Loading...
921 S BEACH BLVD (2)Permit Types BLD ELE MEC LM X P Permit Number: BLD2024-02293 Issued: 05/07/2024 www,anaheim.net/building (714)765-4626 Quarter Section: 10 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. 17141 765 • 5153 SBe Address: 921 S BEACH BLVD, Anaheim, CA 92804 Legal Description: S TWP 4 RGE 11 SEC 14 SEC 14 T 4 R 11 N 162 FT S 3 APN: 07989330 Project Description: Reroof: Remove and install (245) Squares of composition shingles over Building Units 101-154, and attached office Living Area: Number of Stories: 0 Valuation: Garage Area: Construction Types: Carport Area: Occupancy Groups: Balcony I Deck Area, Fire Sprinklered: Cool Roof: Total Fees paid for Permit: People Associated with Project: Contractor ONE STOP DEVELOPMENT INC 5377 HERITAGE OAK DR PORTOLA HILLS, CA 92679 Permit Applicant conned chaps Owner INTEGRITY HOUSING LP 921 S BEACH BLVD 41 90,000.00 N/A 882.20 Type Electrical Fixtures City Type Plumbing Fixtures Qty Mechanical Fixtures Qty The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit Issuance. A new permit is required to commence or continue work. NPHEIM Cq City of Anaheim o� P \ p Building Division ti Z u i> -' OLNDED t4" Do not occupy this buildina until the final inspections have been made. FINAL INSPECTIONS DATE I INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed'. Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 7654591 Electrical Ground Electrode/Ufer Sub LlstfBus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour Floor slab until the follwing applicable items have been sioned- Building Final (714 7654163) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mac. 8 Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed. Drywall Drywall Penetrations (Ele, Mec S, Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service