Loading...
930 E DRAPERY LNPermit Types BLD I ELE MEC PLM dx Permit Number: BLD2019-04552 Isst93d: 09/13/2019 INSPECTION REQUEST LINE: (714) 765 - 4626 Quarter Section: 109 Site Address: 930 E DRAPERY LN Legal Description: Project Description: Residential EV charger Level 2 inside the garage CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765. 5153 Valuation: $0.00 Construcion Types: N/A, , Fire Sprinklered? No Cool Roof No Total Fees paid for Permit: 0.00 People Associated with Project: Owner BILLY WONG 930 E DRAPERY LN ANAHEIM CA 92802 Permit Applicant BILLY WONG Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Type Mechanical Fixtures Qty EV Charger The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. 11_ -_ ,_I .. P�I,NEIM G1` Cityof Anaheim O4 iQ Building Division F 4 U > �OUNOEO tay^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final INbF,LJN Cross Connection Control (714) 76542 T C A M P Engineering Final (714) 765-5126 INSPECTION DATE I INSPECTOR i Fire Sprinkler (ONLY) (714) 765-50 A-f-.- . l U Do not pour concrete until the following applicable items have been signs.-. Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) SetbacklFormsfTrenches (Footings) COA/Migation Measures a,i scofloclr or I,, floor slab until the follwnng applicable items have been sioned Building Final (714 7655153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (CompactionlMembrane Reiri Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Dr conceal the work below until the following applicable items have 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing Only after Flbg Do Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signec Drywall Drywall Penetrations (Ele. Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter - ' ter wall be set w nin 2-3 business days after art Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service