Loading...
201 W KATELLAProject Description: Tenant Improvement: Alterations to hotel rooms on 3rd and 5th floors for new fixture upgrades. e Number of Stories 11 Valuation: $131,880.00 Construcion Types: IA, , Fire Spdnklered? Yes Cool Roof No Total Fees paid for Permit: 7.659.93 People Associated with Project Owner MANTRA LLC LEGAL DEPARTMENT 9805 WILLOWS RD REDMOND WA 98052 Engineer NABILTAHA Contractor RC STRONG CONSTRUCTION INC 1322 CORA CT GARDNERVILLE NV 89410 Permit Applicant THOMAS MORTON Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Type Mechanical Fixtures Qty Shower 24 Lavatory 48 The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the date of permit Issuance. A new permit is required to commence or continue work. told_ permit_ combo �NpN EIM Cd< City of Anaheim DF iO Building Division F i BOO A'DED 1gh^ Do not occuDV this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR ?II applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765 T Engineering Final (714) 765-5126 J O I INSPECTION DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 7655041 Do not pour concrete until the following applicable items have been signed Fire Dept. Final (714) 765-50� r (� Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub ListlBus. Lic. (714) 765-5194 (Allow 10 business days) Setbaek/FormsrTrenches (Footings) I ICOAJMigation Measures D- not •n,Iai'. s, i-- she follwina applicable items have been Building Final (714 765-5153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sioned 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing Only after Plbg., Ele.. Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been sign-, Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter :!.ri be set within Z- business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service