Loading...
753 N CLEMENTINE ST (2)Permit Types BLD ELE MEC PLM X Permit Number: BLD2024.02237 Issued: 05/02/2024 www.anaheim.net/building (714)7654626 Quarter Section: 71 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 Site Address: 753 N CLEMENTINE ST, ANAHEIM, CA 92805 Legal Description: N TR 237 BLK B LOT 3 APN: 03425303 Project Description: Reroof to remove and install (1) square of composition shingle over pitched area and (16) squares of torch down over flat roof of house and detached garage Living Area: Number of Stories: 1 Valuation: 9,500.00 Garage Area: Construction Types: VB Carport Area: Occupancy Groups: Balcony / Deck Area', Fire Spnnklered' Cool Roof: Total Fees paid for Permit: 350.24 People Associated with Project: Contractor J D F CONSTRUCTION INC 2915 E LA JOLLA ST ANAHEIM, CA 92821 Permit Applicant Jesse Marquez 201 Gemini Ave Owner MELLEM, JAMES IAN & JESSICA ARIN 753 N CLEMENTINE ST Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty The permit shall expire by limitation and become null and void If the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit Is required to commence or continue work. PNp,HEl c7�� City of Anaheim Building Division P > UpNOR) v$�n Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-6041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765.5041 Plumbing (GroundlUnderfloor Drain Waste) Water Engineering (714) 765.4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lie. (714) 7664194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been sianed Building Final (714 765-5155) Last Inspection -Final Only After Above Completed \ t Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reirri Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after pill , Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed. Drywall Drywall Penetrations (Ele, Mee & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construct on Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mee.) Grease Interceptor (Do not backf 11 unless sinned oM Sewer Water Engineering Backflow, (Testable Only) Water Service