Loading...
807 S CANYON MIST LN (3)Permit Types BLD ELE ME C PLM X X Permit Number: BLD2023-05425 Issued: 11/15/2023 wvirmt.anaheim.net/building (714)765-4626 Quarter Section: 208 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 Site Address: 807 S CANYON MIST LN, ANAHEIM, CA 92808 Legal Description: N TR 12689 BLK LOT 9 APN: 35651145 Project Description: Residential Remodel: 75 sq ft to construct new second story balcony, convert window to sliding door, Install exterior garage lighting and shoe shelf Living Area: 0 Number of Stones: 2 Valuation: 30,000.00 Garage Area: Construction Types: VB Carport Area: Occupancy Groups: Balcony / Deck Area: 75 Fire Spnnklered: Coal Roof: Total Fees paid for Permit: 2,041.90 People Associated with Project Contractor TECH LA BUILDER 136 LOST HILLS IRVINE, CA 90807 Permit Applicant Shu Wu 530 TECHNOLOGY DR STE 100 IRVINE, CA 92618 Owner STODDARD, SABRINA O 807 S CANYON MIST LN Engineer -Mechanical YIBO QI 530TECHNOLOGY DR IRVINE, CA92618 Engineer - Civil SHU WU 530TECHNOLOGY DR IRVINE, AZ 92618 Type Electrical Fixtures City Type Plumbing Fixtures Qty Mechanical Fixtures Qty EV Charger 1 Receptacle, switches, lights 8 The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. PNPytEIM oq` Cityof Anaheim O io Building Division y �OGA'DED tarn Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final i7 �j/�+( Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-6126 INSPECTION DATE INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed. Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 7655194 (Allow 10 business days) Setback/Forms/Trenches (Footings) b - COA/Migation Measures Do not install subfloor or pour Floor slab until the follwing applicable items have been Building Final (714 7655153) Last Inspection -Final Only After Above Completed r/y Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been a dined 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf.lBond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical L yy Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele.. Mec. & Fire) Ili ii j }-(jpf�,• Insulation (Sound/Energy) Do not tape or plaster until the following applicable items hale been sgnea. Drywall Drywall Penetrations (Ele, Mec 6 Plbg) Interior Lath Exterior Lath l rb7/1 '�%3m"t1 Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor (Do not backfill unless s cried off) Sewer Water Engineering Backflow (Testable Only) Water Service