Loading...
448-450 N VIA PISAPermit Types BLD ELE MEC PLM X Permit Number: BLD2024-02161 Issued: 04/29/2024 www.anaheim.nettbu ilding (714)7654626 Quarter Section: 141 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 Site Address: 448450 N VIA PISAANAHEIM, CA 92806 Legal Description: N TR 7802 BLK LOT 143 APN: 26819118 Project Description: Reroof: Remove and install (7) sq of composition shingles over the peaked portion only for unit 448 and remove and install (10) sq of composition shingles for the peaked portion for unit 550 only Living Area: Number of Stories: 1 Valuation: 19.460.00 Garage Area: Conseuction Types: NIA Carport Area: Occupancy Groups: Balcony I Deck Area: Fire Spnnklered Cool Roof: Total Fees paid for Permit: 354A5 People Associated with Project: Contractor MONUMENT ROOFING 625 WEST KATELLA AVE # 29201905140819378210 ORANGE, CA 92867 Permit Applicant Charles Anderson Owner HSU, LEO 20128 CANDLEFLAME CT Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. PNI,t1EIM �q< Cityof Anaheim O� 1O Building Division /_ z u > •� �0 'VDEo t$F^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-6126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 7655041 Do not pour concrete until the following applicable items have been signed. Fire Dept. Final (714) 7655041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765.4591 Electrical Ground Electrode/Lifer Sub List/Bus. Lic. (714) 765-6194 (Allow 10 business days) Setback/FormslTrenches (Footings) COA/Migation Measures Do not install subfloor or pour Floor slab until the foliving applicable items have been sinned Building Final (714 765-5153) LastInspection-FinalOnly After Above Completed l'x _ Plumbing(Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre4ab (Compaction/Membrane Reinf.) Floor (JoisVGirders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been stoned 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor S r Roo eathin /Diaphragm/Frame) M s n einf.lBond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg.. Ele.. Mec. & Fire. Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signet Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New ingrignurtion Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor fr), nut hackf It unless q,ened off) Sewer Water Engineering Backflow (Testable Only) Water Service