280 N DALTON DRPermit Types O' - Une Ev a*''
BLO ELE MEC FILM CITY OF ANAHEIM
X
BUILDING DIVISION
Permit Number: BLD2024.02561 200 S. ANAHEIM BLVD.
Issued: 05/20/2024 f714) 765 - 5153
www.anaheim.net/building
(714)765-4626
Quarter Section: 167
Site Address: 280 N DALTON DR, ANAHEIM, CA 92807
Legal Description: N TR 17879 BLK LOT 54
APN: 35922222
Project Description: Residential EV Charger Level 2
Living Area: Number of Stories:
Garage Area:
Carport Area:
Balcony I Deck Area:
Cool Root
Valuation: 0.00
Construction Types:
Occupancy Groups:
Fire Sprinklered:
Total Fees paid for Permit: 172.00
People Associated with Project:
Contractor TROUT ELECTRIC 2020 IOWA AVE,SUITE 102 RIVERSIDE, CA 92504
Permit Applicant TROUT ELECTRIC 17843 GLEN HOLLOW WAY RIVERSIDE, CA 92504 0000
Type Electrical Fixtures Oty Type Plumbing Fixtures Oty Mechanical Fixtures City
EV Charger 1
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit issuance. A new permit is required to commence or continue work.
PNEIM
Cityof Anaheim o� PN �� \O\
Building Division
pVN EU Ep o �^
Do not occupy this buildina until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final(
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765.5126
INSPECTION
I DATE
I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
1COAWigation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
started
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
17
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Remf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sianed
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (SheathinglDiaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg_ Ele.. Mec 9 Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed.
Drywall
Drywall Penetrations (Ele, Mec 8. Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construct on
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
ori off)
FSeerterEngineering Backflow (Testable Only)
ter Service