Loading...
619 W GRAFTON PL (3)Permit Types BLD ELE MEC PLM X Permit Number: BLD2024-02858 Issued: 06/04/2024 vvivw.anaheim.net/building (714)765-4626 Quarter Section: 61 Site Address: 619 W GRAFTON PL, Anaheim, CA 92805 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 Legal Description: N TR 1186 BLK LOT 21 - 111111111AIWILL. APN: 03419116 _ Project Description: Reroof: Remove and install (20) squares of composition shingle over portion of house and (12) squares of flat torch down over portion of house and attached garage Living Area: Number of Stories: 1 Valuation: 25,000.00 Garage Area: Construction Types: VB Carport Area: Occupancy Groups: Balcony I Deck Area: Fire Spdnkiered: Cool Roof: Total Fees paid for Permit: 375,25 People Associated with Project: Contractor GRACE PRO ROOFING INC 630 N STONEMAN AVE #A ALHAMBRA, CA Permit Applicant Ayoung Kim Owner SHIN, ESTER 619 W GRAFTON Pl. Type Electrical Fixtures Oty Type Plumbing Fixtures Oty Mechanical Fixtures The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. City of Anaheim PNPHEIM - o4D� �0 Building Division " \2 !> i �•! �0 6NOEo `" ^ Do not occupy this buildina until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final ) Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE INSPECTOR Fire Sprinkler (ONLY) (714) 765.6041 Do not pour concrete until the following applicable items have been signed. Fire Dept. Final (714) 7655041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 766.4591 Electrical Ground ElectrodelUfer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/FormslTrenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have beensianed Building Final (714 765-5153)�^� Last Inspection -Final Only After Above Completed p V (�, Y t' Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been n let Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf.lBond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COAIMitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed Drywall Drywall Penetrations (Ele. Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor (Do not backf 11 unless emned off) Sewer Water Engineering Backflow (Testable Only) Water Service