619 W GRAFTON PL (3)Permit Types
BLD ELE MEC PLM
X
Permit Number: BLD2024-02858
Issued: 06/04/2024
vvivw.anaheim.net/building
(714)765-4626
Quarter Section: 61
Site Address: 619 W GRAFTON PL, Anaheim, CA 92805
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 - 5153
Legal Description: N TR 1186 BLK LOT 21
- 111111111AIWILL.
APN: 03419116
_
Project Description: Reroof: Remove and install (20) squares of composition shingle over portion of house and (12) squares of flat torch
down over portion of house and attached garage
Living Area: Number of Stories:
1 Valuation: 25,000.00
Garage Area:
Construction Types: VB
Carport Area:
Occupancy Groups:
Balcony I Deck Area:
Fire Spdnkiered:
Cool Roof:
Total Fees paid for Permit: 375,25
People Associated with Project:
Contractor GRACE PRO ROOFING INC
630 N STONEMAN AVE #A ALHAMBRA, CA
Permit Applicant Ayoung Kim
Owner SHIN, ESTER
619 W GRAFTON Pl.
Type Electrical Fixtures Oty Type Plumbing Fixtures Oty Mechanical Fixtures
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit issuance. A new permit is required to commence or continue work.
City of Anaheim PNPHEIM -
o4D� �0
Building Division " \2
!>
i
�•!
�0
6NOEo `" ^
Do not occupy this buildina until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
)
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION I
DATE
INSPECTOR
Fire Sprinkler (ONLY) (714) 765.6041
Do not pour concrete until the following applicable items have been signed.
Fire Dept. Final (714) 7655041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 766.4591
Electrical Ground ElectrodelUfer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/FormslTrenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have beensianed
Building Final (714 765-5153)�^�
Last Inspection -Final Only After Above Completed
p
V
(�, Y
t'
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been n
let Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf.lBond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COAIMitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed
Drywall
Drywall Penetrations (Ele. Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
(Do not backf 11 unless emned off)
Sewer
Water Engineering Backflow (Testable Only)
Water Service