Loading...
280 N DALTON DRPermit Types O' - Une Ev a*'' BLO ELE MEC FILM CITY OF ANAHEIM X BUILDING DIVISION Permit Number: BLD2024.02561 200 S. ANAHEIM BLVD. Issued: 05/20/2024 f714) 765 - 5153 www.anaheim.net/building (714)765-4626 Quarter Section: 167 Site Address: 280 N DALTON DR, ANAHEIM, CA 92807 Legal Description: N TR 17879 BLK LOT 54 APN: 35922222 Project Description: Residential EV Charger Level 2 Living Area: Number of Stories: Garage Area: Carport Area: Balcony I Deck Area: Cool Root Valuation: 0.00 Construction Types: Occupancy Groups: Fire Sprinklered: Total Fees paid for Permit: 172.00 People Associated with Project: Contractor TROUT ELECTRIC 2020 IOWA AVE,SUITE 102 RIVERSIDE, CA 92504 Permit Applicant TROUT ELECTRIC 17843 GLEN HOLLOW WAY RIVERSIDE, CA 92504 0000 Type Electrical Fixtures Oty Type Plumbing Fixtures Oty Mechanical Fixtures City EV Charger 1 The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. PNEIM Cityof Anaheim o� PN �� \O\ Building Division pVN EU Ep o �^ Do not occupy this buildina until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final( Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765.5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) 1COAWigation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been started Building Final (714 765-5153) Last Inspection -Final Only After Above Completed 17 Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Remf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sianed 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (SheathinglDiaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg_ Ele.. Mec 9 Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed. Drywall Drywall Penetrations (Ele, Mec 8. Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construct on Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor ori off) FSeerterEngineering Backflow (Testable Only) ter Service