Loading...
158 N AVENIDA BARCA (2)Permit Types BLD ELE MEC PLM X Permit Number: BLD2023-02294 Issued: 05/10/2023 wwris.anaheim.net/building (714)7654626 Quarter Section: 190 Site Address: 158 N AVENIDA BARCAANAHEIM, CA 92807 Legal Description: N TR 7786 BILK LOT 29 APN: 35809105 CITY OF ANAI- EIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 Project Description: Residential Remodels Replace (2) patio sliders and (4) retro fit windows REF: INV2022-00447 Uring Area: Number of Stories: 1 Valuation: Garage Area: Construction Types: Carport Area: Occupancy Groups: Balcony / Deck Area: Fire Sprinklered: Cool Root Total Foot paid for Parma: People Associated with Project: Permit Applicant Jesus Razo Owner RAZO JESUS M 8 MICHELLE R 158 N AVENIDA BARCA 900.00 N/A 174 50 Type Electrical Fixtures Oty Type Plumbing Fixtures City Mechanical Fixtures Qty The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit Issuance. A new permit is required to commence or continue work. '�f,14EIM Cd< Cityof Anaheim C� iO Building Division ' , U > �g�NDED �aaA Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are role Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4260 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have beer Fire Dept Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Uo not install subfloor or pour floor slab until the follwmg applicable items have been irroned Building Final (714 765-5153) Last Insoecfioo-Final only After Above completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) D^ not cover or conceal the work below until the following applicable items have 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing rinly irte, Pin, Ele Mac A FnF Insulation (Sound/Energy) or tape of piaster until the following applicable items have been signed. Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 ba. - days after approval) Excludes New Construct on Exterior Plaster (Brown Coat) T-Bar (Struct, Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service