Loading...
921 S EUCLID ST (2)Permit Types LLD 1 ELE MEC PLM X Permit Number: BLD2022.04176 Issued: 09/02/2022 vrww.anaheim.net/building (714)7654626 Quarter Section: 48 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. 47141 765 - 5153 Site Address: 921 S EUCLID ST, ANAHEIM, CA 92804 Legal Description: N TR 2377 BLK LOT 236 TR NO 2377 LOT 236 AND LOT 2 APN: 12826414 Project Description: Commercial Reroof: Remove existing material, re -sheathe as needed, and install (95) sq of flat roof Living Area: Number of Stories: 1 Valuation: Garage Area: iAneaUCgOn Types: Carport Area: Occupancy Groups: Balcony / Deck Area: Fire Sprinklered: Cool Roof: Total Fees paid for Perne: People Associated with Project: Permit Applicant Ridge Bdel Owner BALL EUCLID PLAZA LLC 531 MAIN ST 1500 95,000.00 N/A 522.60 Type Electrical Fixtures Qty Type Plumbing Fixtures City Mechanical Fixtures City The permit shall expire by limitation and become null and Vold If the building or work has not passed final inspection 365 days from the date of permit Issuance. A new permit is required to commence or continue work. �PHEIM cq Cityof Anaheim OFP C��O Building Division h y > �OVNDED 161 Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final _ Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub LIst/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been ned Building Final (714 765.5153) Last Inspection -Final Only After Above Completed / - Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (JoisUGirdem) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sioned 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (SheathinglDiaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing !Only after Plbg Ele Mec 8 Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service