the Specific Plan, however, it increased the number of theme park -related parking spaces
in the Anaheim Resort Specific Plan Parking Overlay by 4,376 spaces. ARSP Amendment No. 17
and its associated actions were approved by [insert] and adopted on [date]. The City Council
certified Final Subsequent Environmental Impact Report (SEIR) No. 352 on [date]. In serving as
the CEQA compliance document for Disneyland Forward, SEIR No. 352 provided the environmental
analysis required for the addition of theme park uses in the ARSP Theme Park East and ARSP
Theme Park West Overlays and the additional of parking uses in the ARSP Parking Overlays.
A-8
EXHIBIT "D"
"MITIGATION MONITORING PROGRAM (MMP) NO.387"
[Behind this sheet.]
(DEV2021-00069)
EXHIBIT D
DisneylandFonaard
Final Subseauent EIR No. 352
SECTION 4.0 MITIGATION MONITORING PROGRAM
MITIGATION MONITORING PROGRAM (MMP) NO.000387 (INCLUDING PROJECT DESIGN
FEATURES) FOR THE DISNEYLAND RESORT PROJECT AS AMENDED BY
THE DISNEYLANDFORWARD PROJECT
CEQA Action I Subsequent Environmental Impact Report No. 352 (Resolution No. ) I
Project Description I General Plan Amendment, Specific Plan No. 92-1 Amendment No. 9, and Specific Plan No. 92-2 Amendment No. 17
Applicant I Walt Disney Parks and Resorts U.S., Inc., 500 South Buena Vista Street, Burbank, California,
Project Location The Project site is located approximately 35 miles southeast of downtown Los Angeles and seven miles northwest of Santa Ana, in central Orange
County, California, and is generally located adjacent to and southwest of the Interstate 5 (1-5), between Ball Road to the north, Walnut Street to the
west, and Chapman Avenue to the south. The Project site encompasses The Disneyland Resort, including the Theme Park, Parking and Southeast
Districts of the Disneyland Resort Specific Plan (DRSP), and properties in the Anaheim Resort Specific Plan (ARSP) Commercial Recreation (C-R)
District (Development Area 1) owned or controlled by Walt Disney Parks and Resorts U.S., Inc. (Disney) or other subsidiaries of The Walt Disney
Terms and Definitions
1. Applicant -Walt Disney Parks and Resorts U.S., Inc.
2. Property Owner/Developer — Any owner or developer of properties owned by Disney or other subsidiaries of The Walt Disney Company within the DRSP or the
ARSP.
3. Project Design Features (PDFs) — Measures incorporated into The Disneyland Resort Project as amended by the Disneyland Forward Project by the applicant
with the intent of minimizing potential environmental impacts. The PDFs included in this Mitigation Monitoring Program will be implemented as mitigation
measures.
4. Environmental Equivalent/Timing — To the extent permitted by law, if Disney cannot complete any PDF or Mitigation Measure and timing thereof, the City
may specify another substituted measure, which (i) will have the same or superior result, (ii) will have the same or superior effect on the environment, and (iii)
has a nexus to the Project. The Planning Department, in conjunction with any appropriate agencies or City departments, shall determine the adequacy of
any proposed "environmental equivalent/timing" based on substantial evidence and, if determined necessary, may refer said determination to the Planning
Commission. Any costs associated with information required to make a determination of environmental equivalency/timing shall be borne by the Applicant.
5. Responsibility for Monitoring — Shall mean that compliance with the subject mitigation measure(s) shall be reviewed and determined adequate by all
departments listed for each mitigation measure.
6. Ongoing Mitigation Measures —The mitigation measures that are designated to occur on an ongoing basis as part of this mitigation monitoring program will
be monitored in the form of an annual letter from the Property Owner/Developer and/or Applicant in January of each year stating how compliance with the
R:1Projects%WD113WD1000400kEnvimnmentaI DocumentationTinal SEIRT1na1_SEIR-022824.do 4-1
DisneylandForward
Final Subsequent EIR No. 352
subject measure(s) has been achieved. Mitigation Measures are referenced in parentheses by their section number as identified in the Draft Subsequent EIR
No. 352. Mitigation Measures and/or PDFs designated to occur on an ongoing basis are noted with an asterisk (*). For mitigation measures/PDFs that are
to be monitored "Ongoing During Construction", the annual letter will review those mitigation measures/PDFs only while construction is occurring; monitoring
will be discontinued after construction is complete. A final annual letter will be provided at the close of construction.
7. The City recognizes that the certain infrastructure improvements and service capabilities, as identified in this Mitigation Monitoring Program, will serve not
only the Applicant but also other property owners/developers in the Specific Plan area, The Anaheim Resort, and the service area, each of which should
contribute in allocable share of the cost of these improvements. To implement this requirement as it applies to other property owners/developers in the Specific
Plan area, The Anaheim Resort, and the service area, the City shall make appropriate arrangements with other public agencies, if any, to reimburse the
Applicant to the extent that its contributions for these improvements exceed the Applicant's allocable share of the cost. Such arrangements shall include one
or more of the following: (1) creation of integrated financing districts; (2) entry into a reimbursement agreement with the Applicant; (3) creation of appropriate
community facilities districts, assessment districts and/or use of similar public financing districts and/or mechanisms; and (4) creation of such other
mechanisms or districts as may be appropriate to provide for the reimbursement of these costs. The determination of the allocable share of improvement
costs attributable to the Applicant and other property owners/developers, and reimbursement amounts, shall be based on an apportionment of the costs of
such improvements and equipment and personnel among property owners/developers, including the Applicant, in the Specific Plan area, The Anaheim Resort,
or otherwise defined service area, as applicable, depending on the area served.
8. To the extent that this Mitigation Monitoring Program requires the Applicant to submit plans for several phases simultaneously, it is understood that such later
phase plans may be considered preliminary and may be subject to change. Such preliminary plans for the later phase will not be required to provide the level
of detail required for the initial phase plans provided that more detailed plans will be submitted separately at a later time. Nevertheless, such preliminary plans
for the later phase shall provide sufficient schematic or descriptive detail to ensure that plans submitted for said later phase shall comply with the provisions
of this Mitigation Monitoring Program and shall be consistent with the provisions of the initial phase plans.
9. Timing — This is the point where a mitigation measure/PDF must be monitored for compliance. In the case where multiple action items are indicated, it is the
first point where compliance associated with the mitigation measure/PDF must be monitored. Once the initial action item has been complied with, no additional
monitoring pursuant to the Mitigation Monitoring Program will occur, as routine City practices and procedures will ensure that the intent of the measure design
feature has been complied with. For example, if the timing is "to be shown on approved building plans" subsequent to issuance of the building permit consistent
with the approved plans will be final building and zoning inspections pursuant to the building permit to ensure compliance.
10. Building Permit — For purposes of this Mitigation Monitoring Program, a building permit shall be defined as any permit issued for construction of a new
building or structural expansion/modification of any existing building, but shall not include any permits required for interior tenant improvements or minor
additions of up to 1,000 square feet to an existing structure or building.
R:1Projects1WD113WD10004001Environmental DawmentationTinal SEIRTinal SEIR-022824.dom 4-2
DisneylandForward
Final Subsequent E!R No. 352
Mitigation
Measure/Project Responsible for
Timing Measure Completion
Design Feature Monitoring
Number
Aesthetics
MM AES-1
Prior to issuance of each
The property owner/developer shall submit plans which illustrate that all mechanical
Planning & Building
building permit; to be
equipment and trash areas for the subject buildings will be screened from adjacent
Department, Planning
implemented prior to final
public streets and adjacent residential areas.
Services Division
building and zoning
inspections
MM AES-2
Prior to final building and
Private streets within the Anaheim Resort Specific Plan area shall have street lights
Planning & Building
zoning inspections
installed which are compatible with the design standards used for the public streets as
Department, Planning
determined by the Public Utilities Department.
Services Division;
Public Utilities
Department
MM AES-3
Prior to issuance of each
The property owner/developer shall submit plans which detail the lighting system for
Planning & Building
building permit for each
the parking facilities along Walnut Street, Ball Road, Haster Street and along interior
Department, Planning
parking facility along
property lines abutting residential neighborhoods. The systems shall be designed and
Services Division
Walnut Street; to be
maintained in such a manner as to conceal light sources to the extent feasible to
implemented prior to each
minimize light spillage and glare to the adjacent uses. The plans shall be prepared and
final building and zoning
signed by a licensed electrical engineer, with a letter from the engineer stating that, in
inspection
the opinion of the engineer, this requirement has been met.
MM AES-4
Prior to final building and
The property owner/developer shall participate in a landscape assessment and
Planning and Building
zoning inspection or
maintenance district for the Anaheim Resort.
Department, Planning
whenever established; and
Services Division
on an ongoing basis
Utilities Department,
Resource Efficiency
Section
MM AES-5
Prior to approval of each
A Construction Barrier Plan showing the location and types of barriers shall be in place
Public Works
grading plan or issuance of
during grading and construction. Said plan shall provide for all construction areas to
Department, Traffic
each demolition or building
be screened from view in compliance with the City of Anaheim Municipal Code and
and Transportation
permits, whichever occurs
shall include provision for the type and height of the barriers to be placed along all
Division; Planning &
first
construction perimeters prior to the commencement of demolition, Site preparation or
Building Department,
grading, whichever occurs first.
Planning Services
Division
R,%Projects1WD113WDI000400\Environmental DocumentationWinal SEIR%Final_SEIR-022824.docx 4-3
DisneylandForward
Final Subsequent EIR No. 352
Mitigation
Measure/Project
Design Feature
Timing
Measure
Responsible for
Monitoring
Completion
Number
MM AES-6
Prior to issuance of each
The proposed Specific Plan incorporates design guidelines as well as zoning and
Planning & Building
building permit
development standards, many of which have been designed to reduce the potential
Department, Planning
visual impacts of the project and to present a visually integrated resort area, including:
Services Division
• The Disneyland Resort Specific Plan provides for heavily landscaped
streetscapes and gives the guidelines for trees and shrubs, light fixtures, benches,
monuments, and signs located within the landscaped area.
• The East and West Parking Areas and the hotel parking facilities will have
landscaped setbacks from the public right-of-way and are restricted in height.
• Rights -of -way will be landscaped to add to the aesthetics of the area.
• The landscape treatments will vary to create distinct places visually.
• The West Parking Area and hotel parking facilities will be terraced back from
Walnut Street with landscaping treatments above 40 feet. In addition, canopy
trees will be planted in a center median on Walnut Street, and the parkway along
the street will be landscaped.
• A coordinated color theme for major street features will be incorporated into the
design.
• The service areas and back -of -house areas will be screened from public view.
• All rooftop equipment on buildings will be screened as per the Specific Plan.
• A layered landscape treatment in the setback realm will provide screening of a
9-14 feet in height sound wall adjacent to the Southwest Parking Area.
MM AES-7
Prior to issuance of building
All plumbing or other similar pipes and fixtures located on the exterior of the building
Planning & Building
permits
shall be shown on plans as fully screened from view of adjacent public rights -of -way
Department, Planning
and from adjacent properties by architectural devices and/or appropriate building
Services Division
materials. A note indicating that these improvements will be installed prior to final
building and zoning inspections shall be specifically shown on the plans submitted for
building permits.
MM AES-8
Prior to issuance of each
All air conditioning facilities and other roof and ground -mounted equipment shall be
Planning & Building
building permit
shown on plans as shielded from public view and the sound buffered to comply with
Department, Building
City of Anaheim noise ordinances from any adjacent residential or transient -occupied
Division
properties. A note indicating that these improvements shall be installed prior to final
building and zoning inspections shall be specifically shown on the plans submitted for
building permits.
R15rojects1WDI13WD10004001Environmental DocumentationWinal SEIRTinal_SEIR-022824.docx 4-4
DisneylandForward
Final Subsequent E!R No. 352
Mitigation
Measure/Project
Design Feature
Timing
Measure
Responsible for
Monitoring
Completion
Number
MM AES-9
Prior to issuance of each
Plans shall show compliance with the 360-Degree Architectural Treatment Criteria set
building permit for theme
forth in the Disneyland Resort Specific Plan and the Anaheim Resort Specific Plan.
Planning & Building
park uses within the Theme
Department, Planning
Park District, the Southeast
Services Division
District, and the ARSP
Theme Park Overlays
MM AES-10
Prior to issuance of each
Plans shall show that no shuttle/bus/vehicular drop-off areas shall be permitted in hotel
Planning & Building
building permit
or vacation ownership resort front setback area.
Department, Planning
Services Division
MM AES-11
Ongoing
The property owner/developer shall be responsible for the removal of any on -site
Planning & Building
graffiti within 24 hours of its application.
Department, Code
Root and sidewalk barriers shall be provided for trees within seven feet of public
Enforcement Division
MM AES-12
Prior to final building and
Planning & Building
zoning inspections
sidewalks.
Department, Planning
Services Division;
Public Works
Department,
Development Services
Division
NM AES-13
Prior to final building and
The property owner/developer shall submit to the Planning and Building Department
Planning & Building
zoning inspections
a letter from a licensed landscape architect certifying that all landscaping and irrigation
Department, Planning
systems have been installed in accordance with landscaping plans approved in
Services Division
connection with the building permit.
MM AES-14
Ongoing
All on -site non -Public Realm landscaping and irrigation systems, and Public Realm
Planning & Building
landscaping and irrigation systems, within an area in which dedication has not been
Department, Planning
accepted by the City, shall be maintained by the property owner/developer, in
Services Division;
compliance with City standards.
MM AES-15
Ongoing
Any tree planted within the Setback Realm shall be replaced in a timely manner in the
Planning & Building
event that it is removed, damaged, diseased and/or dead.
Department, Planning
Services Division
MM AES-16
Ongoing
A licensed arborist shall be hired by the property owner/developer to be responsible
Planning & Building
for all tree trimming.
Department, Planning
Services Division
R:1ProjectskWD113WD10004001Environmentol DocumentationlFinal SEIR%Final SEIR-022824.docx 4-55
DisneylandForward
Final Subsequent EIR No. 352
Mitigation
Measure/Project
Timing
Measure
Responsible for
Completion
Design Feature
Monitoring
Number
Public Works
MM AES-17
Prior to issuance of each
The property owner/developer shall pay a fee for street tree purposes to the City of
building permits, unless
Anaheim based on the length of street frontage in an amount as established by City
Department,
records indicate previous
Council resolution or credit against the fee given for City authorized improvements
Development Services
payment
installed by the property owner/developer.
Division
MM AES-18
Prior to issuance of each
The property owner/developer shall submit a shade and shadow analysis to the
Planning & Building
building permit
Planning and Building Department for review and approval demonstrating that the
Department, Planning
proposed structure(s) would avoid creating significant shade and shadow impacts on
Services Division
adjacent land uses to the maximum extent feasible. A significant shade and shadow
impact would occur when outdoor active areas (e.g., outdoor eating areas, hotel/motel
swimming pools, and residential front and back yards) or structures that include
sensitive uses (e.g., residences) have windows that normally receive sunlight are
covered by shadows for more than 50 percent of the sunlight hours.
MM AES-19
Prior to issuance of each
The location and configuration of all lighting fixtures including ground -mounted
Planning & Building
building permit
lighting fixtures utilized to accent buildings, landscape elements, or to illuminate
Department, Planning
pedestrian areas shall be shown on all plans submitted for building permits. All
Services Division
proposed surface parking area lighting fixtures shall be down -lighted with a maximum
height of 12 feet adjacent to any residential properties. All lighting fixtures shall be
shielded to direct lighting toward the area to be illuminated and away from adjacent
residential property lines.
Air Quality
MM AQ-1
Prior to final building and
The property owner/developer shall comply with all SCAQMD offset regulations and
Planning & Building
zoning inspection
implementation of Best Available Control Technology (BACT) and Best Available
Department, Planning
Retrofit Control Technology (BARCT) for any new or modified stationary sources.
Services Division
Copies of permits shall be given to the Planning Department.
MM AQ-2
Ongoing during operation of
The property owner/developer shall implement the following measures to reduce
Planning & Building
The Disneyland Resort
emissions:
Department, Planning
a. To the extent practicable, schedule goods movements for off-peak traffic hours.
Services Division;
Public Works
b. Use clean fuel for attraction rides and other uses, as practicable.
Department, Traffic
and Transportation
Division; Utilities
Department, Resource
Efficiency Section
R:1Projects%WDI10WD10004001Envimnmental Documentation\Final SEIRIFinal_SEIR-022824.dom 4-6
DisneylandForward
Final Subsequent EIR No. 352
Mitigation
Measure/Project
Timing
Measure
Responsible for
Completion
Design Feature
Monitoring
Number
MM AQ-3
Prior to issuance of the first
The property owner/developer shall submit a site and operations plan for this facility
Planning & Building
building permit associated
showing the location and configuration of the on -site cast financial and dining services
Department, Planning
with a cumulative total of
in conformance with The Disneyland Resort Specific Plan.
Services Division
over 10,000 square feet of
theme park development in
The property owner/developer shall provide cast financial and dining services within
the Southeast District or
the Southeast District or Theme Park East Overlay and the Theme Park District to
Theme Park East Overlay,
accommodate cast members.
whichever occurs first
The property owner/developer shall continue to provide cast financial and dining
Prior to final building and
services in conformance with The Disneyland Resort Specific Plan.
zoning inspections
associated with a
cumulative total of over
10,000 square feet of theme
park development in the
Southeast District or Theme
Park East Overlay
Ongoing during project
operation
MM AQ-4
Ongoing during project
The following will be achieved: (1) the 1.5 AVR target for all cast and (2) the average
Public Works
operation
length of the out -of -area guest stay of 1.72 days, or a demonstration that the SCAG
Department, Traffic
VMT reduction targets have been met through other means.
and Transportation
Division; South Coast
Air Quality
Management District
Ongoing during
(SCAQMD)
MM AQ-5
The following measures will be followed by the property owner/developer to reduce
Planning & Building
construction
air quality impacts:
Department, Building
a. Normal wetting procedures (at least twice daily) or other dust palliative
Division; Public Works
Department,
measures shall be followed during earth -moving operations to minimize fugitive
Development Services
dust emissions, in compliance with the City of Anaheim Municipal Code
Division
including application of chemical soil stabilizers to exposed soils after grading
is completed and replacing ground cover in disturbed areas as quickly as
practicable.
R:1Projects%WD113WD10004001Environmental DocumentatiunTinal SEIRTinal_SEIR-022824.docx 4-7
DisneylandForward
Final Subsequent EIR No. 352
Mitigation
Measure/Project
Design Feature
Number
Timing
Measure
Responsible for
Monitoring
Completion
b. For projects where there is excavation for subterranean facilities (such as
parking) on -site haul roads shall be watered at least every two hours or the on -
site haul roads shall be paved.
c. Enclosing, covering, watering twice daily, or applying approved soil binders,
according to manufacturer's specification, to exposed piles.
d. Roadways adjacent to the project shall be swept and cleared of any spilled
export material at least twice a day to assist in minimizing fugitive dust; and
haul routes shall be cleared as needed if spills of material exported from the
project site occur.
e. Where practicable, heavy duty construction equipment shall be kept onsite when
not in operation to minimize exhaust emissions associated with vehicles
repetitiously entering and exiting the project site.
f. Trucks importing or exporting soil material and/or debris shall either be covered
prior to entering public streets or shall comply with the vehicle freeboard
requirements of Section 23114 of the California Vehicle Code for both public
and private roads. This California Vehicle Code section stipulates that the load,
where it contacts the sides, front and back of the cargo container area, remain
six inches from the upper edge of the container area, and that the load does not
extend, at its peak, above any part of the upper edge of the cargo container area.
g. Taking preventive measures to ensure that trucks do not carry dirt on tires onto
public streets, including treating onsite roads and staging areas.
h. Preventing trucks from idling for longer than 2 minutes.
i. Manually irrigate or activate irrigation systems necessary to water and maintain
the vegetation as soon as planting is completed.
j. Reduce traffic speeds on all unpaved road surfaces to 15 miles per hour or less.
k. Suspend all grading operations when wind speeds (as instantaneous gust)
exceed 25 miles per hour and during second stage smog alerts.
1. Comply with the SCAQMD Rule 402, which states that no dust impacts offsite
are sufficient to be called a nuisance, and SCAQMD Rule 403, which restricts
visible emissions from construction.
in. Use low emission mobile construction equipment (e.g., tractors, scrapers,
dozers, etc.) where practicable.
n. Utilize existing power sources (e.g., power poles) or clean -fuel generators rather
than temporary power generators, where practicable.
R:1ProjectslWDI13WD10004001Envimnmental DommentationTinel SEIRTinal_SEIR-022824.do 4-8
DisneylandForward
Final Subsequent EIR No. 352
Mitigation
Measure/Project
Timing
Measure
Responsible for
Completion
Design Feature
Monitoring
Number
o. Maintain construction equipment engines by keeping them properly tuned.
p. Use low sulfur fuel for equipment, to the extent practicable.
q. Should demolition, grading, or, excavation activities of two or more projects
within any portion of the Project site occur concurrently, air quality monitoring
shall be conducted each day that demolition and grading/excavation activities
occur concurrently; monitoring shall be conducted in accordance with
SCAQMD Rule 403 and ensure that PM2.5 and PM10 concentrations shall not
exceed the established regulatory limit of 50 micrograms per cubic meter.
MM AQ-6
Prior to issuance of each
The property owner/developer shall submit Demolition and Import/Export Plans. The
Public Works
grading permit (for
plans shall include identification of offsite locations for material export from the
Department, Traffic
Import/Export Plan) and
project and options for disposal of excess material. These options may include
and Transportation
prior to issuance of
recycling of materials onsite, sale to a soil broker or contractor, sale to a project in the
Division
demolition permit (for
vicinity or transport to an environmentally cleared landfill, with attempts made to move
Demolition Plan)
it within Orange County. The property owner/developer shall offer recyclable building
materials, such as asphalt or concrete for sale or removal by private firms or public
agencies for use in construction of other projects, if not all can be reused on the project
site.
MM AQ-7
Ongoing during
The property owner/developer shall implement the following to limit emissions from
Planning & Building
construction
architectural coatings and asphalt usage:
Department, Building
a. Use nonsolvent-based coatings on buildings, wherever appropriate.
Division
b. Use solvent -based coatings, where they are necessary, in ways that minimize
solvent emissions.
c. Encourage use of high -solid or water -based coatings.
_
MM AQ-8
Prior to issuance of building
All public day -use parking facilities, not including hotel, hotel accessory uses or cast
Public Works
permits for each of the east
parking facilities, will have a crew of cast members, based on parking predictions, on
Department, Traffic
and west public parking
each lot or facility level, to assist speed parking procedures. In addition, the East and
and Transportation
structures and any parking
West public parking structures and any parking structure in the Southeast District will
Division
structure in the Southeast
incorporate the following design features on each facility level, to assist speed parking
District; ongoing during
procedures:
project operation
1. Signage designed to enhance smooth traffic flows and reduce traffic flows on
each facility level.
2. Speed ramps which will take cars directly to the level that has available spaces,
thus eliminating circulation movement and time involved with hunting for a
space. The speed parking striping and procedures currently used at the
R.lProjeclslWDI13WD10004001Environmental DocumentationTinal SEIR%Fina1_SEIR-022824.dau 4-9
DisneylandFonaard
Final Subsequent EIR No. 352
Mitigation
Measure/Project
Timing
Measure
Responsible for
Completion
Design Feature
Monitoring
Number
Disneyland theme park parking lot will be adapted to use within the parking
structures and will be designed to safely park 60 cars per minute. (Refer to The
Disneyland Resort Specific Plan and the Anaheim Resort Specific Plan.)
3. Ceiling clearances and lateral clearances, an open well design, and enhanced
lighting levels will eliminate the enclosed feeling of a standard garage, which
tends to slow drivers.
MM AQ-9
Ongoing during project
The property owner/developer will implement a comprehensive and aggressive
Public Works
operation
Transportation Demand Management (TDM) program for all project employees.
Department, Traffic
and Transportation
Division
MM AQ-10
Prior to the issuance of each
The property owner/developer shall implement, and demonstrate to the City, that Planning & Building
building permit
project design will incorporate the following energy -saving features. This energy Department, Building
savings will also contribute to reduced operation -related air quality impacts. These Division and Planning
measures may include, but are not limited to the following: Services Division;
a. Improve thermal integrity of structures and reduced thermal load through use of
automated time clocks or occupant sensors.
b. Incorporate efficient heating and other appliances.
c. Incorporate energy conservation measures in site orientation and in building
design, such as appropriate passive solar design and proper sealing of buildings.
d. Use water -wise landscaping wherever feasible to reduce energy used in
pumping and transporting water.
e. To the extent feasible, provide daycare opportunities for employees or
participate in a joint development daycare center.
f. Install facilities for electric vehicle recharging, unless it is demonstrated that the
technology for these facilities or availability of the equipment current at the time
makes this installation infeasible.
MM AQ-11
Prior to issuance of each
The public parking facilities, which may be used for theme park guest parking, shall
Planning & Building
building permit for public
be designed in accordance with the speed parking procedures set forth The Disneyland
Department, Planning
day -use parking facilities
Resort Specific Plan and the Anaheim Resort Specific Plan which will assist in
Services Division
reducing vehicular fuel from idling engines.
R:1P ejectslWDI13WDI0004001Envimnmental DocumentationTinal SEIRTinal_SEIR-022824.d— 4-10
DisneylandFonvard
Final Subsequent E!R No. 352
Mitigation
Measure/Project
Timing
Measure
Responsible for
Completion
Design Feature
Monitoring
Number
MM AQ-12
Prior to issuance of the first
The property owner/developer shall submit a human health risk assessment (HRA) for
Planning & Building
building permit
any proposed sensitive land uses (according to SCAQMD standards at that time) to be
Department, Planning
located within 500 feet of the near edge of the I-5 freeway unless it is demonstrated
Services Division
that the health risks have been determined to be acceptable according to the standards
of the SCAQMD at the time of building permit application.
MM AQ-13
During construction
For all offroad engines that are diesel and above 50 brake horsepower, the contractor
Planning & Building
activities
shall use engines that comply with USEPA Tier 4 offroad engine standards.
Department, Building
Division; Public Works
Department,
I
Development Services
Division
MM AQ-14
Prior to issuance of a
If two or more dust -generating construction projects, which collectively will disturb 15
Planning & Building
grading permit
acres or more and which have demolition, excavation, or grading activity scheduled to
Department, Building
occur concurrently, a Localized Significance Threshold analysis shall be prepared. If
Division; Public Works
the LST analysis determines that the established Localized Significance Thresholds for
Department,
NOx, PM2.5, or PM10 would be exceeded, then modifications to construction
Development Services
equipment profiles, modifications to construction schedules, or additional pollution
Division
reduction measures shall be implemented.
PDF AQ-1
Ongoing during project
The project has been designed to reduce dependence on the private automobile, which
Planning & Building
operation
will reduce and avoid many of the traffic -related emissions associated with the existing
Department, Planning
Disneyland theme park and Disney California Adventure Park, as well as those
Services Division
normally associated with hotels and day -use only special event activities and those
associated with development of theme park uses in the Southeast District or Theme
Park East Overlay. Guests will be encouraged to park their cars and leave them for the
duration of their visits, thus eliminating the trips to restaurants and sightseeing, or
entertainment attractions normally associated with vacation stays. Marketing efforts in
Southern California will promote the Disneyland Resort as a mini -vacation site for
Southland residents.
PDF AQ-2
Ongoing during project
A wide range of entertainment, lodging, retail and restaurant attractions will be located
Planning & Building
operations
within the project area and will be linked by an electrically powered monorail system,
Department, Planning
pedestrian ways/guest transportation system to transport visitors from parking facilities
Services Division
to The Disneyland Resort, and/or pedestrian bridges, walkways and promenades.
Convenient walkway access within the Theme Park District, the Southeast District and
the Theme Park East Overlay and adjacent uses, such as the City of Anaheim
Convention Center, will also facilitate pedestrian trips by non -project guests who will
R:1Projects\WDI13WD10004001Environmental DocumentaticnTinal SEIR%Final_8EIR-022824.docx 4-1 t
DisneylandForward
Final Subsequent E1R No. 352
Mitigation
Measure/Project
Timing
Measure
Responsible for
Completion
Design Feature
Monitoring
Number
remain within the project area rather than use automobiles to travel to restaurants and
entertainment outside of the area.
PDF AQ-3
Ongoing during project
In accordance with transportation and circulation mitigation measures, The Disneyland
Planning & Building
operations
Resort traffic will be accommodated, and existing traffic conditions and circulation
Department, Planning
patterns will be improved through implementation of the identified transportation and
Services Division;
parking features, including parking facilities, monorail and pedestrian way/guest
Public Works
transportation systems and convenient access to parking facilities from the freeway.
Department, Traffic
and Transportation
_
Division
PDF AQ-4
Prior to issuance of building
The Disneyland Resort Project will include a special drop-off area on Harbor
Planning & Building
permits for the East Parking
Boulevard north of Disney Way, or internal or adjacent to the East Parking Area
Department, Planning
Facility and ongoing during
Parking Structure and/or adjacent ARSP Parking Overlay, or other accessible location,
Services Division;
project operations
for shuttle buses to help encourage use of buses by area visitors.
Public Works
Department, Traffic
and Transportation
Division
SR AQ-1
Prior to issuance of the first
The property owner/developer shall provide written evidence of compliance to the
Planning & Building
grading or building permit,
Planning & Building Director or their designee that all construction activities shall
Department, Building
whichever occurs first
comply with SCAQNID Rules 402 and 403, which shall assist in reducing short term
Division; Public Works
air pollutant emissions. SCAQMD Rule 402 requires that air pollutant emissions not
Department,
be a nuisance off site. SCAQMD Rule 403 (Tables 1, 2, and 3 of Rule 403) requires
Development Services
that fugitive dust be controlled with the best available control measures so that the
Division
presence of such dust does not remain visible in the atmosphere beyond the property
line of the emission source. This requirement shall be included as notes on the
contractor specifications.
SR AQ-2
Prior to issuance of building
The property owner/developer shall submit evidence that low emission paints and
Planning & Building
permits
coatings are utilized in the design and construction of all buildings in compliance with
Department, Building
SCAQMD regulations, including SCAQNID Rule 1113. This information shall be
Division
denoted on the project plans and specifications. The property owner/developer shall
also submit an architectural coating schedule and calculations demonstrating that VOC
emissions from architectural coating operations would not exceed 75 pounds per day
averaged over biweekly periods. The calculations shall show, for each coating, the
surface area to be coated, gallons (or liters) of coating per unit surface area, and VOC
R:1Projects1WD113WO10004001Environmental DommentationlFinal SEIR1FInal_SEIR-022824.doa 4-12
DisneylandForward
Final Subsequent EIR No. 352
Mitigation
Measure/Project
Design Feature
TimingResponsible
Measure
for
Monitoring
Completion
Number
content per gallon (or liter). The property owner/developer shall also implement the
following to limit emissions from architectural coatings and asphalt usage:
a. Use nonsolvent-based coatings on buildings, wherever appropriate;
b. Use solvent based coatings, where they are necessary.
Biological Resources
MM BIO-1
Prior to the issuance of a
A letter detailing the proposed schedule for vegetation removal and building
Planning & Building
demolition permit, grading
demolition activities shall be submitted to the Planning and Building Department,
Department, Planning
permit, or building permit,
verifying that removal shall take place between August 1 and January 31 to avoid the
Services Division
whichever occurs first
bird nesting season. If this is not feasible, the property owner/developer shall
implement MM BIO-2.
MM BIO-2
Prior to the issuance of a
A pre -construction nesting bird survey of structures to be demolished and/or vegetation
Planning & Building
demolition permit, grading
to be removed shall be conducted by a qualified Biologist no more than three days prior
Department, Planning
permit or building permit,
to such work occurring. If the Biologist does not find any active nests within or
Services Division
whichever occurs first, and
immediately adjacent to the impact area, the vegetation clearing/construction work
if Project demolition and/or
shall be allowed to proceed. The pre -construction nesting bird survey shall be updated
vegetation clearing must
following any work stoppage of two weeks or longer.
occur during the bird
nesting season (February 1—
If an active nest of a bird species protected under California Fish and Game Code or
July 31)
the Migratory Bird Treaty Act is identified within or immediately adjacent to the
construction area, and the Biologist determines that the nest may be impacted or
breeding activities substantially disrupted, the Biologist shall delineate an appropriate
no -impact buffer zone (at a minimum of 25 feet) around the nest depending on the
sensitivity of the species and the nature of the construction activity. All nests and
associated buffers shall be mapped on the construction plans. The active nest shall be
protected until nesting activity has ended. The following restrictions to clearing and/or
construction activities shall be required until nest(s) are no longer active, as determined
by a qualified Biologist: (1) clearing limits shall be established within a buffer around
any occupied nest (the buffer shall be 25-100 feet for nesting birds and 300- to 500-
feet for nesting raptors), unless otherwise determined by a qualified Biologist; and (2)
access shall be restricted within the buffer of any active nest, unless otherwise
determined by a qualified Biologist. Encroachment into the buffer area around a known
nest shall only be allowed if the Biologist determines that the proposed activity would
not disturb the nest occupants. Once the qualified Biologist has determined that
fledglings have left the nest, there is no evidence of a second nesting attempt, or the
nest has failed, construction can proceed within the buffer zone.
R:1Projects1WD113WD10004001Environmental DommentationTinal SEI Winal SEIR-022824.docx 4-13
DisneylandForward
Final Subsequent EIR No. 352
Mitigation
Measure/Project Responsible for
Design Feature Timing Measure Monitoring Completion
Number
Cultural Resources
MM CUL-1
Prior to issuance of each
The property owner/developer shall submit a letter identifying the certified
Public Works
grading permit
archaeologist that has been hired to ensure that the following actions are implemented:
Department;
a. The archaeologist must be present at the pre -grading conference in order to
Development Services
Division
establish procedures for archaeological monitoring, as well as for temporarily
halting or redirecting work to permit the sampling, identification, and evaluation
of artifacts if potentially significant artifacts are uncovered. Specific monitoring
procedures will be established based on review of site specific conditions,
including presence of native soils, anticipated construction activities, and nature
of ground disturbance including depth of excavation. If artifacts are uncovered
and determined to be significant, the archaeological observer shall determine
appropriate actions in cooperation with the property owner/developer for
exploration and/or salvage.
b. Specimens that are collected prior to or during the grading process shall be
donated to an appropriate educational or research institution.
c. Any archaeological work at the site shall be conducted under the direction of
the certified archaeologist. If any artifacts are discovered during grading
operations when the archaeological monitor is not present, grading shall be
diverted around the area until the monitor can survey the area.
d. A final report detailing the findings and disposition of the specimens shall be
submitted to the Planning and Building Department within ninety days.
MM CUL-2
For properties within the
For properties that contain a structure over 45 years old, property owners/developers
Planning &Building
ARSP, prior to approval of
shall submit to the Planning and Building Department, Planning Services Division,
Department, Planning
building, grading or
documentation to verify the presence/absence of historic resources. On properties
Services Division
demolition permits,
where resources are identified, such documentation in accordance with NABS
whichever occurs first
standards shall provide a detailed mitigation plan, including a monitoring program and
recovery and/or in situ preservation plan, based on the recommendations of a qualified
specialist.
R:IProjectslWD113WD10004001Environmental DocumentationTinal SEIRT1nal_SEIR-022824.docx 4-14
DisneylandForward
Final Subsequent EIR No. 352
Mitigation
Measure/Project
Timing
Measure
Responsible for
Completion
Design Feature
Monitoring
Number
MM CUL-3
Prior to the issuance of
The property owner/developer shall be responsible for implementing the following and
Planning & Building
grading, demolition or
submitting the required documentation to the Planning and Building Department,
Department, Planning
building permits, whichever
Planning Services Division: If an individual development project within the potential
Services Division
occurs first
Disneyland Theme Park Historic District proposes to substantially alter or demolish a
contributing feature to the potential Disneyland Theme Park Historic District as
identified in the Historic Resources Technical Report attached as Appendix E-2 to
Subsequent EIR No. 352, that contributing feature shall be documented in the outline
format as specified in the HABS History Guidelines, and photographed according to
the HABS Photography Guidelines, . The documentation shall be prepared by a
historian or architectural historian who meets the Secretary of the Interior's Historic
Preservation Professional Standards in the relevant discipline. Digital copies of the
documentation shall be submitted to the Anaheim Planning and Building Department,
Planning Services Division for storage with Heritage Services, and housed in the Walt
Disney Company archives.
MM CUL-4
Prior to the issuance of
The property owner/developer shall be responsible for implementing the following
Planning &Building
grading, demolition or
and submitting the required documentation to the Planning and Building Department,
Department, Planning
building permits, whichever
Planning Services Division: If any of the individually designated or potentially eligible
Services Division
occurs first
features or buildings within the theme park, as identified in the Historic Resources
Technical Report attached as Appendix E-2 to Subsequent EIR No. 352, are proposed
for substantial alteration or demolition, that feature or building shall be documented
individually in the outline format as specified in the HABS History Guidelines, and
photographed according to the HABS Photography Guidelines. The documentation
shall be prepared by a historian or architectural historian who meets the Secretary of
the Interior's Historic Preservation Professional Standards in the relevant discipline.
Digital copies of the documentation shall be submitted to the Anaheim Planning and
Building Department, Planning Services Division for storage with the Heritage
Services Division, and housed in the Walt Disney Company archives.
SR CUL-I
Before and during
If human remains are discovered on -site, no further disturbance shall occur until the
Planning & Building
construction
County Coroner has made a determination of origin, and disposition pursuant to
Department, Planning
California Public Resources Code Section 5097.98 and California Health and Safety
Services Division
Code Section 7050.5 has occurred.
R:1ProjectslWDI13WD10004001Environmental DocumentationlFinal SEIR1Final_SEIR-022824.do 4-15
Mitigation
Measure/Project
Design Feature
Number
MM ENE-1
NM ENE-2
MM ENE-3
NM ENE-4
NM ENE-5
Timing
Measure
Energy
Prior to issuance of each The property owner/developer shall submit plans and calculations to demonstrate that
building permit the energy efficiency of each building will exceed the Title 24, Part 6, Building Energy
Efficiency Standards current at the time of application by at least 10 percent.
Prior to submittal of plans Any new system improvements (e.g., substation, line connections), if required, shall
for electrical system be constructed in accordance with the City's Electric Rates, Rules and Regulations and
improvements Electrical Specifications. Electrical Service Fees and other applicable fees will be
assessed in accordance with the then current Electric Rates, Rules and Regulations and
Electrical Specifications.
Prior to approval of each The Southern California Gas Company has developed several programs which are
final building and zoning intended to assist in the selection of most energy -efficient water heaters and furnaces.
inspection The property owner/developer shall implement a program, as required, to reduce the
demand on natural gas supplies.
Prior to issuance of each The property owner/developer shall demonstrate on plans that fuel -efficient models of
building permit gas -powered building equipment have been incorporated into the proposed project to
the extent feasible.
Prior to issuance of a The property owner/developer shall incorporate feasible renewable energy
building permit measures into the project. These measures may include but not be limited to useofrenewable biofuels, solar and small wind turbine sources on new and existing facilities
and the use of solar powered lighting in parking areas.
PDF ENE-1 Ongoing during project The project shall be developed in conformance with The Disneyland Resort Specific
development and operation Plan and shall offer a broad diversity of theme park, retail, dining and entertainment
experiences which will enhance the destination resort character of The Disneyland
Resort. As a result, many visitors will extend their length of stay; thus, incremental
vehicular trips to and from the site are expected to be reduced.
R:1Projects1WD113VVD1000400\Environmental DocumentationTinal SEIRTinal SEIR-022824.d
- ocx 4-16
DisneylandFonvard
Final Subsequent EIR No. 352
Responsible for
Monitoring
Planning & Building
Department, Building
Division; Utilities
Department, Resource
Efficiency Section
Planning & Building
Department, Building
Division; Utilities
Department, Electric
Services Division
Utilities Department,
Resource Efficiency
Section
Planning & Building
Department, Building
Division; Utilities
Department, Resource
Efficiency Section
Planning & Building
Department, Building
Division; Utilities
Department, Resource
Efficiency Section
Planning & Building
Department, Planning
Services Division
Completion
DisneylandFonaard
Final Subsequent E!R No. 352
Mitigation
Measure/Project
Timing
Measure
Responsible for
Completion
Design Feature
Monitoring
Number
SR ENE-1
Prior to the issuance of each
The property owner/developer shall be required to prepare and submit to the City for
Planning & Building
building permit
review and approval (1) a Landscape Documentation Package and (2) landscape and
Department, Planning
irrigation plans with appropriate water use calculations in accordance with the
Services Division
requirements of Anaheim Municipal Code Chapter 10.19, Landscape Water
Efficiency.
SR ENE-2 Prior to the issuance of The property owner/developer shall be required to demonstrate to the Planning Planning & Building
building permits Department, Building Division that building plans meet the applicable California Department, Building
Green Building Standards. Division
Geology
MM GEO-1
Prior to approval of each
The property owner/developer shall submit to the Public Works Department,
Public Works
grading plan
Development Services Division, for review and approval a thorough soils and
Department,
geological report for the area to be graded, based on proposed grading and prepared by
Development Services
an engineering geologist and geotechnical engineer. The report shall comply with Title
Division
17 of the Anaheim Municipal Code.
MM GEO-2
Prior to issuance of each
The property owner/developer shall submit to the Planning and Building Department,
Planning & Building
building permit
Building Division for review and approval, detailed foundation design information for
Department, Building
the subject building(s), prepared by a civil engineer, based on recommendations by a
Division
geotechnical engineer.
MM GEO-3
Prior to issuance of each
The property owner/developer shall submit a report prepared by a geotechnical
Planning & Building
_
foundation permit
engineer to the Planning and Building Department, Building Division for review and
Department, Building
approval, which shall investigate the subject foundation excavations to determine if
Division
soft layers are present immediately beneath the footing site and to ensure that
compressibility does not underlie the footing.
MM GEO-4
Prior to issuance of each
The property owner/developer shall submit plans to the Planning and Building
Planning & Building
building permit
Department, Building Division for review and approval showing that the proposed
Department, Building
structure has been analyzed for earthquake loading and designed according to the
Division
most recent seismic standards in the California Building Code adopted by the City of
Anaheim.
MM GEO-5
Prior to issuance of building
The property owner/developer shall submit to the Planning and Building Department,
Planning & Building
or grading permits
Building Division geologic and geotechnical investigations in areas of potential
Department, Building
seismic or geologic hazards and provide a note on plans that all grading operations
Division
shall be conducted in conformance with the recommendations contained in the
applicable geotechnical investigation.
R:1ProjectslVMI13WD10004001Envimnmental DocumentationTinal SEIR%Final_SEIR-022824.docx 4-17
Disney/andFonmard
Final Subsequent E1R No. 352
Mitigation
Measure/Project
Timing
Measure
Responsible for
Completion
Design Feature
Monitoring
Number
MM GEO-6
Ongoing during grading
The property owner/developer shall implement standard practices for all applicable
Planning & Building
activities
codes and ordinances to prevent erosion to the satisfaction of the Planning and Building
Department, Building
Department, Building Division.
Division
MM GEO-7
Prior to issuance of each
The property owner/developer shall submit a letter identifying the certified
Public Works
grading permit
paleontologist meeting the Society of Vertebrate Paleontology (SVP) standards that
Department,
has been hired to ensure that the following actions are implemented:
Development Services
a. The paleontologist must be present at the pre -grading conference in order to
Division
establish procedures for paleontological monitoring, as well as for temporarily
halting or redirecting work to permit the sampling, identification, and evaluation
of fossils if potentially significant paleontological resources are uncovered. If
fossils are uncovered and found to be significant, the paleontological monitor
shall administer appropriate actions based on SVP protocols'.
b. Specimens that are collected prior to or during the grading process shall be
reposited in an appropriate educational or research institution. Preparation,
storage and curation shall be funded by the property owner/developer.
c. Any paleontological work at the site shall be conducted under the direction of
the certified paleontologist. If any fossils are discovered during grading
operations when the paleontological monitor is not present, grading shall be
diverted around the discovery by a buffer of at least 50 feet. Construction shall
not resume until the paleontological monitor has given the order to proceed in
that location once a determination on the significance of the fossil discovery has
been made.
d. A final report detailing the findings and disposition of the specimens shall be
submitted. Upon completion of the grading, the paleontologist shall notify the
City as to when the final report will be submitted.
SR GEO-1
Ongoing during grading
All grading operations will be conducted in conformance with the Anaheim Municipal
Public Works
activities
Code, Title 17, Land Development and Resources, and the most recent version of the
Department,
California Building Code.
Development Services
1
Division
Society of Vertebrate Paleontology (SVP), Guidelines from the Ethics Education Committee for Collecting, Documenting and Curating Fossils (last updated 2021).
hftps://vertpaleo.org/Wp—content/uploads/2021/01/Guidelines-from-the-Ethics-Education-Commiftee.pdf (accessed August 18, 2023).
R:1ProjectslWD113WDI0004001Envimnmental DocumentationTinal SEIRTinal_SEIR-022824.dou 4-18
DisneylandForward
Final Subsequent EIR No. 352
Mitigation
Measure/Project Responsible for
Timing Measure Completion
Design Feature Monitoring
Number
Greenhouse Gas Emissions
As discussed in Draft Subsequent EIR No. 352, Section 5.7, Greenhouse Gas Emissions, incorporates SRs, MMs, and PDFs from Section 5.1, Air Quality; Section 5.5, Energy;
Section 5.9, Hydrology and Water Quality; Section 5.14, Transportation; and Section 5.16, Utilities and Service Systems.
Hazards and Hazardous Materials
MM HAZ-1
Prior to any relocation of
The transformers shall be tested by the property owner/developer for PCBs.
Utilities Department,
transformers that may
Electric Services
contain PCBs which are
being moved or relocated as
part of project development
MM HAZ-2
Ongoing during demolition
In the event that hazardous waste, including asbestos, is discovered during site
Fire Department,
and construction
preparation or construction, the property owner/developer shall ensure that the
Environmental
identified hazardous waste and/or hazardous material are handled and disposed of in
Protection Section
the manner specified by the State of California Hazardous Substances Control Law
(Health and Safety Code, Division 20, Chapter 6.5), according to the requirements of
the California Administrative Code, Title 30, Chapter 22.
MM HAZ-3
Prior to approval of a
The property owner/developer shall submit a Phase I Environmental Site Assessment
Fire Department,
grading plan or issuance of
(ESA) prepared pursuant to current ASTM Standard Practice for Environmental Site
Environmental
a demolition permit,
Assessments to identify potential threats to human health and the environment for
Protection Section;
whichever occurs first
review by the City. If possible hazardous materials are identified during the site
Orange County Health
assessments, the appropriate response/remedial measures will be implemented in
Care Agency
accordance with the requirements of the Orange County Health Care Agency
(OCHCA) and/or the Regional Water Quality Control Board (RWQCB), as
appropriate. The ESA shall detail procedures that shall be taken if a previously
unknown underground storage tank (UST) or other unknown hazardous materials or
waste is discovered onsite. The ESA shall outline where hazardous materials may be
found, types of hazardous materials anticipated, how to screen for them, and what to
do in the event they are identified. The ESA shall identify the party responsible for the
screening, and training requirements for those responsible for undertaking the
screening effort. The ESA shall specify requirements for reporting, handling, staging,
disposal, and recordkeeping. The ESA shall also identify contingencies in the event
that significant contamination is identified that is 1) above regulatory thresholds and
2) cannot be removed/ remediated by proposed construction.
R:IProjectslWDl13WD10004001Environmental DocumentationTinal SEIR1Final_SEIR-D22824.docx 4-19
DisneylandForward
Final Subseouent E!R No. 352
Mitigation
Measure/Project
Timing
Measure
Responsible for
Completion
Design Feature
Monitoring
Number
MM HAZ-4
Prior to issuance of a
In areas known or thought to have been previously occupied by underground storage
Fire Department,
grading or demolition
tanks (USTs), or other hazardous materials or waste, and in areas where tank removal
Environmental
permit, whichever occurs
has not been verified prior to excavation or grading; the property owner/developer
Protection Section;
first
shall retain the services of a qualified environmental professional to conduct an
Orange County Health
investigation for known, or the presence of, cryptic tanks using geophysical methods
Care Agency
that include the potential use of ground penetrating radar (GPR) or similar
technologies to determine no abandoned USTs are present.
MM 14AZ-5
Prior to the removal of
The property owner/developer shall obtain a permit from the Hazardous Materials
Fire Department,
underground storage tanks
Management section of the Fire Department for removal of such tanks. During
Environmental
(USTs)
removal of the underground storage tank, a representative from the Hazardous
Protection Section;
Materials Section (RIMS) of the Fire Department shall be onsite to direct soil sampling.
Orange County Health
Care Agency
MM HAZ-6
Ongoing during remediation
All remediation activities of surface or subsurface contamination not related to
Fire Department,
underground storage tanks (USTs), conducted on behalf of the property
Environmental
owner/developer, shall be overseen by the Santa Ana Regional Water Quality Control
Protection Section;
Board (SARWQCB) and witnessed by Anaheim Fire Department/Hazardous Material
Orange County Health
Management Section (RIMS). Information on subsurface contamination from an
Care Agency
underground storage tank shall be provided to the Santa Ana Regional Water Quality
Control Board (SARWQCB) with a copy to Planning & Building.
MM HAZ-7
Prior to issuance of each
A hazardous building material survey shall be conducted to verify the absence of
Fire Department,
demolition permit
hazardous building materials and, if needed, future abatement by a California -licensed
Environmental
contractor, and/or removal and disposal in accordance with federal, state, and local
Protection Section;
transportation and disposal regulations.
Orange County Health
Care Agency
SR HAZ-1
Ongoing during Project
All construction activities, including demolition and renovation of the existing
Fire Department,
construction
facilities and installation of the new facilities, shall be performed in compliance with
Environmental
all CalOSHA standards (California Code of Regulations, Title 8) to protect worker
Protection Section;
health and safety.
Orange County Health
_
Ongoing during Project
Care Agency
SR HAZ-2
The removal and disposal of any lead -based paint (LBP) encountered on site during
Fire Department,
implementation
Project implementation shall be performed by an LBP Abatement Contractor that is
Environmental
licensed and registered in California pursuant to California Code of Regulations
Protection Section;
Title 17.
Orange County Health
Care Agency
R:1Projects1WD113WD10004001Environmental DocumentationlFinal SEIR1Final_SEIR-022824.doa 4-20
Mitigation
Measure/Project
Design Feature Timing
Number
Measure
SR HAZ-3 Ongoing during Project Activities at the Project Site shall comply with existing federal, State, and local
construction and operations regulations regarding hazardous material use, storage, disposal, and transport. All on -
site generated waste that meets hazardous waste criteria shall be stored, manifested,
transported, and disposed of in accordance with the California Code of Regulations
(Title 22) and in a manner to the satisfaction of the local Certified Unified Program
Agency (CUPA), as applicable.
SR HAZ-4
MM HWQ-1
MM HWQ-2
All transport and transfer of hazardous materials shall be performed by a licensed
hazardous waste hauler in compliance with all applicable State and federal
requirements, including U.S. Department of Transportation regulations under Title 49
(Hazardous Materials Transportation Act) and Title 40, Section 263 (Subtitle C of the
Resource Conservation and Recovery Act) of the Code of Federal Regulations;
California Department of Transportation (Caltrans) standards; and Division of
Occupational Safety and Healthy (Cal/OSHA) standards.
Ongoing during Project All construction activities, including demolition and renovation of the existing
construction facilities and installation of the new facilities, shall be performed in compliance with
South Coast Air Quality Management District (SCAQMD) Rule 1403 requiring a
survey for and proper abatement of asbestos -containing materials prior to
construction.
Hydrology and Water Quality
Ongoing during Project The property owner/developer shall complywith the Master Drainage and Runoff
operations Management Plan (MDRMP) and shall submit updates as required for new grading
for review and approval by the City Engineer.
Prior to issuance of each - The property owner/developer shall submit landscaping and irrigation plans and an
building permit Irrigation Management Program. This landscape plan shall include a maintenance
program to control the use of fertilizers and pesticides, and an irrigation system
designed to minimize surface runoff and overwatering. Additionally:
a. The landscape plans shall be prepared and certified by a licensed landscape
architect. The landscape architect shall submit plans in accordance with
Anaheim's Landscape Water Efficiency Ordinance and Guidelines including:
L Project Information
2. Maximum Applied Water Use expresses as annual totals.
3. Soil management report or specifications.
R:1Projects%WDi13WD10004001Environmental DocumentalionlFinal SEIR1Final SEIR-022824.docx
4-21
DisneylandFonvard
Final Subsequent EIR No. 352
Responsible for
Monitoring Completion
Fire Department,
Environmental
Protection Section;
Orange County Health
Care Agency
Air Quality
Management District
Public Works
Department,
Development Services
Division
Public Utilities, Water
Services;
Planning & Building
Department, Planning
Services Division
DisneylandForward
Final Subseauent E1R No. 352
Mitigation
Measure/Project
Design Feature
Number
Timing
Measure
Responsible for
Monitoring
Completion
4. Landscape design plan.
5. Irrigation design plan.
6. Grading design plan.
b. The Irrigation Management Program shall specify methods for monitoring the
irrigation system and shall be designed by an irrigation engineer (plans to be
submitted in accordance with the Specific Plan). The system shall ensure that
irrigation rates do not exceed the infiltration of local soils and that the
application of fertilizers and pesticides do not exceed appropriate levels of
frequencies.
c. The landscape and irrigation plans shall be developed to be consistent with the
provisions of the Specific Plan, which require that the Estimated Applied Water
Use (EAWU) to be less than the Maximum Applied Water Allowance (MAWA)
or that the landscape irrigation system include water -conserving features such
as low -flow irrigation heads, automatic irrigation scheduling equipment, flow
sensing controls, rain sensors, soil moisture sensors, and other water -conserving
equipment. In addition, all irrigation systems shall be designed so that they will
function properly with reclaimed water, if it should become available.
MM HWQ-3
Ongoing during operation of
The property owner/developer shall provide for the following: cleaning of all paved
Planning & Building
the Disneyland Resort
areas not maintained by the City of Anaheim including, but not limited to, private
Department, Code
streets and parking lots on not less than a monthly basis. Using water to clean streets,
Enforcement Division
parking lots, and other areas shall be allowed on a periodic basis if allowed in the
property owner/developer's NPDES permit and allowable based on drought
restrictions. Nightly washdown shall be allowed in the theme parks and, where
advisable to maintain safe and sanitary working conditions, the back -of -house area, if
allowed in the property owner/developer's and City's NPDES permit. Flushing debris,
residue, and sediment down the storm drains shall conform to the property
owner/developer's NPDES requirements. Property owner/developer agrees that
material deposited in City storm drains shall not be in violation of the City's NPDES
permit.
R:1Projecta1WD113WD10004001Envimnmental DocumentationlFinal SEIRIFinal_SEIR-022824.docx 4-22
DisneylandFonvard
Final Subsequent E!R No. 352
Mitigation
Measure/Project
Design Feature
Timing
Measure
Responsible for
Monitoring
Completion
Number
MM HWQ-4
Prior to each final building
The property owner/developer shall submit a Certificate of Substantial Completion, as
Planning & Building
and zoning inspection (for
described in the Disneyland Resort Specific Plan, which establishes that the landscape
Department, Planning
non -Setback Realm Areas);
irrigation systems have been installed as specified in the approved landscaping and
Services Division
prior to acceptance by City
irrigation plans.
Engineer (for Setback
Realm Areas)
MM HWQ-5
Ongoing during grading
The property owner/developer shall implement standard practices from all applicable
Public Works
operations
codes and ordinances to prevent erosion.
Department,
Development Services
Division
MM HWQ-6
Prior to issuance of a
The property owner/developer shall obtain coverage under the NPDES Statewide
Planning & Building
grading permit for sites that
Stormwater Permit for General Construction Activities from the State Water Resources
Department, Code
disturb more than one (1)
Control Board. Evidence of attainment shall be submitted to the Planning and Building
Enforcement Division
acre of soil
Department, Building Division.
MM HWQ-7
Prior to issuance of each
To reduce the project's demand on potable water, the property owner/developer shall
Planning & Building
building permit
install water lines onsite so that reclaimed water may be used for landscape irrigation
Department, Planning
and other purposes, if and when it becomes available.
Services Division
MM HWQ-8
Prior to each final building
The property owner/developer shall submit a letter from a licensed landscape architect
Planning & Building
and zoning inspection
to the City certifying that the landscape installation and irrigation systems have been
Department, Planning
installed as specified in the approved landscaping and irrigation plans.
Services Division
MM HWQ-9
Prior to issuance of building
The property owner/developer shall provide written evidence that all storm drain,
Public Works
permits
sewer, and street improvement plans shall be designed and constructed to the
Department,
satisfaction of the City Engineer.
Development Services
Division
SR HWQ-1
Prior to the issuance of
Development projects that will result in soil disturbance of one (1) or more acres of
Public Works
preliminary or precise
land shall comply with the State's Construction General Permit by filing a Notice of
Department,
grading permits
Intent (NOI) with the State Water Resources Control Board (SWRCB) and
Development Services
implementing a Storm Water Pollution Prevention Plan (SWPPP). The property
Division
owner/developer shall provide the City Engineer with evidence that an NOI has been
filed with the SWRCB by providing a copy of the NOI invoice and the assigned Waste
Discharger Identification (WDID) No. for the project. The SWPPP shall include Best
Management Practices (BMPs) designed with a goal of preventing a net sediment load
increase in storm water discharges relative to preconstruction levels and shall prohibit
during the construction period discharges of storm water or non -storm water at levels
which would cause or contribute to an exceedance of applicable water quality standards
contained in the Basin Plan. The BMPs shall address erosion control, sediment control,
R:1Projects1WD113WD10004001Environmental DocumentationlFinal SEIR1Final_SEIR-022824.dou 4-23
DisneylandFonvard
Final Subsequent E1R No. 352
Mitigation
Measure/Project
Timing
Measure
Responsible for
Completion
Design Feature
Monitoring
Number
wind erosion control, tracking control, non -storm water management and waste
management and materials pollution control during all phases of construction,
including a sampling and analysis plan for sediment and non -visible storm water
pollutants. The property owner/developer shall be responsible for proper
implementation of the SWPPP.
SR 14WQ-2
Prior to issuance of the
The property owner/developer shall prepare Water Quality Management Plans
Public Works
precise grading permit
(WQMPs) for review and approval by the Public Works, Development Services. The
Department,
WQMP shall identify permanent site design, source control and treatment control Best
Development Services
Management Practices (BMPs) that will be used on the site to control predictable
Division
pollutant runoff. The WQMP shall also describe the long-term operation and
maintenance requirements for the treatment control BMPs and the mechanism for
funding the BMPs. The WQMP shall be recorded against the property to ensure long-
term compliance.
SR HWQ-3
Prior to issuance of the first
The property owner/developer shall pay the Storm Drain Impact Fees which would go
Public Works
building permit for Disney
toward future storm drain improvements within The Anaheim Resort area and South
Department,
ARSP Properties
Central City area.
Development Services
Division
SR HWQ-4
Ongoing during Project
Chapter 10.09 of the Anaheim Municipal Code is the City's NPDES Ordinance, which
Planning & Building
construction and operations
provides regulations to comply with the CWA, the California Porter -Cologne Water
Department, Code
Quality Control Act, and the City's NPDES permit. This ordinance prohibits the
Enforcement Division
discharge of specific pollutants into the storm water; regulates illicit connections to the
storm drain system; requires development projects to implement permanent BMPs on
individual sites to reduce pollutants in the storm water; and requires local discharge
permits for non -storm water discharges into the storm drain system.
SR HWQ-5
Prior to issuance of grading
The property owner/developer of individual developments shall provide written proof
Public Works
permit
to the Public Works Department, Development Services Division of a water quality
Department,
certification and/or waste discharge requirement (WDR) as well as a plan for
Development Services
compliance with the discharge prohibitions, TMDLs, and various programs of the
Division
Santa Ana RWQCB. The Santa Ana RWQCB implements the Water Quality Control
Plan for the Santa Ana River Basin through the issuance of individual WDRs;
discharge prohibitions; water quality certifications; programs for salt management,
non -point sources, and storm water; and monitoring and regulatory enforcement
actions, as necessary.
R:1ProjectslWDI13WD10004001Environmental DocumentationlFinal SEIR1Final_SEIR-022824.do 4-24
DisneylandForward
Final Subseauent EIR No. 352
Mitigation
Measure/Project Responsible for
Timing Measure Completion
Design Feature Monitoring
Number
Land Use and Planning
MM LU-1 Prior to issuance of each Building plans shall be submitted by the property owner/developer and will be Planning & Building
building permit reviewed for consistency with The Disneyland Resort Specific Plan and The Anaheim Department, Planning
Resort Specific Plan. Services Division
MM LU-2
Prior to issuance of each
The proposed project shall be implemented based on the guidelines and standards in
Planning & Building
building permit
The Disneyland Resort Specific Plan, which includes zoning and development
Department, Planning
standards, design guidelines, and a Public Facilities Plan. All development proposals
Services Division
within The Disneyland Resort must be consistent with The Disneyland Resort Specific
Plan, the Anaheim Resort Specific Plan, and the City of Anaheim General Plan.
MM LU-3
Prior to issuance of each
The property owner/developer shall submit plans detailing the setbacks for the parking
Planning & Building
building permit for parking
structures and landscaping plans which minimize compatibility impacts of the parking
Department, Planning
facilities
facilities on surrounding areas, consistent with The Disneyland Resort Specific Plan
Services Division
and the Anaheim Resort Specific Plan.
PDF LU-1
Prior to approval of issuance
The property owner/developer shall submit documentation that project design features
Planning & Building
of each building permit
are in compliance with all building setbacks, height standards, landscaping
Department, Planning
requirements, and design guidelines as specified in The Disneyland Resort Specific
Services Division
Plan and the Anaheim Resort Specific Plan.
Noise
MM NOI-1
Ongoing during project
The property owner/developer shall obtain pyrotechnic permits on an annual basis.
Fire Department;
operation
Material additions or modifications to firework shoots shall require a separate permit.
MM NOI-2
Ongoing during project
Lower noise -producing fireworks displays will be used at Disney California Adventure
Fire Department;
operations
to minimize noise from 11:00 p.m. fireworks shows to meet the noise levels in the City
Planning & Building
of Anaheim Sound Pressure Level Ordinance.
Department, Code
Enforcement Division
MM NOI-3
Ongoing during project
No aerial fireworks show shall be allowed west of Disneyland Drive in the expanded
Fire Department;
operations and prior to the
Theme Park District, the Southeast District or the ARSP Theme Park Overlays. Prior
Planning & Building
commencement of any show
to the commencement of any show in these areas that includes fireworks that are non-
Department, Code
west of Disneyland Drive in
explosive (i.e., stage pyrotechnics) or explosive fireworks with an explosion point at
Enforcement Division
the expanded Theme Park
an elevation less 50 feet (e.g., Fantasmic!), the property owner/developer shall present
District, the Southeast
a noise study to the Planning and Building Department to demonstrate that noise levels
District or the ARSP Theme
from the fireworks would meet the City's 60 dBA Sound Pressure Levels standard at
Park Overlays areas that
the property line, and would not create a noise increase greater than 5 dBA over
includes fireworks that are
R:1ProjectslWDR3WD10004001Environmental Documenta8on\Final SEIRTinal_SEIR-022824.dam 4-25
DisneylandForward
Final Subsequent ElR No. 352
Mitigation
Measure/Project
Timing
Measure
Responsible for
Completion
Design Feature
Monitoring
Number
non -explosive (i.e., stage
existing ambient noise at the nearest noise sensitive receptor, whichever is more
pyrotechnics) or explosive
restrictive.
fireworks with an explosion
point at an elevation less 50
feet (e.g., Fantasmic!)
MM NOI-4
Prior to issuance of a
Plans submitted for the location of the amphitheater will document that the facility is
Planning & Building
building permit for an
no closer than 2,000 feet from the nearest existing residence. The design and
Department, Planning
amphitheater
orientation of the amphitheater will be reviewed by a certified acoustical engineer; the
Services Division
property owner/developer shall submit a report, for review and approval by the City,
to ensure that noise from the amphitheater does not exceed the noise levels established
by the City of Anaheim Sound Pressure Level Ordinance.
MM NOI-5
Prior to final building and
A Noise Monitoring Program prepared by a certified acoustical engineer shall be
Planning & Building
zoning inspection for the
submitted for review and approval. The property owner/developer shall submit the
Department, Planning
amphitheater and within 9
results of the Noise Monitoring Program conducted by a certified acoustical engineer
Services Division
months of commencement
to ensure that there are not violations of the Sound Pressure Level Ordinance from
of amphitheater operations
amphitheater operations outside the Disneyland Resort. If noise in excess of the Sound
Pressure Level Ordinance is detected, the property owner/developer shall modify
operations within three days to bring the amphitheater into conformance with the
Sound Pressure Level Ordinance.
MM NOI-6
Ongoing during
Engine noise from sweeping equipment used in the parking facilities and any hotel
Planning & Building
construction and project
parking facilities adjacent to residential areas shall be muffled. Sweeping operations in
Department, Building
operations
the parking facilities and private on -site roadways shall be performed utilizing
Division; Public Works
sweeping/scrubbing equipment which operate at a level measured not greater than 60
Department,
dBA at the nearest adjacent property line.
Development Services
Division
MM NOI-7
Prior to issuance of each
For structures that are adjacent to residential areas or other sensitive uses, the property
Planning & Building
building permit to be
owner/developer shall present plans and calculations to the Planning and Building
Department, Building
implemented prior to final
Department to demonstrate that noise levels from mechanical ventilation units, loading
Division and Planning
building and zoning
docks, trash compactors, and other proposed on -site noise sources are designed to meet
Services Division
inspections
the City's 60 DBA Sound Pressure Levels standard at the property line, and not create
a noise increase greater than 3 dBA over existing ambient noise at the nearest noise
sensitive receptor, whichever is more restrictive.
R.lProjectslWDI\3WD10004001Envimnmental DocumentationlFina[ SEIR%Final_SEIR-022824.dom 4-26
DisneylandForward
Final Subsequent EIR No. 352
Mitigation
Measure/Project
Timing
Measure
Responsible for
Completion
Design Feature
Monitoring
Number
Ongoing during
The property owner/developer shall ensure that all internal combustion engines on
NM NOI-8
Planning & Building
construction
construction equipment and trucks are fitted with properly maintained mufflers.
Department, Building
Division; Public Works
Department,
Development Services
Division
MM NOI-9
Prior to issuance of each
The property owner/developer shall submit a noise study prepared by a certified
Planning & Building
building permit
acoustical engineer to the satisfaction of the Building Official identifying whether
Department, Building
noise attenuation is required and defining the attenuation measures and specific
Division and Planning
performance requirements, if warranted, to comply with the California Building Code
Services Division
and Sound Pressure Level Ordinance. Ultimate noise attenuation requirements, if any,
shall depend on the final location of such buildings and noise -sensitive uses inside and
surrounding the buildings. Attenuation measures, such as but not limited to acoustic
sound barriers, shall be implemented by the property owner/developer prior to final
building and zoning inspections.
NM NOI-10
Prior to issuance of each
A note shall be provided on building plans indicating that during construction, the
Planning & Building
building permit for
property owner/developer shall install and maintain specially designed construction
Department, Building
construction within 75 feet
barriers between the project perimeter and the sensitive receptor. The construction
Division and Planning
of noise sensitive receptors
sound barriers shall be a minimum height of 8 feet with a minimum surface weight of
Services Division
1.25 pounds per square foot or a minimum Sound Transmission Class (STC) rating of
25. The structure shall be a continuous barrier. Gates and other entry doors shall be
constructed with suitable mullions, astragals, seals, or other design techniques to
minimize sound leakage when in the closed position. Access doors should be self
closing where feasible. Vision ports are permissible providing they are filled with an
acceptable solid vision product.
MM NOI-I I
Ongoing during
Pressure washing operations for purposes of building repair and maintenance due to
Planning & Building
construction and project
graffiti or other aesthetical considerations and in areas along the property line or
Department, Code
operation
accessible by the public shall be limited to daytime hours of operation between 7:00
Enforcement Division
AM and 8:00 PM.
R:1ProjectslVMI\3WDI0004001Emimnmental DocumentationTinal SEIRTinal_SEIR-022824.docx 4-27
DisneylandForward
Final Subsequent EIR No. 352
Mitigation
Measure/Project
Timing
Measure
Responsible for
Completion
Design Feature
Monitoring
Number
MM NOI-12
Ongoing during
Property owners/developers shall pay for all reasonable costs associated with noise
Planning & Building
construction
monitoring which shall include monitoring conducted by a certified acoustical engineer
Department, Planning
under the direction of the Planning and Building Department four times a year on a
Services Division
random basis to ensure that outdoor construction -related sound levels at any point on
the exterior project boundary property line do not exceed 60 dBA between the hours
of 7:00 PM and 7:00 AM of the following day where outside construction is occurring.
If a complaint is received by the City, additional noise monitoring shall be conducted
at the discretion of the City. If the monitoring finds that the 60 dBA threshold is being
exceeded, construction activities will be modified immediately to bring the sound level
below the 60 dBA requirement, with additional follow-up monitoring conducted to
confirm compliance.
MM NOI-13
Prior to issuance of each
A note shall be provided on plans indicating that there shall be no operation of clam
Planning & Building
building permit
shovel drops or vibratory rollers within 25 feet of any existing home.
Department, Building
Division
MM NOI-14
Prior to issuance of each
If pile driving and blasting is anticipated during construction, a noise and vibration
Planning & Building
building permit on Disney
analysis must be prepared and submitted to the Planning and Building Department to
Department, Building
ARSP Properties
assess and mitigate potential noise and vibration impacts related to these activities,
Division
including site design features such as setbacks and trenches.
MM NOI-15
Prior to issuance of each
The property owner/developer shall present area development plans if part of a new
Planning & Building
building permit and to be
theme park land or building plans if part of one theme park attraction to the Planning
Department, Planning
implemented prior to final
and Building Department to demonstrate any development of theme park uses in the
Services Division
building and zoning
expanded Theme Park District (west of Disneyland Drive), the Southeast District, or
inspections
the ARSP Theme Park Overlays includes 30-foot-tall buildings or structures between
the property line near residential or other noise sensitive land uses and the proposed
theme park land or theme park attraction. If a noise barrier is provided, such as a ride
fagade, the material used shall have a minimum surface weight of 1.25 pounds per
square foot or a minimum Sound Transmission Class (STC) rating of 25.
MM NOI-16
Ongoing during project
The property owner/developer shall pay all reasonable costs associated with noise
Planning & Building
operations
monitoring which shall include monitoring conducted by a certified acoustical
Department, Planning
consultant or engineer under the direction of the Planning Department to ensure that
Services Division
The Disneyland Resort ongoing operations do not exceed 60 dBA at any point on the
property line between the hours of 7:00 p.m. and 7:00 a.m. of the following day. If the
monitoring finds that the 60 dBA threshold is being exceeded, modifications to the
ongoing operations, such as adjustments to volume at the source or orientation of
speakers, shall be commenced immediately to bring the sound level below the 60 dBA
R:\Projects%WDI13WD10004001Environmental DocumentationTinal SEIMFinal_SEIR-022824.dom 4-28
DisneylandForward
Final Subseauent ElR No. 352
Mitigation
Measure/Project
Timing
Measure
Responsible for
Completion
Design Feature
Monitoring
Number
requirement with additional follow-up monitoring conducted to confirm compliance.
Monitoring shall be conducted as follows:
(a) Ongoing: Semi-annually on a random basis for a three (3) day period.
(b) During the first five (5) years of operation of theme park uses in the expanded
Theme Park District west of Disneyland Drive, the Southeast District, and/or
the ARSP Theme Park Overlays: Four (4) times a year on a random basis for a
three (3) day period.
(c) In response to a noise complaint, at the City's discretion: For a three (3) day
period at the location of the noise exceedance.
MM NOI-17
Prior to the issuance of each
A note shall be provided on the plans stating that ongoing during construction, the
Planning & Building
building permit, grading
property owner/developer shall designate a noise disturbance coordinator who would
Department, Planning
permit or demolition permit
respond to neighborhood complaints about construction noise by determining the cause
Services Division
of the noise complaints and requiring implementation of reasonable measures to correct
the noise issue.
MM NOI-18
Ongoing during
The property owner/developer shall locate all stationary noise -generating equipment
Planning & Building
construction
such as air compressors and portable generators a minimum of 75 feet from noise
Department, Building
sensitive receptors.
Division
_
MM NOI-19
Ongoing during
No impact driven piles shall be allowed in conjunction with the construction of parking
Planning & Building
construction
structures.
Department, Building
Division
MM NOI-20
Prior to issuance of a
The property owner/developer will submit plans to the Planning and Building
Planning & Building
building permit for a
Department indicating noise from the parking structure will be reduced by the
Department, Planning
parking structure
provision of convenient access to the parking structure, sound attenuation devices
Services Division
(louvers and walls), and the use of textured deck surfaces to reduce tire squealing.
MM NOI-21
Prior to issuance of each
The property owner/developer shall present plans to the Planning and Building
Planning & Building
building permit
Department to demonstrate development of theme park uses in the expanded Theme
Department, Planning
Park District (west of Disneyland Drive), the Southeast District, or the ARSP Theme
Services Division
Park Overlays shall include installation and maintenance of at least 12-foot-tall noise
barriers along the property line to reduce back -of -house noise, such as vehicle pass-
bys and truck deliveries with a minimum surface weight of 1.25 pounds per square foot
or a minimum Sound Transmission Class (STC) rating of 25.
R:1Projects1WD113WD10004001Environmental DocumentationlFinal SEIR%FInal_SEIR-022824.doat 4-29
DisneylandForward
Final Subsequent EIR No. 352
Mitigation
Measure/Project
Timing
Measure
Responsible for
Completion
Design Feature
Monitoring
Number
NM NOI-22
Prior to issuance of each
The property owner/developer shall present a noise study and area development plans
Planning & Building
building permit and to be
if part of a new theme park land or building plans if part of one theme park attraction
Department, Planning
implemented prior to final
in the expanded Theme Park District (west of Disneyland Drive), the Southeast
Services Division
building and zoning
District, or the ARSP Theme Park Overlays to the Planning and Building Department
inspections
to demonstrate any Thrill (Indoor) and Family (Indoor) attractions shall be located no
less than 200 feet from the center of the ride or attraction to noise -sensitive receptors
and shall include a 30-foot-high building or a 30-foot high noise barrier between the
attraction and the property line near noise -sensitive receptors, provided a 30-foot-high
building or 30-foot-high noise barrier shall not be required if the proposed ride or
attraction is located within an enclosed building or structure. The planning of each
attraction shall take into account any openings or outdoor areas of the attractions and
directionally orient the openings away from noise -sensitive receptors and towards the
center of the new theme nark development
MM NOI-23 Prior to issuance of each The property owner/developer shall present a noise study and area development plans
building permit and to be if part of a new theme park land or building plans if part of one theme park attraction
implemented prior to final in the expanded Theme Park District (west of Disneyland Drive), the Southeast
building and zoning District, or the ARSP Theme Park Overlays to the Planning and Building Department
inspections to demonstrate any Thrill (Outdoor), rides taller than 50 feet, Parades and Large Shows
shall be located:
1. For 1 st to 3rd Offsite Floor Receptors: No less than 550 feet from the center of
the ride to any noise -sensitive receptor and shall include a 30-foot-high building
or a 30-foot-high noise barrier between the attraction and the property line near
noise -sensitive receptors.
2. For 4th Floor Offsite Receptors and above (i.e., no shielding from 30-foot
buildings/barriers): No less than 1100 feet between the center of the ride and
any noise -sensitive receptor. If the distance of 1100 feet cannot be met, an
indoor rollercoaster shall be considered. If a distance less than 1100 feet is
considered with exposure to 4th Floor receptors, the distance to noise -sensitive
receptors and layout shall be reviewed by a certified acoustical consultant or
engineer prior to finalizing the site plan. In general, the entire full height of the
ride shall include a solid barrier shielding it from any noise -sensitive receptors.
The material used for the barrier shall have a minimum surface weight of 1.25
pounds per square foot or a minimum Sound Transmission Class (STC) rating
of 25.
R:1ProjectslWD113WD10004001Environmental Documenta0onTinni SE1MFina1SEIR-022824.do= 4-30
Planning & Building
Department, Planning
Services Division
Mitigation
Measure/Project
Design Feature
Number
MM NOI-24
Timing
Measure
Prior to issuance of each The property owner/developer shall present a noise study and area development plans
building permit and to be if part of a new theme park land or building plans if part of one theme park attraction
implemented prior to final in the expanded Theme Park District (west of Disneyland Drive), the Southeast
building and zoning District, or the ARSP Theme Park Overlays to the Planning and Building Department
inspections to demonstrate any Family (Outdoor), Round and Small Show attractions shall be
located at least 400 feet from sensitive receptors and include a 30-foot-high building
or a 30-foot-high noise barrier between the attraction and the property line near noise -
sensitive receptors.
DisneylandForward
Final Subsequent E!R No. 352
Responsible for I Completion
Monitoring
Planning & Building
Department, Planning
Services Division
SR NOI-1
Prior to issuance of grading
Contractor specifications shall include a note indicating that noise -generating
Planning & Building
and/or building permits
construction activities which produce a sound pressure level at any point along the
Department, Building
property line in excess of 60 dBA shall be limited to between the hours of 7:00 AM to
Division
7:00 PM on any day. This requirement is identified in Section 6.70.010 of the City of
Anaheim's Noise Ordinance. Additional work hours may be permitted if deemed
necessary by and on approval of the Director of Public Works or Building Official.
SR NOI-2
Prior to issuance of building
Development shall comply with Title 24 of the California Code of Regulations, also
Planning & Building
permits
known as the California Building Standards Code, which establishes building standards
Department, Building
applicable to all occupancies throughout the state. Title 24 requires that new hotels,
Division
motels, and multi -family residences be designed to prevent the intrusion of exterior
noise so that the interior noise, attributable to exterior sources, shall not exceed the 45
dBA Community Noise Equivalent Level (CNEL) in any habitable room with windows
closed.
SR NOI-3
Ongoing during Project
No commercial use shall produce noise associated with continual loading or unloading
Planning & Building
construction
of heavy trucks at the site between the hours of 8:00 PM and 6:00 AM (Municipal Code
Department, Building
Section 18.32.130).
Division
Population and Housing
PDF POP-1 Ongoing during project The Walt Disney Company will recruit workers who are already a part of the resident Planning & Building
operations work force in the region. Implementation of The Disneyland Resort Specific Plan will Department,
further efforts in offering employment opportunities at various socioeconomic levels. Planning Services
Division
R:1Projects1WD113WD10o04001Envimnmental DocumentationTinal SEIR1F1na1_SEIR-022824.do 4-31
DisneylandFonvard
Final Subseauent EIR No. 352
Mitigation
Measure/Project
Design Feature
Timing
Measure
Responsible for
Monitoring
Completion
Number
Public Services
Fire
MM PS-1
Prior to issuance of each
The property owner/developer shall pay all applicable fire fees in the amount then in
Fire Department
building permit for
effect and in accordance with the City -adopted Fire Protection Facilities and Paramedic
development in the ARSP
Services Impact Fee Program (initially established through City Council Resolution
Parking and Theme Park
No. 95R-73). Alternatively, the City and the Property Owner/Developer may enter into
Overlays
alternative financing arrangements.
MM PS-2
Prior to commencement of
Onsite fire hydrants shall be installed and charged, as required, by the property
Fire Department
structural framing on each
owner/developer.
parcel or lot
MM PS-3
Prior to approval of each
The property owner/developer shall submit an emergency fire access plan to ensure
Fire Department
grading plan
that service to the site is in accordance with the Fire Department service
requirements.
MM PS-4
Prior to issuance of each
The property owner/developer shall submit a Construction Fire Protection Plan which
Fire Department
building permit
shall include detailed design plans for accessibility of emergency fire equipment, fire
hydrant location, and any other construction features required by the Fire Marshal. The
property owner/developer shall be responsible for securing facilities acceptable to the
Fire Department and hydrants shall be operational with required fire flow. A
construction plan providing a complete timeline and construction goals shall be
provided and approved by the Fire Department for all new construction projects.
MM PS-5
Prior to issuance of each
Plans shall indicate that all buildings shall have sprinklers installed by property
Fire Department
building permit; to be
owner/developer, to include all open and closed parking structures, exclusive of one -
implemented prior to each
story detached accessory buildings of less than 120 square feet in floor area, and free
final building and zoning
standing shade structures that are open on at least two sides to sufficiently prevent the
inspection
accumulation of smoke and hot gases. Additionally, alternatives to automatic sprinkler
systems (e.g., self-contained water mist systems) that provide an equivalent level of
fire protection may be approved for other buildings on a case -by -case basis upon
review and approval by the Fire Department.
R:\Projects\WDI13WD10004001Environmental DocumentationWinal SE1MFne1SEIR-022824.do" 4-32
DisneylandForward
Final Subsequent E!R No. 352
Mitigation
Measure/Project
Design Feature
Number
Timing
Measure
Responsible for
Monitoring
_
Fire Department
Completion
NM PS-6
Prior to issuance of each
Plans shall be submitted to ensure that development is in accordance with the City of
building permit
Anaheim Fire Department Standards, including:
a. Overhead clearance shall not be less than 14 feet for the full minimum width of
26 feet for all designated fire access roads.
b. All fire access roads, bridges and underground structures to be used for Fire
Department access shall be designed to support Fire Department vehicles
weighing 78,000 pounds.
c. All underground tunnels shall have sprinklers. Water supplies (hydrants) are
required at the entrances. Standpipes shall also be provided when determined to
be necessary by the Fire Department.
d. Adequate off -site public fire hydrants contiguous to the Specific Plan area and
onsite private fire hydrants shall be provided by the property owner/developer.
The precise number, types, and locations of the hydrants shall be determined
during building permit review. Hydrants are to be a maximum of 300 feet apart.
e. A minimum residual water pressure of 20 psi shall remain in the water system.
Flow rates for all structures shall be a minimum of 1,500 gallons per minute
f. Fire access roads shall be provided with vertical and horizontal clearance in
compliance with Fire Department standards. Any changes to emergency vehicle
access roads shall be included in the overall emergency vehicle access plans for
the Resort area, and maintained by property owner/developer. The Fire Code
Official shall review all proposed changes and determine whether to approve
any deviations from these standards.
g. Temporary structure regardless of type of construction shall be considered
temporary if at a location for less than 6 months. Other than pre -fabricated
construction trailers, structures that are at a location for more than 6 months
shall be provided with a fire suppression system and/or fire notification/life
safety systems applicable to the use of the structure.
h. Integrated Safety Systems (ISS) testing as designed by the property
owner/developer or an updated equivalent shall be required for all attractions on
an annual basis. The property owner/developer shall provide advance notice to
the Fire Department to coordinate witnessing of such testing at the Fire Code
Official's discretion.
R:1Projects1WD113WD10004001Environmental DammentationTinal SEIRTina1_SEIR•022824.dom 4-33
DisneylandForward
Final Subsequent EIR No. 352
Mitigation
Measure/Project
Design Feature
Timing
Measure
Responsible for
Monitoring
Completion
Number
MM PS-7
Prior to issuance of the first
The property owner/developer shall enter into a Fire Operations Agreement with the
Fire Department; City
building permit for the
City of Anaheim to pay or cause to be paid its fair share of the funding to address the
Attorney's Office
DisneylandForward Project
Operations and Community Risk Reduction staffing needs to maintain adequate levels
or as otherwise specified in
of service of response and ongoing fire inspection of the Project and in the Anaheim
the Development
Resort.
Agreement between the City
and Disney
MM PS-8
Prior to approval of street
The water supply system shall be designed by the property owner/developer to provide
Fire Department
improvement plans and
sufficient fire flow pressure and storage for the proposed land use and fire protection
water improvement plans
in accordance with Fire Department requirements.
MM PS-9
Prior to the final building
The property owner/developer shall submit an emergency evacuation response plan for
Fire Department
and zoning inspection for a
review and approval by the Fire Department. The plan shall require posted notices in
hotel
all hotel rooms on emergency evacuation procedures and incorporate ongoing
emergency evacuation training for hotel staff to the satisfaction of the Fire Department.
MM PS-10
Prior to issuance of each
Plans shall be reviewed and approved by the Fire Department as being in conformance
Fire Department
building permit
with the California Fire Code.
MM PS- 11
Prior to the placement of
An all-weather fire access road shall be provided from the roadway system to and on
Fire Department
building materials on a
the construction site and for fire hydrants at all times, as required by the Fire
building site
Department. Such routes shall be paved or, subject to the approval of the Fire
Department, shall otherwise provide adequate emergency access. Every building
constructed must be accessible to Fire Department apparatus. The width and radius of
the driving surface must meet the requirements noted in the Anaheim Municipal Code
and in accordance with City of Anaheim Fire Department Standards.
MM PS-12
Prior to approval of building
The property owner/developer shall provide written evidence to the satisfaction of the
Fire Department
plans
Fire Department that all lockable pedestrian and/or vehicular access gates shall be
equipped with "knox box" devices as required and approved by the Fire Department.
MM PS-13
Prior to approval of on -site
Unless each commercial building is initially connected to separate fire services, an
Fire Department; City
water plans
unsubordinated covenant satisfactory to the City Attorney's Office shall be recorded
Attorney's Office
prohibiting any individual sale of buildings until separate fire services are installed in
the building(s) subject to the sale.
R:1ProjedslVMI13WD10004001Er ironmental DocumentationTinal SEIRTinal_SEIR-022824,docx 4-34
DisneylandForward
Final Subseauent EIR No. 352
Mitigation
Measure/Project
Timing
Measure
Responsible for
Completion
Design Feature
Monitoring
Number
MM PS-14
Prior to the issuance of
The property owner/developer shall locate and design a Fire Substation within the
Fire Department;
construction permits
Theme Park District, in a location approved by the Fire Chief. The Substation shall
Planning & Building
associated with
meet the below minimum criteria, and is subject to the review and approval of the Fire
Department,
development of over 10,000
Chief:
Planning Services
sf within the Theme Park
1. Designated parking stalls, for a medic truck, ambulance, medic golf cart, and 2
Division
District or as otherwise
staff vehicles
specified in the
Development Agreement
2. Equipped with dedicated fiber optic line (services for cable, wife)
between the City of
3. Two offices with two workstations each
Anaheim and Walt Disney
4. Breakroom/kitchen type area
Parks and Resorts U.S., Inc.
5. Day room able to accommodate up to 8 personnel (4 paramedics, 2 ambulance,
2 Community Risk Reduction)
6. Restrooms with showers/locker rooms
MM PS-15
Prior to issuance of building
The property owner/developer shall conduct an analysis to determine if the structure
Fire Department
permits for any structure
would interfere with the Emergency Radio Response Communication (ERRC) System
greater than 75 feet tall
signal. If warranted based on the analysis, the property owner/developer shall be
responsible for installation of new or relocated equipment.
PDF PS-1
Ongoing during project
The existing services and capabilities of the Disneyland Fire Department shall be
Fire Department
operation
maintained for the DisneylandForward Project Site. Existing services include
preconstruction checks, pre -investigation of fires and alarms, preplanning for fires and
evacuations, fire prevention program activities, and monitoring of pyrotechnics and
special effects.
Police
MM PS-16
Prior to issuance of each
The property owner/developer shall pay all applicable police protection fees in the
Police Department
applicable building permit
amount then in effect. Alternatively, the City and the property owner/developer may
enter into alternative financing arrangements.
MM PS-17
Ongoing during operation of
The operator of the public parking facilities shall provide an adequate staff of private
Police Department
the Disneyland Resort
security officers for patrol and surveillance of the facilities.
R:1Projects1WD113WD10004001Environmental DocumentalioMFinal SEIR%Fina1_SEIR-022824.dou 4-35
DisneylandForward
Final Subsequent EIR No. 352
Mitigation
Measure/Project
Timing
Measure
Responsible for
Completion
Design Feature
Monitoring
Number
MM PS-18
Prior to the issuance of the
The property owner/developer shall enter into Police Operations Agreement with the
Police Department;
first building permit for
City of Anaheim to pay or cause to be paid its fair share of the funding for police
City Attorney's Office
DisneylandForward Project
personnel and equipment necessary to meet the service need of the Anaheim Resort as
or as otherwise specified in
determined by the Chief of Police.
the Development
Agreement between the City
of Anaheim and Walt
Disney Parks and Resorts
U.S., Inc.
MM PS-19
Prior to issuance of each
The Police Department shall review the safety measures incorporated into the building
Police Department
building permit for parking
plans for the parking structures within the DisneylandForward Project Site to be
structures
submitted by the property owner/developer. The security measures shall include the
following or other substitute security measures as may be approved by the Police
Department:
• Immediate access in priority criminal cases, where an urgent need or demand
exists and time is of the essence.
• Closed circuit television surveillance and recording equipment or other adequate
security measures reviewed and approved by the Police Department.
NM PS-20
Ongoing during operation of
The property owner/developer shall continue to provide anti -gang, human trafficking,
Police Department
the Disneyland Resort
child exploitation and substance abuse educational programs which are currently
provided for park security cast members.
NM PS-21
Ongoing during operations
The Disneyland Security Department shall be maintained to provide equivalent levels
Police Department
of service to the entire Disneyland Resort. These services will include initial response,
investigation, and report writing. Entry points to the theme parks will be patrolled by
the Disneyland Security Department.
NM PS-22
Prior to issuance of each
The property owner/developer shall submit plans to the Police Department for review
Police Department
building permit for a hotel
and approval by the Chief of Police, or their designee, for safety, accessibility, crime
prevention, and security provisions during both the construction and operative phases
for the purpose of incorporating safety measures in the project design including the
concept of crime prevention through environmental design (e.g., building design,
circulation, site planning, and lighting of parking structures and parking areas).
NIM PS-23
Prior to issuance of each
The project design shall include parking lots and parking structures with controlled
Police Department
building permit for or
access points to limit ingress and egress if determined to be necessary by the Police
including a parking lot
Department and shall be subject to the review and approval of the Police Department.
and/or parking structure
R:1Projects\WDI13WD10004001Emimnmental DocumentationlFinal SEIR%FIna1_SEIR-022824.docx 4-36
DisneylandForward
Final Subsequent EIR No. 352
Mitigation
Measure/Project
Design Feature
Number
Timing
Measure
Responsible for
Monitoring
Completion
MM PS-24
Prior to issuance of the first
The property owner/developer shall coordinate with the Police Department to construct
Police Department;
building permit for the
and maintain a Substation in the Theme Park District which meets the following
Planning & Building
DisneylandForward Project
minimum criteria:
Department,
or as otherwise specified in
the Development
Designated parking stalls, including EV charging stations, for approximately 4-
Planning Services
Division
Agreement between the City
6 EV, 15-20 regular spaces
of Anaheim and Walt
Equipped with dedicated fiber optic line
Disney Parks and Resorts
• Minimum of two private offices
U.S., Inc.
• Conference/briefing room
• Interview room
• Kitchen
• Breakroom
• Locker rooms with showers, restrooms, and lockers
• Enclosed bicycle storage for at least 12 bicycles
• Equipment storage (size equivalent to two offices)
The location and facility components are subject to the review and approval of the
Chief of Police. A designee of the Chief of Police shall be included in the initial design
phase of the Substation, and shall be regularly consulted during design and
construction. Any subsequent modification or relocation to either facility is subject to
the review and approval of the Chief of Police.
R:1Projects1WD113W01000400\Environmental DommentationlFinal SEIRTina1_SEIR-022B24.d— 4-37
DisneylandForward
Final Subsequent EIR No. 352
Mitigation
Measure/Project
Timing
Measure
Responsible for
Completion
Design Feature
Monitoring
Number
MM PS-25
Prior to issuance of the first
The property owner/developer shall coordinate with the Police Department to construct
Police Department;
building permit for
and maintain a Satellite Office in the Southeast District or the Theme Park East Overlay
Planning & Building
development of over 10,000
which meets the following minimum criteria:
Department,
sf in the Southeast District
Designated parking stalls, including 2 -4 EV charging stations, 6 - 8 regular
Planning Services
or Theme Park East Overlay
Division
or as otherwise determined
spaces
in the Development
• Equipped with dedicated fiber optic line
Agreement between the City
• Breakroom
of Anaheim and Walt
• Conference/briefing room
Disney Parks and Resorts
Interview room
U.S., Inc.
• Restrooms
• Enclosed bicycle storage for at least 6 bicycles
The location and facility components are subject to the review and approval of the
Chief of Police. A designee of the Chief of Police shall be included in the initial design
phase of the Satellite Office, and shall be regularly consulted during design and
construction. Any subsequent modification or relocation to either facility is subject to
the review and approval of the Chief of Police.
PDF PS-2
Ongoing during project
The property owner/developer shall continue to provide and expand its Court Liaison
Police Department
operation
program to meet the needs of the Disneyland Resort.
Schools
MM PS-26
Prior to issuance of each
The property owner/developer shall provide proof that school impact fees have been
Planning & Building
building permit
paid consistent with State statute.
Department, Building
Division
R:1Projects1WDR3WD1000400\Environmental Documentatioffinal SEIRTinal_SEIR-022824.doa 4-38
DisneylandFonvard
Final Subsequent EIR No. 352
Mitigation
Measure/Project
Timing
Measure
Responsible for
Completion
Design Feature
Monitoring
Number
PDF PS-3
Ongoing during project
The Disneyland Resort has developed and/or engaged in a series of educational
Planning & Building
operations
programs in cooperation with the local community and regional agencies and
Department, Planning
organizations, designed to enhance and complement the educational opportunities and
Services Division
experiences for the youth. The 10 educational programs that currently exist are
indicated below
1. Anaheim Union High School District's Anaheim's Innovative Mentoring
Experience (AIMS) program
2. Big Brothers & Big Sisters of Orange County's Workplace Mentoring Program
at Anaheim Union High School District
3. United Way's Youth Career Connections and Speakers Bureaus at the Anaheim
Union High School District
4. Anaheim Family YMCA Avanza Program
5. Orange County Asian Pacific Islander Community Alliance's ROOTED Career
Development Program at Anaheim Union High School District
6. Hola Readers at Anaheim Elementary School District
7. Anaheim Elementary School District's Broadway Bound: Empowering Young
Performers in Anaheim
8. Boys & Girls Clubs of Greater Anaheim -Cypress gEARed Up for the Future
9. School Support Programs Girls Inc.'s Girls Meet the Workforce/Project
Accelerate
10. CIF Champion Celebration Girl Scouts of Orange County's Career Exploration
Program — Dreams to Reality
The property owner/developer will continue these programs and/or substitute similar
programs of equal importance.
Parks
PDF PS-4
Ongoing during operations
Substantial area within the Disneyland Resort shall be designed to encourage
Planning & Building
utilization by pedestrians in a park -like setting linking key areas of the project as
Department, Planning
described in the Disneyland Resort Specific Plan.
Services Division;
Community Services
Department, Parks
Division
R:\ProjectslWD113WD10004001Envimnmental DocumentationTinal SEIRTInal_SEIR-022824.docz 4-39
DisneylandForward
Final Subsequent E1R No. 352
Mitigation
Measure/Project
Timing
Measure
Responsible for
Completion
Design Feature
Monitoring
Number
PDF PS-5
Ongoing during operations
The property owner/developer shall provide space(s), outside the ticketed theme park
Planning & Building
gates, easily accessible to theme park guests and non -ticketed visitors, where those who
Department, Planning
have brought their own food can eat. The proximity of amenities such as drinking
Services Division;
fountains, vending machines, and restrooms/locker facilities will be considered in the
Community Services
siting and design or such space(s).
Department, Parks
Division
Libraries
MM PS-27
Prior to the issuance of a
The property owner/developer shall comply with the Anaheim Municipal Code,
Planning & Building
building permit for
Section 17.08.385, Public Library Facilities Services Areas — Payment of Fees
Department, Building
development in the ARSP
Required.
Division
Parking and Theme Park
Overlays, with the exception
of theme park square
footage transferred from the
DRSP
Transportation
MM TRA-1
Ongoing during project
The property owner/developer shall implement the improvements and pay in lieu fees
Public Works
development and operations
described in Table 19 (Recommended Intersection Improvements) and Table 20 (Other
Department, Traffic
Transportation Improvements) of the Operational Traffic Analysis for the
and Transportation
DisneylandForward Project (Gibson 2023), as set forth in Appendix J-2 of Subsequent
Division
EIR No. 352, within the time frames described in those tables. Prior to the issuance of
each building permit, any remaining applicable Traffic Signal Assessment Fees and
Transportation Impact and Improvement Fees (Fees) relating to the building permit site
shall be paid by the property owner/developer to the City of Anaheim in the amounts
determined by the City Council Resolution in effect at the time of issuance of the
building permit, except to the extent such fees may have been previously paid or
satisfied pursuant to one or more separate agreements between Walt Disney Parks and
Resorts U.S., Inc. and the City of Anaheim relating to The Disneyland Resort Project
or The DisneylandForward Project.
MM TRA-2
Prior to approval of the first
The property owner/developer shall irrevocably offer for dedication (with
Public Works
final subdivision map or
subordination of easements), including necessary construction easements, the ultimate
Department,
issuance of the first building
arterial highway right(s)-of-way adjacent to their property as shown in the Circulation
Development Services
permit, whichever occurs
Element of the Anaheim General Plan.
Division; Public Works
first, or as otherwise
Department, Traffic
established in Development
R:1ProjectslWDl13WD10004001Envimnmental DocumentatienTinal SEIRTinal_SEIR-022824.docr 4-40
DisneylandFonvard
Final Subsequent EIR No. 352
Mitigation
Measure/Project
Timing
Measure
Responsible for
Completion
Design Feature
Monitoring
Number
Agreement between the City
and Transportation
of Anaheim and Walt
Division
Disney Parks and Resorts
U.S., Inc. or as approved
pursuant to a Discretionary
Exemption to establish the
timing of Street and Other
Right -of -Way Dedications
and Improvements
(Anaheim Municipal Code
Section 18.40.060
Dedications and
Improvements)
MM TRA-3
Prior to demolition of an
Replacement parking for the existing parking spaces removed will be constructed or
Planning & Building
existing Disneyland Resort
secured.
Department, Planning
parking lot
Services Division;
Access Improvements and Public Parking Facilities Included in Project Design
Public Works
Ongoing during project
(Exhibit 4.3.1b — Interstate 5-West Street/Disneyland Drive Interchange (Showing
Department, Traffic
operation
Entrance to West Parking Facility) and Exhibit 4.3.1c —Interstate 5/Katella Interchange
and Transportation
(Showing Entrance to East Parking Facility)
Division
Public Parking Facilities. New public parking facilities will be constructed at opposite
sides of The Disneyland Resort Specific Plan area to receive traffic from the I-5. A
minimum of 24,500 guest and cast parking spaces will be provided. The West Parking
Area is oriented to receive southbound I-5 traffic, and the parking facilities in the East
Parking Area and adjacent ARSP Parking Overlay will be oriented to receive
northbound I-5 traffic.
MM TRA-4
To be implemented prior to
To be shown on street improvement plans:
Planning & Building
final building and zoning
Department, Planning
inspections for the east and
Improved Access. Access roads leading up to the parking facilities shall be sized to
Services Division;
west parking structures/
accommodate traffic at peak hours, thereby substantially reducing the likelihood of
Public Works
facilities
backups onto City streets and freeway ramps, subject to the approval of the City
Department, Traffic
Engineer.
and Transportation
Division
No cast or guest access or egress will occur from Walnut Street.
R:1Projects%WD113WD10004001Environmental DocumentationTinal 3EIR1F1na1_SEIR-022924.doa 4-41
DisneylandForward
Final Subsequent EIR No. 352
Mitigation
Measure/Project
Timing
Measure
Responsible for
Completion
Design Feature
Monitoring
Number
NM TRA-5
Prior to issuance of each
Speed Parking. Building plans shall show direct ramps to each level of the East and
Planning & Building
building permit; to be
West Parking Area facilities to minimize internal circulation within the garages and
Department, Planning
implemented prior to final
accommodate the project's "speed parking" operation.
Services Division;
building and zoning
Public Works
inspections for both the east
Department, Traffic
and west parking structures
and Transportation
Division
MM TRA-6
To be implemented prior to
To be shown on street improvement plans:
Planning & Building
final building and zoning
Department, Planning
inspection for each parking
Conveyance Systems. In addition to an extensive network of landscaped pedestrian
Services Division;
structure and/or facility
thoroughfares, conveyance systems will transport Disneyland Resort guests around
Public Works
The Anaheim Resort. Guest transportation systems will move guests from the parking
Department, Traffic
facilities to the Theme Park District. The monorail/guest transportation systems shall
and Transportation
move guests within the Theme Park District. Future connections may also be provided
Division
to the Southeast District.
MM TRA-7
To be implemented prior to
To be shown on street improvement plans:
Planning & Building
final building and zoning
Department, Planning
inspections for the second
Theme Park Drop -Off Area. To provide access to the attractions in the Specific Plan
Services Division;
theme park for Phase II; and
area to people staying outside of The Disneyland Resort area, a bus and shuttle drop-
Public Works
if pursued, to be
off area will be located adjacent to Harbor Boulevard north of Disney Way as shown
Department, Traffic
implemented prior to final
on Exhibit 4.4.2a of the Specific Plan; or, in Phase IV, the facility may be located
and Transportation
building and zoning
adjacent or internal to the East Parking Area or the adjacent ARSP Parking Overlay
Division
inspections for the East
Parking Structure(s), or other accessible location in the Theme Park District. The types
Parking Area or adjacent
of vehicles served at this facility may include public and private passenger shuttles and
ARSP Parking Overlay
buses.
parking structure(s) or other
accessible location in Phase
IV
R:IProjectslWDI%3WD10004001Envimnmental DocumentationTinal SEIR1Final_SEIR-022824.d— 4-42
Mitigation
Measure/Project Timing
Design Feature
Number
MM TRA-8 Ongoing during project
operation
Measure
Transportation Demand Management Prop -ram
The need to minimize cast vehicle trips to reduce congestion and improve air quality,
consistent with the goals of both the Air Quality Management Plan (AQMP) of the
South Coast Air Quality Management District (SCAQMD) and with the Regional
Mobility Plan of the Southern California Association of Governments (SCAG), is
recognized. The Disneyland Resort will implement and administer a comprehensive
Transportation Demand Management (TDM) program for all cast, which will strive to
achieve an average vehicle ridership (AVR) goal of 1.5 persons per vehicle and, an
average length of out -of -area guest stay of 1.72 days.
At this point in project development, it is not possible to predict precisely which
programs and activities would be most successful for The Disneyland Resort in
meeting these goals. In addition, property owner/developer will review annually with
the City any changes to the TDM Program and the Program's effectiveness toward
achieving a 1.5 AVR. In consultation with the SCAQMD, the City of Anaheim and
other agencies, and after analyzing the effectiveness of these items, Walt Disney Parks
and Resorts U.S., Inc. will select specific programs for implementation.
Objectives of the TDM program are:
• Increase ridesharing and use of alternative transportation modes by guests.
• Meet the cast 1.5 AVR target.
• Provide a menu of commute alternatives for The Disneyland Resort cast, to
reduce project -generated trips.
• Provide transportation "linkages" to existing and future transportation modes
(other than single -occupant vehicle travel) for both The Disneyland Resort cast
and guests.
Implementation strategies and elements of the TDM program for cast and guest trips
are described below.
Cast
Making a commitment to commute management and trip reduction will become an
integral part of the new -hire training. A menu of TDM program strategies and elements
for both, existing and future cast commute options would be examined, including, but
not limited to, the following:
R:%Projects%WDI13WD10004001Environmental DocumentationTinal SEIR\Final_SEIR-022824.do" 4-43
DisneylandFonaard
Final Subsequent ElR No. 352
Responsible for I Completion
Monitoring
Public Works
Department, Traffic
and Transportation
Division; South Coast
Air Quality
Management District
DisneylandFonaard
Final Subsequent EIR No. 352
Mitigation
Measure/Project
Design Feature
Number
Timing
Measure
Responsible for
Monitoring
Completion
• Onsite Service. Onsite services, such as the food, retail, and other services may
be provided to the cast.
• Ridesharine. An online listing of all cast members living in proximity to The
Disneyland Resort may be developed for the purpose of providing a "matching"
of members with other cast members who live in the same geographic areas and
who could rideshare to The Disneyland Resort.
• Vanuooling. An online listing of all cast members living in proximity to The
Disneyland Resort may be developed for the purpose of matching numbers of
cast who live in geographic proximity to one another and could comprise a
vanpool to The Disneyland Resort.
• Transit Pass. Southern California Rapid Transit District and Orange County
Transportation Authority (including commuter rail) passes may be promoted
through financial assistance and onsite sales to encourage cast to use the various
transit and bus services to The Disneyland Resort from throughout the region.
• Commuter Bus. As commuter "express" bus service expands throughout the
region, passes for use on these lines may be provided for cast members who
choose to use this service. Financial incentives will be provided.
• Shuttle Service. A computer listing of all cast members living in proximity to
The Disneyland Resort may be generated, and a local shuttle program will be
offered to encourage cast members to travel to work by means other than the
automobile.
• Bicycling. A Disneyland Resort Bicycling Program may be developed to offer
a bicycling alternative to cast members. Secure bicycle racks, lockers, and
showers will be provided as part of this program. Maps of bicycle routes
throughout the area would be provided to inform potential bicyclists of these
options.
• Rental Car Fleet. A "fleet vehicle" program may be developed to provide cast
members who travel to work by means other than an automobile with access to
automobiles in case of emergency, medical appointments, etc. This service
would help cast members use alternative modes of transportation by ensuring
that they would be able to have personal transportation in the event of special
circumstances.
• Emereenev Ride Home Program. The program may provide cast members
who rideshare, or use transit or other means of commuting to work, with a
prearranged ride home in a taxi, rental car, shuttle, or other vehicle, in the event
R:1ProjectslWDI%3WD10004001Environmental DommentatlonTinal SEIR%Final_SEIR-022824.docx 4-44
DisneylandForward
Final Subsequent EIR No. 352
Mitigation
Measure/Project
Design Feature
Number
Timing
Measure
Responsible for
Monitoring
Completion
of emergencies during the work shift. In essence, this program addresses the
concerns of the cast member who rideshares and might be stranded without a
vehicle in the event of an emergency.
• Local Hirint Efforts. Continue to actively recruit prospective employees
within 20 miles.
• Tarect Reduction of Lonaest Commute Trip. Design an incentives program
for ridesharing and other alternative transportation modes to put highest priority
on reduction of longest employee commute trips.
• Work Schedule
- Staggered Shifts. The Disneyland Resort cast may work different hours
throughout the daily hours of park operation. A thorough review of cast
shifts would be undertaken to provide the potential for cast shifts during
nonpeak travel times, thus lessening peak hour congestion.
- Compressed Work Week. The Disneyland Resort may review the
possibility of developing a 'compressed work week" program, which
provides for fewer work days but longer daily shifts, as an option for cast
members. This program would help eliminate certain trips on certain days
that would otherwise be generated daily by The Disneyland Resort Cast.
- Telecommutine. The Disneyland Resort employs cast members in a
wide a variety of jobs including clerical, administrative and professional
roles. Sometimes that work can be completed at home. Telecommuting
will be encouraged on a limited basis as operational needs allow.
• Work Environment/Facility Management
- Parkine Management. The Disneyland Resort may develop a parking
management program that provides incentives to those who rideshare or
use transit means other than single -occupant auto to travel to work.
- Management Staff. The existing Disneyland theme park transportation
management staff may be expanded onsite to accommodate new
employees and to explore relationships with adjacent employers to
determine whether joint efforts can lead to greater reductions in VMT by
Disneyland Resort cast members and other employees in the Anaheim
Resort.
R:1Projecffi1WD113WD10004001Environmental DocumentationTinal SEIRWinel_SEIR-022824.do 4-45
DisneylandForward
Final Subseauent E!R No. 352
Mitigation
Measure/Project
Design Feature
Number
Timing
Measure
Responsible for
Monitoring
Completion
- Amenities. Transit systems, transit shelters, bicycle storage areas, and
other amenities may be provided with efficient parking management for
cast and guests.
- Access. Preferential access to high occupancy vehicles and shuttles may
be provided.
- Delivery Management. Schedule deliveries in nonpeak traffic
congestion hours to the extent reasonably practicable.
• Financial Incentives
In addition to the above items, certain financial incentives will be integrated into
The Disneyland Resort TDM program, such as:
- Financial Incentive for Ridesharing and/or Public Transit. Currently,
federal law provides tax-free status for up to $300 per month per
employee contributions to employees who vanpool or use public transit
(including commuter rail and/or express bus pools). In addition, The
Disneyland Resort provides free OCTA passes and a 75% subsidy (up to
$100/month) for other transit passes.
- Financial Incentive for Bicycling_and Walking. Cast members may be
offered financial incentives for bicycling to work; they would be
provided with secure bicycle racks, lockers, and showers. Cast members
may also receive a cash incentive for reporting a bike or walk commute.
- Financial Incentive for Carpooling. Cast members may be offered a
cash incentive for carpooling to work.
- Special "Premium" for the Partici iation and Promotion of Trip
Reduction. Tickets/passes to project theme parks and/or vacations could
be offered to employees who recruit other cast members for vanpool,
carpool, or other Disney trip reduction programs.
• Guests
- Even though visitors to The Disneyland Resort are estimated to average
nearly four persons per vehicle, additional programs and incentives could
and will be provided to encourage even more guest use of ridesharing,
transit, and other modes of travel to and from The Disneyland Resort.
The property owner/developer is currently developing a list of potential
programs and is working with the City of Anaheim and OCTA on the
R:1Projects1WD113WDI0004001Environmental DocumenlationlFinal SEIRTinal_SEIR-022824.docz 4-46
DisneylandFomard
Final Subsequent E/R No. 352
Mitigation
Measure/Project
Design Feature
Timing
Measure
Responsible for
Monitoring
Completion
Number
provision of convenient linkages to other modes of transportation.
Marketing materials for The Disneyland Resort will describe it as an
"auto -free" zone with a range of transportation amenities where cars are
not needed.
- Bicycle spaces for guests shall be visible from the primary entrance,
illuminated at night, and protected from damage from moving or parked
vehicles.
• Construction Contractors
The property owner/developer shall provide notification to the general
construction contractors regarding the coordination of rideshare services for
construction employees provided by the Anaheim Transportation Network
(ATN).
MM TRA-9
Ongoing during project
The property owner/developer shall continue to participate in a clean fuel shuttle
Public Works
operations
program, and shall participate in the Anaheim Transportation Network (ATN) in
Department, Traffic
conjunction with the ongoing operation of The Disneyland Resort, including the
and Transportation
Disney ARSP Properties. Proof of compliance with this measure shall be submitted to
Division
the City Traffic Engineer.
MM TRA-10
Ongoing during
If Anaheim Police Department or Anaheim TMC personnel are required to provide
Police Department;
construction
temporary traffic control services, the property owner/developer shall reimburse the
Public Works
City, on a fairshare basis, if applicable, for reasonable costs associated with such
Department, Traffic
services.
and Transportation
Division
MM TRA-11
Ongoing during project The property owner/developer will establish an onsite public information office (which
Public Works
operations is conveniently and accessibly located) where construction scheduling and phasing
Department, Traffic
information will be available to the public. The public information office shall be open
and Transportation
during construction hours. A telephone "hotline" will be provided to the community to
Division
allow members of the public to call the office with questions or comments during
business hours. At least one liaison officer will be staffed at the office. The liaison
officer shall be available to answer questions from the public and shall coordinate with
the City of Anaheim, other public agencies, and major developers in the area regarding
the coordination of construction activities and infrastructure improvements. The City
shall be provided with a monthly summary of the calls received and follow-up actions.
R:1Projects%WDI13WDI0004001Environmental DocumentatioMFinal SEIRWinal_SEIR-022824.dom 4-47
Mitigation
Measure/Project
Design Feature Timing
Number
Measure
MM TRA-12 Pri7issu�ancee of each The property owner/developer shall submit a Traffic Mitigation and Construction
buifor The Phasing and Control Plan. To the extent needed, as determined by the Public Works
Disrt or, any Department, the Traffic Mitigation and Construction Phasing and Control Plan shall
othcifically identify the following:
prosmeasure
MM TRA-13 Prior to approval of each
grading plan or issuance of
each demolition or building
permit, whichever occurs
first; implemented during
grading and construction
MM TRA-14 Prior to approval of each
grading plan or issuance of
each demolition or building
permit, whichever occurs
first; implemented during
grading and construction
MM TRA-15 Prior to approval of each
grading plan or issuance of
each demolition or building
permit, whichever occurs
first; implemented during
construction
a. A Construction Staging Area Plan showing the location and size of the
construction staging area. The Plan shall also show how the staging area will be
screened from view in compliance with the City of Anaheim Municipal Code.
A Truck Route Plan identifying truck routes along arterials, avoiding residential areas
to the extent feasible and in compliance with the Sound Pressure Level Ordinance. The
Plan shall show conformance with the external noise limits for construction between 7
p.m. and 7 a.m. The Plan shall also prohibit construction traffic on residential streets
where improvements are not planned and shall provide measures to ensure that truck
drivers are directed away from residential streets and travel on approved routes only.
Measures to assist in guiding truck movement on the arterial roadway system include,
but are not limited to, provision of truck route maps to truck drivers and placement of
flagpersons and construction signage at appropriate locations. The Truor repaving
ructck Route Plan
shall provide for monitoring of street conditions and potential repairing and/
by property owner/developer after completion of constion as required or the City
Engineer.
A Construction Traffic Management Plan which includes mechanisms to reduce
construction -related traffic congestion which shall be implemented during grading and
construction, including, but not limited to, the following:
I. Configure construction parking to minimize onsite and offsite traffic
interference.
2. Minimize obstruction of through -traffic lanes.
3. Provide flagpersons to guide traffic, as determined in the plan.
A Trip Reduction Plan for construction crew vehicles shall be prepared to reduce
Potential vehicle trips on the road and identify parking locations for construction
employees and equipment.
R:IProjects1WD113WD10004001Environmental DocumentationTinal SEIRIFnaI_SEIR-022824.docx
4-48
DisneylandForward
Final Subsequent EIR No. 352
Responsi4forMonitoompletion
Public Works
Department, Traffic
and Transportation
Division
Public Works
Department, Traffic
and Transportation
Division
Public Works
Department, Traffic
and Transportation
Division
Public Works
Department, Traffic
and Transportation
Division
DisneylandForward
Final Subsequent E1R No. 352
Mitigation
Measure/Project
Timing
Measure
Responsible for
Completion
Design Feature
Monitoring
Number
MM TRA-16
Prior to approval of each
A Traffic Management Plan for phasing of roadway improvements, specifying the
Public Works
building permit
sequencing of construction to do the following:
Department, Traffic
1. Coordinate scheduling with other planned construction in the area.
and Transportation
Division
2. Coordinate scheduling with other infrastructure improvements to allow them to
be facilitated efficiently during roadway improvements, such as sewer, storm
drain, and water line improvements.
3. Outline procedures for any required traffic detours during construction,
including provision of tour bus stops.
4. Phase each roadway improvement to allow access to all existing
businesses/residential areas. In some instances this will require lane -by -lane
renovation, temporary bypass roads, or traffic reroutes.
5. Employ vertical shoring as often as possible. This will minimize the amount of
road surface that will be disturbed at a given location.
6. Sequence the construction of each roadway improvement to minimize
disruption to residents and businesses.
7. Establish offsite parking and staging areas, where practical and possible, to
minimize the impact to existing level of service on adjacent roadways. These
offsite parking and staging areas will allow a dispersion of traffic flow to
noncritical areas and will encourage bussing of construction workers from the
offsite areas to the construction sites.
8. Identify how the project improvement construction schedules and haul routes
will be coordinated with other areawide improvements. The property
owner/developer shall coordinate with the City of Anaheim Traffic
Management Center (TMC), the Anaheim Convention Center and area hotels to
ensure continued operations of these facilities, as well as the continued operation
of The Disneyland Resort.
MM TRA-17
Ongoing during project
The property owner/developer shall submit a quarterly update report showing
Public Works
construction
construction activities for the upcoming quarter which shall include traffic mitigation
Department, Traffic
and control planning and construction scheduling.
and Transportation
Division
MM TRA-18
Prior to approval of each
The property owner/developer shall show how the project will be in compliance with
Public Works
grading plan
the Traffic Mitigation and Construction Phasing and Control Plan.
Department, Traffic
and Transportation
Division
R:1Projects%WDI13WD10004001Environmental Documenta8onTinal SEIR1Fnal_SEIR-022824.dom 4-49
DisneylandFonvard
Final Subsequent EIR No. 352
Mitigation
Measure/Project
Timing
Measure
Responsible for
Completion
Design Feature
Monitoring
Number
MM TRA-19
Prior to the issuance of the
The location of any proposed gates across a driveway shall be subject to the review
Public Works
first building permit
and approval of the City Engineer. Gates shall not be installed across any driveway or
Department, Traffic
private street in a manner which may adversely affect vehicular traffic on the adjacent
and Transportation
public streets. Installation of any gates shall conform to the current version of
Division
Engineering Standard Detail No. 475.
_
MM TRA-20
Prior to the issuance of
Plans shall show that all driveways shall be constructed with a minimum fifteen (15)
Public Works
building permits
foot radius curb returns as required by the City Engineer, unless otherwise approved
Department, Traffic
by the City Engineer.
and Transportation
Division
MM TRA-21
Prior to the issuance of
Security in the form of a bond, certificate of deposit, letter of credit, completion
Public Works
building permits or final
guarantee, or cash, in an amount and form satisfactory to the City Engineer shall be
Department,
map approval, whichever
posted with the City to guarantee the satisfactory completion of all engineering
Development Services
occurs first
requirements of the City of Anaheim, including preparation of improvement plans and
Division
installation of all improvements, such as curbs and gutters, sidewalks, water facilities,
street grading and pavement, sewer and drainage facilities and other appurtenant work,
as required by the City Engineer and in accordance with the specifications on file in
the office of the City Engineer, as may be modified by the City Engineer. Installation
of said improvements shall occur prior to final building and zoning inspections.
MM TRA-22
Prior to approval of each
The following Street Design Elements shall be shown on each tentative tract or parcel
Public Works
tentative tract or parcel map
map:
Department,
a. Street cross -sections, including dimensions, labels, circulation designation (i.e.,
Development ServicesDivision
Resort Secondary) and whether public or private.
b. Street grades and vertical alignment.
c. Horizontal alignment, including radii, and cul-de-sac radii.
Tribal Cultural Resources
MM TCR-1
Prior to the issuance of any
Tribal Cultural Resources Monitoring. The property owner/developer or contractor
Planning & Building
permits allowing ground-
as designee shall provide evidence in the form of an executed Agreement to the City
Department, Planning
disturbing activities that
of Anaheim Planning and Building Department that they have retained a qualified
Services Division
cause excavation to depths
Native American tribal monitor to provide third -party monitoring during construction -
greater than current
related ground disturbance activities and to recover and catalogue tribal resources as
foundations
necessary. The tribal monitor shall be from or approved by the Gabrieleiio Band of
Mission Indians — Kizh Nation. The agreement shall include (i) professional
qualifications of Native American monitor; (ii) detailed scope of services to be
provided including but not limited to pre -construction education, observation,
R:1ProjectslWDI%3WD1000400%Envimnmental DowmentationTinal SEIRTinal_SEIR-022824.docz 4-50
DisneylandFonaard
Final Subsequent E1R No. 352
Mitigation
Measure/Project
Timing
Measure
Responsible for
Completion
Design Feature
Monitoring
Number
I
1:
evaluation, protection, salvage, notification, and/or curation requirements, as
_
applicable, with final documentation/report to Public Works Inspector; (iii) contact
information; (iv) communication protocols between Contractor and Monitor for
scheduling to facilitate timely performance; (v) acknowledgment that if the tribal
monitor is unavailable or unresponsive based on terms stipulated in the agreement,
property owner/developer or contractor as designee may contract with another
qualified tribal monitor acceptable to the City. The selection of the qualified
professional(s) shall be subject to City acceptance based on generally accepted
professional qualifications and certifications, as applicable. The cover sheet of the
grading plans shall include a note to identify that third party tribal monitoring is
required during excavation and grading activities in accordance with the City -approved
Agreement. Contact information for approved tribal monitor shall be provided by the
contractor to the City inspector at the pre -construction meeting.
SR TCR-I Prior to approval of any The project property owner/developer shall coordinate with the City Planning Planning & Building
amendment to the ARSP or Department to undergo a solicitation of Native American consultation pursuant to Department, Planning
the City of Anaheim Senate Bill (SB) 18 (California Government Code, Section 65352.3). Services Division
General Plan
Utilities and Service Systems
Public Services and Utilities - Water
MM UTIL-I
Prior to issuance of building
Among the water conservation measures to be shown on plans and implemented by the
Utilities Department,
permits
property owner/developer within the Specific Plan area include the following:
Resource Efficiency
• Use of low -flow sprinkler heads in irrigation system.
Section; Planning &
Building Department,
• Use of waterway re -circulation systems.
Building Division
• Low -flow fittings, fixtures, and equipment, including low flush toilets and
urinals.
• Use of self -closing valves on drinking fountains.
• Use of reclaimed water for irrigation and washdown when it becomes available.
• Continuation of the existing cooling tower recirculation system.
• Use of efficient irrigation systems such as drip irrigation and automatic systems
which use moisture sensors.
• Low -flow shower heads in hotels.
R:1Projects1WD113WD1000400\Environmental DacumentationTinal SE1MFinel_SEIR-022824.do 4-51
DisneylandForward
Final Subsequent E1R No. 352
Mitigation
Measure/Project
Timing
Measure
Responsible for
Completion
Design Feature
Monitoring
Number
• Water -efficient ice machines, dishwashers, clothes washers, and other water -
using appliances.
• Use of irrigation systems primarily at night when evaporation rates are lowest.
• Provide information to the public in conspicuous places regarding water
conservation.
• Use of water -conserving landscape plant materials wherever feasible.
• Use of vacuum and other equipment to reduce the use of water for washdown
of exterior areas.
MM UTIL-2
Prior to each final building
The property owner/developer shall submit a certified water audit for landscape
Utilities Department,
and zoning inspection
irrigation systems except for areas within the Theme Parks.
Resource Efficiency
Section
MM UTIL-3
Prior to issuance of each
All water supply planning for the project will be closely coordinated with, and be
Utilities Department,
building permit
subject to the review and final approval of, the Public Utilities Department, Water
Water Engineering
Engineering Division and Fire Department.
Division; Fire
Department
MM UTIL-4
Prior to issuance of each
Water pressure greater than 80 pounds per square inch (psi) shall be reduced to 80 psi
Utilities Department,
building permit
or less by means of pressure reducing valves installed at the property
Water Services
owner/developer's service.
MM UTIL-5
Prior to issuance of building
Plans shall specifically show that the water meter and backflow equipment and any
Utilities Department,
permits
other large water system equipment will be installed to the satisfaction of the Public
Water Services
Utilities Department, Water Engineering Division, aboveground and behind the
building setback line in a manner fully screened from all public streets and alleys and
in accordance with Ordinance No. 4156. Prior to the final building and zoning
inspections, the water meter and backflow equipment and any other large water system
equipment shall be installed to the satisfaction of the Public Utilities Department,
Water Engineering Division, in accordance with the building permit plans.
R."Projects%WD113WD10004001Environmental DocumentationTinal SEIRTinal_SEIR-022824.dau 4-52
DisneylandForward
Final Subsequent E!R No. 352
Mitigation
Measure/Project
Design Feature
Number
Timing
Measure
Responsible for
Monitoring
Completion
MM UTIL-6
Prior to final building and
A separate water meter shall be installed for landscape water on all projects where the
Utilities Department,
zoning inspections
landscape area exceeds 1,000 square feet for non-residential uses in accordance with
Water Services
Ordinance No. 6160.
MM UTIL-7
Ongoing during project
The property owner/developer shall implement the following required improvements
Utilities Department,
development and operations
to the water supply system, in accordance with Anaheim's Water Rates, Rules and
Water Services
Regulations, Water Services Administrative Procedures and Design Guidelines
(APDG), and Water Services Standard Specifications (WSSS), within the timeframes
described below or as further determined by the Public Utilities Department, Water
Engineering Division. The cost of all Main Extensions, Main Enlargements,
abandonments, relocations, and easements documents shall be paid for by the property
owner/developer of the properties served by these mains in accordance with Rule 15A.
• In the Theme Park District, west of Disneyland Drive, all new fire water
connections, including but not limited to, those that would serve, private fire
hydrants, in The Disneyland Resort shall be made to water mains served by the
335 Pressure Zone. Specifically, no new fire water connections are permissible
on existing water mains in Walnut Street or Magic Way. Any new fire
connections for buildings adjacent to these mains shall connect to the 20-inch
water main in Disneyland Drive.
• The Southeast District shall be served by at least two points of connection with
internal looping.
o Any new water service connections along Harbor Boulevard shall require
the construction of a 12-inch water main from Convention Way intersection
to a point approximately 400-ft north of the intersection.
o Any new connection to the existing water main in Clementine Street, north
of Orangewood Avenue, shall require replacement of the existing 8-inch
water main with a new 12-inch water main.
• Abandon the existing 12-inch water main within the Esplanade between Harbor
Boulevard and Disneyland Drive. This work shall be completed concurrently
with any proposed improvements along Disneyland Drive or Harbor Boulevard.
• New easements may be required where public water infrastructure are located
within private property through abandonment(s) of a public right-of-way. Such
easements shall limit improvements that impact access for operation and
maintenance of existing facilities. Alternatively, the property owner/developer
may abandon and/or relocate existing public water infrastructure provided the
property owner/developer prepares an analysis to determine any associated and
R:1ProjectskVVD113WD10004001Er ironmental DocumentationWinal SEIR1Final_SEIR-022824.docz 4-53
DisneylandForward
Final Subsequent E1R No. 352
Mitigation
Measure/Project
Timing
Measure
Responsible for
Completion
Design Feature
Monitoring
Number
appropriate improvements due to the work. The property owner/developer shall
submit the analysis and any associated improvement plans to the Public Utilities
Department, Water Engineering Division for review and approval.
• Prior to issuance of building permits, the property owner/developer shall submit
hydraulic analyses to determine the adequacy of existing and proposed facilities
if required by the Public Utilities Department, Water Engineering Division.
Public Services and Utilities — Wastewater/Sewer
MM UTIL-8
Prior to issuance of any
The property owner/developer shall prepare a Sewer Study for review and approval by
Public Works
Building Permit for any new
the City Engineer, funded by the property owner/developer. Said Sewer Study shall
Department,
hotel development within
evaluate whether there is adequate capacity in the Harbor Boulevard sewer system to
Development Services
the Theme Park District that
accept the flow from the proposed new hotel use. The Sewer Study shall determine
Division and Design
proposes a portion or the
whether the proposed hotel project would create a deficiency in the Harbor Boulevard
Division
entirety of the hotel
sewer system or the downstream City sewer system. If the Sewer Study shows there
project's sewer flow to
would be deficiency in the Harbor Boulevard sewer system or the downstream sewer
discharge to the City sewer
system, the Sewer Study shall identify the required sewer system upgrades. If a sewer
system on Harbor
system upgrade is required, the property owner/developer shall be responsible for the
Boulevard, north of Katella
design and construction of the upgrade to the sewer system and all associated
Avenue
improvements [collectively, "Sewer Improvements"]. The City -identified and
approved cost of the Sewer Improvements may be credited toward the applicable sewer
impact fees for the hotel project upon completion of the Sewer Improvements and
acceptance by the City. The design of the Sewer Improvements and the related sewer
improvement plans shall be completed prior to issuance of any Building Permit for the
hotel project and the sewer improvement plans shall identify all associated
improvements required for the required Sewer Improvements. Construction of Sewer
Improvements shall be completed prior to final building and zoning inspections for the
hotel. If no sewer system upgrade is required, the developer shall be required to pay
the applicable sewer impact fees, pursuant to A.M.C. 10. 12.085, with applicable credits
applied for sewer flows from existing uses to be removed.
NM UTIL-9
Prior to issuance of a
The property owner/developer shall prepare a Sewer Study for review and approval by
Public Works
plumbing permit resulting in
the City Engineer, funded by the property owner/developer. Said Sewer Study shall
Department,
a cumulative flow of more
evaluate whether there is adequate capacity in the Harbor Boulevard sewer system to
Development Services
than 50 gpm peak in the
accept the proposed redirected flow. The Sewer Study shall determine whether the
Division and Design
Theme Park District
proposed redirected flow would create a deficiency in the Harbor Boulevard sewer
Division
resulting in redirected
system or the downstream City sewer system. If the Sewer Study shows there would
existing sewer flows that
be deficiency in the Harbor Boulevard sewer system or the downstream sewer system,
currently do not flow to
the Sewer Study shall identify the required sewer system upgrades. If a sewer system
R:1Projects1WDI13WD100040MEmironmental DocumentationTinal SEImFinal_SEIR-022824.dou 4-54
DisneylandForward
Final Subseauent E!R No. 352
Mitigation
Measure/Project
Design Feature
Number
Timing
Measure
Responsible for
Monitoring
Completion
Harbor Boulevard to instead
upgrade is required, the property owner/developer shall be responsible for the design
flow to Harbor Boulevard
and construction of the upgrade to the sewer system and all associated improvements
via non -gravity flow (e.g.
[collectively, "Sewer Improvements"]. The City -identified and approved cost of the
lift station, force main,
Sewer Improvements may be credited toward the applicable sewer impact fees for the
ejector pump, etc.)
hotel project upon completion of the Sewer Improvements and acceptance by the City.
The design of the Sewer Improvements and the related sewer improvement plans shall
be completed prior to issuance of any Building Permit for the hotel project and the
sewer improvement plans shall identify all associated improvements required for the
required Sewer Improvements. Construction of Sewer Improvements shall be
completed prior to final building and zoning inspections for the hotel. If no sewer
system upgrade is required, the developer shall be required to pay the applicable sewer
impact fees, pursuant to A.M.C. 10.12.085, with applicable credits applied for sewer
flows from existing uses to be removed.
MM UTIL-10
Prior to issuance of the first
The property owner/developer shall prepare a Sewer Study for review and approval by
Public Works
building permit for
the City Engineer, funded by the property owner/developer. Said Sewer Study shall
Department,
development of over 10,000
evaluate whether the total sewer flow proposed to the Katella Avenue sewer system,
Development Services
sf in the Southeast District
east of Harbor Boulevard, for development authorized by the DisneylandForward
Division and Design
or Theme Park East Overlay
project for the Theme Park East Overlay/Southeast District does not exceed a peak
Division
flow of 285 gpm. And that the total sewer flow proposed to be directed to the Harbor
Boulevard sewer system, south of Katella Avenue, for development authorized by the
DisneylandForward project for the Theme Park East Overlay/Southeast District does
not exceed a peak flow of 2,000 gpm (total allowable development within Theme Park
East Overlay/Southeast District). If the projected sewer effluent flow exceeds these
stipulated amounts for either the Katella Avenue or Harbor Boulevard sewer system,
the Sewer Study shall determine whether the development project creates a deficiency
in the Katella Avenue sewer system, east of Harbor Boulevard, or the Harbor
Boulevard sewer system, south of Katella Avenue, sewer collections systems and the
downstream City sewer system. Should a deficiency be created, the Sewer Study shall
identify the required sewer system upgrades and improvements ("Sewer
Improvements"). If Sewer Improvements are required, the property owner/developer
shall be responsible for the design and construction of the Sewer Improvements. The
City -identified and approved cost of the sewer improvements may be credited toward
the applicable sewer impact fees for the development project upon completion of the
Sewer Improvements and acceptance by the City. The design of the Sewer
Improvements and the sewer improvement plans shall be completed prior to issuance
of any Building Permit for development in the Theme Park East Overlay/Southeast
District and shall identify all associated improvements required for the required Sewer
R:1ProjectslWDI%3WD1000400%Environmental DocumentatlonTinal SEIRT1nal_SEIR-022824.docx 4-55
DisneylandForward
Final Subsequent E!R No. 352
Mitigation
Measure/Project
Design Feature
Timing
Measure
Responsible for
Monitoring
Completion
Number
Improvements. Construction of Sewer Improvements shall be completed prior to the
first final building and zoning inspection for development within the Theme Park East
Overlay/Southeast District. If no improvement is required, the developer shall be
required to pay the applicable sewer impact fees, pursuant to A.M.C. 10.12.085.
MM UTIL-11
Prior to issuance of any
The property owner/developer shall prepare a Sewer Study for review and approval by
Public Works
Building Permit for any new
the City Engineer, funded by the property owner/developer. Said Sewer Study shall
Department,
hotel development within
evaluate the sewer flow from the hotel(s) directed to Clementine Street and ultimately
Development Services
the Parking Overlay
Katella Avenue. Sewer improvements required to address deficiencies in the sewer
Division and Design
(between Harbor Boulevard
systems in Clementine Street and/or Katella Avenue, east of Harbor Boulevard, shall
Division
and Manchester Avenue)
be the sole responsibility of the property owner/developer ("Clementine and Katella
Sewer Improvements"). Should a deficiency be created, the Sewer Study shall identify
the required sewer system upgrades and improvements. If a sewer system upgrade is
required, the property owner/developer shall be responsible for the design and
construction of the Clementine and Katella Sewer Improvements and all associated
improvements. The City -identified cost of the Clementine and Katella Sewer
Improvements may be credited toward the applicable sewer impact fees for the hotel
project(s) upon completion of the Sewer Improvements and acceptance by the City.
The design of the Clementine and Katella Sewer Improvements and the sewer
improvement plans shall be completed prior to issuance of any Building Permit for the
hotel project(s) and identify all associated improvements required for the Sewer
Improvements. Construction of sewer improvements shall be completed prior to
issuance of the first certificate of occupancy for the first hotel development. If no
improvement is required, the developer shall be required to pay the applicable sewer
impact fees, pursuant to A.M.C. 10.12.085.
Public Services and Utilities — Storm Drains
MM UTIL-12
Prior to approval of a final
The property owner/developer shall participate in the City's Master Plan of Storm
Public Works
subdivision map, or
Drains and related Infrastructure Improvement (Fee) Program to assist in mitigating
Department,
issuance of a grading or
existing and future storm drainage system deficiencies as follows:
Development Services
building permit, whichever
occurs first
The property owner/developer shall submit a report for review and approval by the
Division
City Engineer to assist with determining the following:
a. If the specific development/redevelopment does not increase or redirect current
or historic storm water quantities/flows, then the property owner/developer's
responsibility shall be limited to participation in the Infrastructure Improvement
(Fee) Program to provide storm drainage facilities in 10- and 25-year storm
frequencies and to protect properties/structures for a 100-year storm frequency.
R:1Projects%WDI13WD10004001Environmental DocumentationTinal SEIR1Rna1_SEIR-022024.doa 4-56
DisneylandForward
Final Subseauent OR No. 352
Mitigation
Measure/Project
Timing
Measure
Responsible for
Completion
Design Feature
Monitoring
Number
b. If the specific development/redevelopment increases or redirects the current or
historic storm water quantity/flow, then the property owner/developer shall be
required to guarantee mitigation to the satisfaction of the City Engineer and City
Attorney's office of the impact prior to approval of a final subdivision map or
issuance of a grading or building permit, whichever occurs first, pursuant to the
improvements identified in the Master Plan of Drainage for the South Central
Area. The property owner/developer shall be required to install the storm
drainage facilities as recommended by the Master Plan of Drainage for the South
Central Area to provide storm drainage facilities for 10- and 25-year storm
frequencies and to protect properties/structures for a 100-year storm frequency
prior to acceptance for maintenance of public improvements by the City or final
building and zoning inspection for the building/structure, whichever occurs first.
Additionally, the property owner/developer shall participate in the Infrastructure
Improvement (Fee) Program as determined by the City Engineer which could
include fees, credits, reimbursements, or a combination thereof. As part of
guaranteeing the mitigation of impacts on the storm drainage system, a storm
drainage system improvement phasing plan for the project shall be submitted by
the property owner/developer to the City Engineer for review and approval and
shall contain, at a minimum, (1) a layout of the complete system; (2) all facility
sizes, including support calculations; (3) construction phasing; and, (4)
construction estimates.
MM UTIL-13
Prior to the issuance of
The City shall require that building plans indicate that new developments will
Public Works
building permits
minimize stormwater and urban runoff into drainage facilities by incorporating design
Department,
features such as detention basins, on -site water features, and other strategies.
Development Services
Division
Public Services and Utilities — Electricity
MM UTIL-14
Prior to issuance of each
In order to conserve energy, the Disneyland Resort shall comply with the California
Utilities Department,
building permit; to be
Energy Code (Title 10), which may include the following:
Resource Efficiency
implemented prior to each
final building and zoning
Consultation with the City energy -conservation experts at the Anaheim Public
Section
inspection
Utilities Community and Sustainability Division for assistance with energy -
conservation design features.
• Use of high -efficiency air conditioning systems, connected if feasible to a
computerized central energy management system, and meeting all control,
scheduling and load efficiency requirements of the California Energy Code
(Title 24, Building Efficiency Standards).
R:1Projects1WDIQWD10004001Environmental Documentation7inal SEIRIFinal_SEIR-022824.docx 4-57
DisneylandForward
Final Subsequent EIR No. 352
Mitigation
Measure/Project
Timing
Measure
Responsible for
Completion
Design Feature
Monitoring
Number
• Use of electric high -efficiency (NEMA) motors intended to conserve energy.
• While recognizing the unique lighting apparatus required for some theme park
uses, use of motion sensing lightswitch devices and light -emitting diode (LED)
energy -efficiency lighting fixtures for indoor and outdoor lighting when
feasible, T8 lamps, metal hallide and/or high-pressure sodium (HID) lamps.
• Incorporation of electric vehicle chargers into parking structures.
If the property owner/developer incorporates grid -tied renewable energy generation
Utilities Department,
MM UTIL-15
Prior to issuance of a
building permit
systems into the project, they shall comply with the Anaheim Public Utilities
Resource Efficiency
Department's most recent Interconnection Guidelines.
Section
MM UTIL-16
Two to five years prior to
The property owner/developer shall provide Anaheim Public Utilities Department
Utilities Department,
energizing new switching
electrical engineering staff with its forecasted electric demand and schedules to allow
Electric Services
stations
for sufficient lead time for planning, design, engineering, materials procurement, and
Division
construction of new electrical facilities, if required, to accommodate the Project's
additional or modified electrical demand. Forecasts must be at least two to five years:
e.g., two years for the construction of up to two line extensions and five years for the
construction of three line extensions or a new substation.
Public Services and Utilities — Natural Gas
As discussed in Draft Subsequent EIR No. 352, Section 5.16, Utilities and Service Systems, Natural Gas, incorporates MMs Section 5.5, Energy.
Public Services and Utilities — Solid Waste
MM UTIL-17
Ongoing during theme park
The property owner/developer shall implement a solid waste management plan which
Public Works
operations and prior to final
has been reviewed and approved by the Public Works Department to ensure that the
Department, Streets
building and zoning
project plans comply with AB 939, SB 1383 related to reducing organic waste in
and Sanitation Division
inspections of new theme
landfill, the Solid Waste Reduction Act of 1989, as administered by the City of
park development
Anaheim, and the County's and City's Integrated Waste Management Plans.
Implementation of said plan shall commence upon occupancy and shall remain in full
effect as required by the Street and Sanitation Division and may include the following
plan components:
a. Detailing the locations and design of on -site recycling facilities.
b. Providing on -site recycling receptacles to encourage recycling.
c. Complying with all Federal, State, and City regulations for hazardous material
disposal.
d. Continuing participation in the City of Anaheim's voluntary "Recycle
Anaheim," program or other substitute program as may be developed by the
City.
R:1Projects%WD113WD10004001Environmental DocumentationTinal SEIR\Rna1_SEIR-022824.dom 4-58
DisneylandFonvard
Final Subsequent E1R No. 352
Mitigation
Measure/Project
Timing
Measure
Responsible for
Completion
Design Feature
Monitoring
Number
In order to meet the requirements of the Solid Waste Reduction Act of 1989 (AB
939), the property owner/developer shall implement numerous solid waste
reduction programs at the Disneyland Resort, including:
• Facilitating paper recycling by providing chutes or convenient locations for
sorting and recycling bins.
• Facilitating cardboard recycling (especially from retail areas) by providing
adequate space and centralized locations for collections and baling.
• Facilitating glass recycling (especially from restaurants) by providing adequate
space for sorting and storing.
• Providing trash compactors for nonrecyclable materials whenever feasible to
reduce the total volume of solid waste and the number of trips required for
collection.
• Prohibition of curbside pick-up within The Disneyland Resort.
MM UTIL-18
Ongoing during project
The existing solid waste recycling and waste minimization practices at The Disneyland
Public Works
operation
Resort shall be expanded as feasible to serve new development in The Disneyland
Department, Streets
Resort. Existing practices include:
and Sanitation Division
• Usage of recycled paper products for stationary, letterhead, and packaging.
• Recovery of materials such as aluminum and cardboard.
• Collection of office paper for recycling.
• Collection of polystyrene (foam) cups for recycling.
• Collection of glass, plastic, kitchen grease, laser printer, toner, cartridges, oil,
batteries, and scrap metal for recycling or recovery.
MM UTIL-19
Prior to issuance of building
Plans shall show that trash storage areas shall be provided and maintained in a location
Public Works
permits
acceptable to the City of Anaheim Department of Public Works, Streets and Sanitation
Department, Streets
Division. On an ongoing basis, trash storage areas shall be provided and maintained in
and Sanitation Division
Ongoing during project
accordance with approved plans on file with said Department.
operation
MM UT1L-20
Prior to issuance of each
The property owner/developer shall demonstrate that the plans include provisions for
Planning & Building
building permit
the installation of trash and recycle receptacles near all benches and near high traffic
Department, Planning
areas such as plazas, transit stops and retail and dining establishments.
Services Division
R:%ProjectslWDP3WD10004001Environmental DocumentationlFinal SEIRTinel_SEIR-022924.docx 4-59
DisneylandFonvard
Mitigation
Final Subsequent EIR No. 352
Measure/Project
Design Feature Timing
Number Measure Responsible for
Monitoring
MM UTIL-21 Ongoing during project Upon City request and no less than annually or more than semi-annuall the ro e
operation Building
owner/developer shall prepare and submit to the Planning & Building Directororthe r DepartmePlanning nt, Planning
designee a consolidated Construction Waste Management Report for all development Services Division
projects on Disney Properties demonstrating that at least 75 percent of non -hazardous
construction and demolition debris has been recycled or salvaged, or has otherwise
complied with the City's waste diversion program, which Report shall identify the
materials diverted from disposal and whether the materials have been sorted on site or
co -mingled.
Public Service and Utilities — Television
MM UTIL-22 Ongoing during project If the City of Anaheim determines that the proposed project creates a significant 7erDe
nin & Building
operation on broadcast television reception at local residences, the property P P rh' owner/devartment, Planning
shall install a signal booster or relay system on the roof of the tallest project bices Division
to restore broadcast television reception to its original condition as soon as pract
Public Services and Utilities — Standard Requirements
SR UTIL-1 Prior to the issuance of each The property
building permit revi w and p oval (1) a Landscape Documentation Package and (2) landscape and D Planning &Building
irrigation plans with appropriate water use calculations in accordance with the Services Divissionring
requirements of Anaheim Municipal Code Chapter 10.19, Landscape Water
— — - Efficiency.
SR UT1L-2 Prior to issuance of building The property
owner/developer shall provide evidence to the Planning &BuildinFDivision
&Building
permits Director or their designee that all sewage and wastewater disposal into the sewent, Building
system shall comply with OCSD's Wastewater Discharge Regulations, including thprocurement of the necessary permits by food service establishments that would b
developed in the ARSP area.
t
SR UTIL-3 Prior o issuance of building The property owner/develop
P permits er shall provide proof of payment to the Planning & Planning &Building
Building Director or their designee for a sanitary sewer service charge to OCSD. Department, Building
SR UT1L-4 Prior to issuance of building The roe P Division
permits property rh owner/developer er shall provide proof of payment to the Planning & Planning &Building
Building Director or their designee for a capital facilities connection charge to OCSD. Department, Building
Division
R:1Project'WD"3WD10004001Environmenta1 DocumentallonWinal SE1MF1na1_SEIR•022824.dOcx
4-60
Completion
DisneylandFonvard
Final Subsequent ElR No. 352
Mitigation
Measure/Project
Design Feature
Number
Timing
Measure
Responsible for
Monitoring
Completion
SR UTIL-5
Prior to issuance of building
The property owner/developer shall be required to demonstrate to the Planning
Planning & Building
permits
Department, Building Division that building plans meet the applicable Title 24 Energy
Department, Building
Efficiency Standards for Residential and Nonresidential Buildings (24 CCR 6). These
Division
standards are updated, nominally every three years, to incorporate improved energy
efficiency technologies and methods.
SR UTIL-6
Prior to issuance of building
The property owner/developer shall be required to demonstrate to the Planning
Planning & Building
permits
Department, Building Division that building plans meet the applicable California
Department, Building
Green Building Standards (24 CCR11).
Division
R:\ProjectsIWOI3WD10004001En ironmental DocumentationWinal SEIR1Final_SEIR-022824.docx 4-61
EXHIBIT "E"
"ARSP THEME PARK AND PARKING OVERLAYS"
[Behind this sheet-]
(DEV2021-00069)
EXHIBIT E
k
aty of
w M,
-Afibh�I
C
Both Rd L Ball -Rd' %
NlagieitYayi,%Lnee%d
J-
-Cep rdtm Ave k
It
3
Py'pt. : �A 1A.d
A66heim
L -71
.-6telllb Ave I r,- �� F� — , — J --
Katella -Ve
THEME PARKEAST
en' .116UNDAorr -'A
J range -god -Ye-
1-1 r
C of
Garde G'rove
Orang
e
,ChapmanAve
LEGEND
The Anaheim Resort
Boundary
Z :: The Anaheim Resort
Specific Plan Boundary
City Boundary
MAP FEATURES
Parcels subject the Theme Park Overlay
(East and West)
Zone in the C-R District City LegTo 1.61 Data, 2022
ly a ind" Dam. 2722
Parcels subject to the Parking Overlay Zone
in the C-R District
0 7 SWO ],500
'Eee1
EXHIBIT "F"
"DISNEYLANDFORWARD CONDITIONS OF APPROVAL"
[Behind this sheet.]
(DEV2021-00069)
EXHIBIT F
DisneylandForward Conditions of Approval
The conditions of approval include all mitigation measures and project design features as part of
Mitigation Monitoring Program (No. 387) for this project (as required by Section 21081.6 of the
Public Resources Code). For purposes of these conditions of approval, the following terms are
used:
a. Applicant: Walt Disney Parks and Resorts U.S., Inc., its successors and assigns.
b. Property Owner/Developer: Any owner or developer of properties owned by Walt
Disney Parks and Resorts U.S., Inc. or other subsidiaries of The Walt Disney
Company within the Disneyland Resort Specific Plan (DRSP) or the Anaheim
Resort Specific Plan (ARSP).
C. The Disneyland Resort: The Project site encompasses The Disneyland Resort,
including the Theme Park, Parking and Southeast Districts of the DRSP, and
properties in the ARSP Commercial Recreation (C-R) District (Development Area
1) owned or controlled by Walt Disney Parks and Resorts U.S., Inc. or other
subsidiaries of The Walt Disney Company.
NO. I CONDITIONS OF APPROVAL
PRIOR TO GRADING PERMIT ISSUANCE
RESPONSIBLE
DEPARTMENT
That prior to issuance of each grading permit, a rough or Public Works Department,
precise grading plan prepared by a registered Civil Engineer Development Services
shall be submitted to the City Engineer for review and
approval.
PRIOR TO ISSUANCE OF STREET IMPROVEMENT PLAN
2 That prior to approval of each street improvement plan the Public Works Department,
following shall be provided (for a one (1) year maintenance Development Services
period) in a manner acceptable to the City Engineer:
A. Public Realm Parkway and median island landscaping
and irrigation maintenance.
B. Provision for the replacement of any tree planted in
accordance with landscaping plans in a timely manner
in the event that it is removed, damaged, diseased,
and/or dead.
Page 1 of 8
NO.
CONDITIONS OF APPROVAL
RESPONSIBLE
DEPARTMENT
PRIOR TO APPROVAL OF TTM OR TPM OR ISSUANCE OFA BUILDING PERMIT
3
That prior to the approval of each tentative tract or parcel map
Public Utilities
or issuance of each building permit, whichever occurs first,
Department, Electrical
Public Utility Easements (PUEs) will be recorded and/or
Services Division
abandonment of PUEs will be processed to the satisfaction of
the Public Utilities Department for the following
circumstances:
A. As a result of increases in right of way where electrical,
water, and communication facilities are located adjacent
to the existing right of way, the facilities shall be either
located within the new right of way or relocated to new
adjacent areas requiring a PUE.
B. The undergrounding of power and communication lines
along the major streets will result in the need to obtain
PUEs for placement of pad mounted or subsurface
equipment and related facilities required as a result of
the overhead to underground conversion work.
C. Alterations to existing private buildings and/or
construction of new structures (buildings, signs,
landscaping elements, etc.) may require relocation of
existing electrical, water, and/or communication
facilities. This will require abandonment of existing
PUEs and recordation of new PUEs to accommodate the
relocation. Such relocations shall be performed at the
property owner/developer's cost.
D. Abandoning of existing public streets and/or rights of
way will require PUEs for public utilities currently in
place or relocation of public utilities and recordation of
new PUEs by property owner/developer.
4
That prior to the approval of each final tract or parcel map,
Public Works Department,
vehicular access rights to all public streets adjacent to subject
Development Services
tract or parcel except at approved access points, shall be
released and relinquished to the City of Anaheim.
5
Prior to approval of a tentative tract or parcel map, or issuance
Public Works Department,
of a building permit, vehicular access points to the public
Traffic Engineering
streets shall be subject to the review and approval of the City
Division
Traffic Engineer. All access points shall be in substantial
conformance with the District Concept Plans in Section 5.0,
"Design Plan", of the Specific Plan document.
Page 2 of 8
NO.
CONDITIONS OF APPROVAL RESPONSIBLE
DEPARTMENT
PRIOR TO BUILDING PERMIT ISSUANCE
6
That prior to issuance of each building permit unless records
Public Utilities
indicate previous payment, a fee for street lighting purposes
Department, Electrical
shall be paid to the City of Anaheim based on the length of
Services Division
street frontage in an amount as established by City Council
resolution with credit against the fee given for City authorized
improvements installed by the property owner/developer.
7
That prior to submittal of an application for a building permit
Public Works Department,
for the East Public Parking Structure, the property
Traffic Engineering
owner/developer shall meet with the City Traffic Engineer to
Division
develop plans prepared to the satisfaction of the City Traffic
Engineer showing a minimum of fourteen (14) toll lanes and a
minimum of 500 vehicle storage capacity prior to the toll
booths or alternative configuration approved by the City Traffic
Engineer based on a traffic study, and prior to final building and
zoning inspection for the East Public Parking Structure said toll
lanes/storage capacity or alternative configuration approved by
the City Traffic Engineer shall be provided.
8
That prior to issuance of building permits for each hotel or
Planning and Building
Vacation Ownership Resort parking facility, plans shall show
Department, Planning
the location and configuration of hotel or Vacation Ownership
Services Division
Resort employee and guest parking spaces.
9
Prior to submitting an application for a building permit for each
Public Works Department,
Disneyland Resort hotel or Vacation Ownership Resort project,
Traffic Engineering
the hotel or Vacation Ownership Resort project shall be
Division
designed to accommodate airport bus service to and from the
hotels or Vacation Ownership Resort project and plans showing
these areas, accessible to the general public, shall be submitted
to the City Traffic Engineer for review and approval as part of
an application for the building permit.
10
Prior to issuance of a building permit for a Parking Facility in
Public Works Department,
the East Parking Area and/or adjacent ARSP Parking Overlay,
Traffic Engineering
the property owner/developer shall submit a comprehensive
Division;
wayfinding program for vehicular access and pedestrian access
to the City for review and approval by the Public Works
Planning and Building
Director and Planning Director if in the public right-of-way and
Department, Planning
the Planning Director if on private property. The approved
Services Division
Page 3 of 8
NO.
CONDITIONS OF APPROVAL
RESPONSIBLE
DEPARTMENT
wayfinding program shall be installed prior to final building
and zoning inspections of the Parking Facility.
11
Prior to issuance of a building permit for a Parking Facility in
Public Works Department,
the East Parking Area and/or adjacent ARSP Parking Overlay,
Traffic Engineering
the property owner/developer shall submit vehicle access plans
Division
from Disney Way and/or Manchester Avenue/Clementine Street
to the parking facility prepared to the satisfaction of and subject
to review and approval by the City Engineer. Plans shall
include, but not be limited to, design and width of proposed
driveways, design of potential vehicle ramps to and from the
parking facility to Disney Way including height (clearance over
street grade and maximum height of ramp) and width of the
ramp and any associated right-of-way improvements, including
lane configurations, signal modifications, use of concrete under
the ramp, and sidewalk/parkway modifications. The property
owner/developer shall be responsible for all costs associated
with modifications to the public right-of-way and all access
improvements shall be completed to the satisfaction of the City
Engineer prior to final building and zoning inspections of the
Parking Facility.
12
Prior to submittal of an application for a building permit for a
Public Works Department,
new public parking facility, the property owner/developer shall
Traffic Engineering
meet with the Public Works Department, Traffic Engineering
Division
Division, to develop a general operations plan for the new
public parking facility containing information required by the
City Traffic Engineer relating to such matters as ingress and
egress to/from the structure during normal, moderate and peak
periods of vehicle flow; speed parking operations including
conflict minimization, direction of oversized vehicles and
direction of vehicles requiring ADA-accessible spaces; location
of cast parking; location of electric charging stations;
emergency ingress/egress; and any other information deemed
material to the City Traffic Engineer relating to the structure's
operation. The operations plan shall be approved by the City
Traffic Engineer prior to issuance of a building permit. Any
changes to the operations plan shall be reviewed and approved
by the City Traffic Engineer.
Page 4 of 8
NO. CONDITIONS OF APPROVAL
RESPONSIBLE
DEPARTMENT
PRIOR TO FINAL BUILDING AND ZONING INSPECTIONS
13
That prior to final building and zoning inspections, the water
Public Utilities
backflow equipment and any other large water system
Department, Water Utility
equipment shall be installed to the satisfaction of the Public
Division
Utilities Department, Water Utility Division, in either
underground vaults or behind the Setback Realm area in a
manner fully screened from all public streets and alleys. Such
information shall be specifically shown on the plans submitted
for building permits.
ONGOING/GENERAL
14
That pedestrian walkway lighting plans in the public right of
Public Utilities
way shall be reviewed and approved by the Public Utilities
Department, Electrical
Department, Electrical Services Division and the Police
Services Division;
Department prior to installation.
Anaheim Police
Department
15
That the roadway lighting of all public streets shall be designed
Public Utilities
in accordance with the Anaheim Resort Identity Program and
Department, Electrical
associated construction specifications.
Services Division
16
That the property owner/developer shall pay or cause to be paid
Public Utilities
all costs associated with replacing the existing City street light
Department, Electrical
system within the public right of way adjacent to or within the
Services Division
Disneyland Resort Specific Plan Area or Anaheim Resort
Specific Plan Area with street lights designed in accordance
with the Anaheim Resort Identity Program.
17
That all trees planted in the Public Realm shall be planted in
Public Works Department,
accordance with the standard City Tree Planting Detail.
Development Services
18
That no development shall occur unless such development is
Planning and Building
substantially in accordance with The Disneyland Resort
Department, Planning
Specific Plan No. 92-1 document on file with the Planning
Services Division
Department Amendment No. 9, as adopted by Ordinance No.
, and with the Anaheim Resort Specific Plan No. 92-2, on
file with the Planning Department, Amendment No. 17, as
adopted b\ Ordinance No.
Page 5 of 8
NO.
CONDITIONS OF APPROVAL
RESPONSIBLE
DEPARTMENT
19
That, in the event a parcel is subdivided and there is a need for
Planning and Building
common on- site circulation and/or parking, prior to the
Department, Planning
recordation of a subdivision map, an unsubordinated covenant
Services Division
providing for reciprocal access and/or parking, as appropriate,
approved by the City Traffic Engineer and the Planning and
Building Department and in a form satisfactory to the City
Attorney, shall be recorded with the Office of the Orange
County Recorder. A copy of the recorded covenant shall then be
submitted to the Planning Services Division of the Planning
and Building Department.
20
Ongoing during project operation of the West Public Parking
Public Works Department,
Structure(s), a minimum of eleven (11) toll lanes and a
Traffic Engineering
minimum of 500 vehicle storage capacity prior to the toll
Division
booths accessed directly from Disneyland Drive shall be
provided, unless the City Traffic Engineer approves an
alternative configuration.
21
That any modifications to the restricted setback in Project
Public Works Department,
Design Section 3.3-10, to Walnut Street (e.g., turn restrictions,
Traffic Engineering
narrowing of street, etc.) other than those approved as part of
Division;
the DisneylandForward Project shall be subject to the review
and approval of the Planning Commission. All modifications
Planning and Building
shall be designed and constructed to the satisfaction of the City
Department, Planning
Engineer.
Services Division
22
That should pedestrian bridge(s) over Harbor Boulevard or
Public Works Department,
pedestrian bridges/overpasses over Disneyland Drive be
Traffic Engineering
constructed, safe and convenient pedestrian access to/from the
Division
east parkway side of Harbor Boulevard and to/from the east
parkway side of Disneyland Drive, respectively, shall be
provided during construction by the property owner/developer,
to the satisfaction of the City Engineer.
23
Ongoing, any parking facility in the Southeast District shall be
Planning and Building
loaded and emptied to minimize evening noise generation, in
Department, Planning
compliance with the City's noise ordinance.
Services Division
24
In the event the existing Harbor Boulevard Drop off Area is
Public Works Department,
proposed to be relocated adjacent or internal to the East Parking
Traffic Engineering
Facility and/or in a parking facility in the adjacent ARSP
Division
Parking Overlay, that prior to submittal of an application for a
building permit for the East Parking Facility or a Parking I
Page 6 of 8
NO. I CONDITIONS OF APPROVAL
Facility in the adjacent ARSP Parking Overlay, the property
owner/developer shall meet with the City Traffic Engineer to
review the location and design of the drop-off area. The design
plan of drop-off area shall be subject to the review and approval
of the City Engineer. Prior to final building and zoning
inspections of said facility, the drop-off area shall be provided
by the property owner/developer in accordance with the
approved design plan.
25 That within thirty (30) days of the City Council's action on
Amendment No. 9 to The Disneyland Resort Specific Plan No.
92-1, the property owner/developer shall provide the Planning
and Building Department with three (3) printed copies and one
(1) electronic copy of an amended Specific Plan document
reflective of the City Council's action. Upon the Planning
Department's review and approval of the amended document as
being in conformance with the City Council's action three hard
copies of the final amended document and electronic copies
prepared to the Planning Director's satisfaction including all
text and graphics in the document to enable amendments to be
made to the document in the future, if necessary, shall be
provided by the property owner/developer to the Planning
Department.
26 That the property owner/ developer, as specified in the
individual mitigation measures, shall be held responsible for
compliance with the mitigation measures and implementation
of the project design features identified in Final Subsequent
EIR No. 352 and for complying with the Mitigation Monitoring
Program No. 387, in compliance with Section 21081.6 of the
Public Resources Code. Furthermore, the property
owner/developer, as specified in the individual mitigation
measures and the project design features, shall be responsible
for any direct costs associated with the monitoring and
reporting required to ensure implementation of those mitigation
measures and project design features identified in Final
Subsequent EIR No. 352.
RESPONSIBLE
DEPARTMENT
Planning and Building
Department, Planning
Services Division
Planning and Building
Department, Planning
Services Division
27 That every five years following the adoption of Ordinance No. Public Works Department,
for Amendment No. 9 to the Disneyland Resort Specific Traffic Engineering
Plan, the property owner/developer shall submit a parking
evaluation to the City Traffic Engineer for review and approval, Division
to assess the adec uac� of parkinw, for The Disneyland Resort
Page 7 of 8
NO.
CONDITIONS OF APPROVAL
RESPONSIBLE
DEPARTMENT
project. The parking evaluation shall be paid for by the property
owner/developer and shall be prepared to the satisfaction of the
City Traffic Engineer. If the parking evaluation indicates that
parking is deficient, then additional parking spaces shall be
provided in accordance with the recommendations of the
evaluation and in conformance with the Disneyland Resort
Specific Plan.
28
Ongoing, the southerly vehicular access to the West Parking
Public Works Department,
Area on Magic Way shall be provided so long as the parking
Traffic Engineering
facility is required to serve the Project.
Division
29
Ongoing, to prevent toll booth queues from reaching public
Public Works Department,
streets and potentially causing congestion, the property
Traffic Engineering
owner/developer shall implement the following operational
Division
contingency at theme park Parking Facilities during peak
arrival periods approximately 15 to 20 days per year to speed
up processing of vehicles through the toll booths. During peak
arrival periods, property owner/developer traffic managers and
Anaheim traffic control officers shall visually monitor traffic
conditions. If and when traffic in the toll booth queues reaches
a public street, the traffic managers shall contact the on -duty
toll booth manager and the property owner/developer shall
provide complimentary parking to arriving guests, typically in
20- to 100-car blocks, to allow free flow of vehicles until the
queues reduce and queues no longer reach a public street.
30
No later than thirty (30) days after the City Council's action on
Public Works Department,
Amendment No. 9 to The Disneyland Resort Specific Plan No.
Traffic Engineering
92-1, the property owner/developer shall cease using Gate 26
Division
on Walnut Street as an authorized access point for vehicle
ingress to the Project site, and no later than five (5) years after
said City Council action date shall cease using Gate 26 as an
authorized point of vehicle egress from the Project site onto
Walnut Street. In no event shall these shifts in vehicle access
be considered to restrict emergency and/or security vehicles
from using Gate 26 for access to and from the Project site, or to
prevent the property owner/developer from allowing use of
Gate 26 for vehicle ingress or egress in exigent circumstances.
Page 8 of 8
CLERK'S CERTIFICATE
STATE OF CALIFORNIA )
COUNTY OF ORANGE ) ss.
CITY OF ANAHEIM )
I, THERESA BASS, City Clerk of the City of Anaheim, do hereby certify that the foregoing is the
original Ordinance No. 6574 considered at a public hearing at a regular meeting of the City
Council of the City of Anaheim, held on the 161 day of April, 2024, and introduced at the
conclusion of the public hearing on the 171h day of April, 2024, and that the same was duly passed
and adopted at a regular meeting of said City Council held on the 7th day of May. 2024, by the
following vote of the members thereof:
AYES: Mayor Aitken and Council Members Kurtz, Diaz, Leon, Rubalcava,
Faessel and Meeks
NOES: None
ABSENT: None
ABSTAIN: None
IN WITNESS WHEREOF, I have hereunto set my hand this 8th of May, 2024.
CITY LERK OF THE CITY OF ANAHEIM
(SEAL)
ANAHEIM BULLETIN MYN M
See Proof on Next Page
Anaheim Bulletin
1920 Main St. Suite 225
Irvine , California 92614
fi 14) 796-2209
200 S. Anaheim Blvd., Suite 217
Anaheim, California 92805
AFFIDAVIT OF PUBLICATION
STATE OF CALIFORNIA
County of Orange County
I am a citizen of the United States and a resident of the County
aforesaid; I am over the age of eighteen years, and not a parry
to or interested in the above -entitled matter. I am the principal
clerk of the Anaheim Bulletin, a newspaper that has been
adjudged to be a newspaper of general circulation by the
Superior Court of the County of Orange County, State of
California, on December 28, 1951, Case No. A-21021 in and
for the City of Anaheim, County of Orange County, State of
California; that the notice, of which the annexed is a true
printed copy, has been published in each regular and entire
issue of said newspaper and not in any supplement thereof on
the following dates, to wit:
05/16/2024
I certify (or declare) under the penalty of perjury under the
laws of the State of California that the foregoing is true and
correct:
Executed at Anaheim, Orange County, California, on
Date: May 16, 2024.
ORD-6574 (5190168) - Page 1 of 2
SUMMARY PUBLICATION
CITY OF ANAHEIM
ORDINANCE NO. 6574
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF ANAHEIM
APPROVING AND ADOPTING AN AMENDMENT TO THE ANAHEIM RESORT
SPECIFIC PLAN NO.92-2
(AMENDMENT NO. 17 TO THE ANAHEIM RESORT SPECIFIC PLAN)
(D E V2021-00069)
This ordinance amends various and numerous provisions of the Anaheim Resort
Specific Plan No. 92-2 to comprehensively update text, graphics and Imagery
throughout to reflect Disneyland Forwarid, an update to the Disneyland Resort Prolect,
including providing administrative review of future development In the Theme Park
and Parking Overlays, revising structural height standards In the Theme Park Overlay,
requiring 360 Degree Architectural Treatments for theme park uses, revising setbacks
along certain streets and adlacent to residential zones, and updating standards to
reflect proposed modifications associated with Disneyland Forward.
I, Theresa Bass, City Clerk of the City of Anaheim, do hereby certify that the foregoing
Is a summary of Ordinance No. 6574, which ordinance was considered at a public
hearing at a regular meeting of the City Council of the City of Anaheim on the 16th day
of April, 2024 and Introduced at the conclusion of the public hearing on the 17th day of
Aprl1, 2024, and was duly passed and adopted at a regular meeting of said Council on
the 7th day of May, 2024 by the fol lowing roll call vote of the members thereof:
AYES:
Mayor Aitken and Council Members Kurtz, Diaz, Leon, Rubalcava,
Faessel and
NOES:
None
ABSENT:
None
ABSTAIN:
None
The above summary is a brief description of the sublect matter contained in the text of
Ordinance No. 6574, which has been prepared pursuant to Section 512 of the Charter of
the City of Anaheim. This summary does not Include or describe every provision of the
ordinance and should not be relied on as a substitute for the full text of the ordinance.
To obtain a copy of the full text of the ordinance, please contact the Office of the City
Clerk, (714) 765-5166, between 8:00 AM and 5:00 PM, Monday through Friday. There is
no charge for the copy.
151972(LM
Anaheim Bulletin
Published: 5/16/24
ORD-6574 (5190168) - Page 2 of 2
CLERK'S CERTIFICATE
STATE OF CALIFORNIA )
COUNTY OF ORANGE ) ss.
CITY OF ANAHEIM )
I, THERESA BASS, City Clerk of the City of Anaheim, do hereby certify that the foregoing
is the original Ordinance No. 6574 and was published in the Anaheim Bulletin on the 16tn
day of May, 2024, pursuant to Section 512 of the City Charter of the City of Anaheim.
OC14RK OF THE CITY OF ANAHEIM
(SEAL)