201 W KATELLAProject Description: Tenant Improvement: Alterations to hotel rooms on 3rd and 5th floors for new fixture upgrades.
e
Number of Stories 11 Valuation: $131,880.00
Construcion Types: IA, ,
Fire Spdnklered? Yes
Cool Roof No
Total Fees paid for Permit: 7.659.93
People Associated with Project
Owner
MANTRA LLC
LEGAL DEPARTMENT 9805 WILLOWS RD REDMOND WA 98052
Engineer
NABILTAHA
Contractor
RC STRONG CONSTRUCTION INC
1322 CORA CT GARDNERVILLE NV 89410
Permit Applicant
THOMAS MORTON
Type Electrical Fixtures
Qty Type
Plumbing Fixtures Qty Type Mechanical Fixtures Qty
Shower
24
Lavatory
48
The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the date of
permit Issuance. A new permit is required to commence or continue work. told_ permit_ combo
�NpN EIM Cd<
City of Anaheim DF iO
Building Division F i
BOO
A'DED 1gh^
Do not occuDV this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
?II applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765
T
Engineering Final (714) 765-5126 J O I
INSPECTION
DATE
I INSPECTOR
Fire Sprinkler (ONLY) (714) 7655041
Do not pour concrete until the following applicable items have been signed
Fire Dept. Final (714) 765-50� r
(�
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub ListlBus. Lic. (714) 765-5194 (Allow 10 business days)
Setbaek/FormsrTrenches (Footings)
I
ICOAJMigation Measures
D- not •n,Iai'. s, i-- she follwina applicable items have been
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sioned
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing Only after Plbg., Ele.. Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been sign-,
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter :!.ri be set within Z-
business days after approval) Excludes New
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service