Loading...
630 S KNOTT AVE 53-56Permit Types BLD 1 ELE MEC PLM X Permit Number: BLD2024-03756 Issued: 07/23/2024 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 www.anaheim. net1bu ilding (714)7654626 Quarter Section: 6 Site Address: 630 S KNOTT AVE 53-56, Anaheim, CA 92804 Legal Description: N TR 5107 BLK LOT 1 UN 53 TR 5107 LOT 1 UNIT 53 A- APN: 93620053 Project Description: Reroof: Remove existing material to install (29) squares of composition shingles over units 53-56 Living Area: Number of Stones: 2 Valuation: 15,000.00 Garage Area: Construction Types: NIA Carport Area: Occupancy Groups: Balcony I Deck Area: Fire Spnnklered: No Cool Roof: Total Fees paid for Penns: 362.20 People Associated with Project: Contractor CASSADY ROOFING INC 13021 LAKELAND ROAD SANTA FE SPRINGS, CA 90670 Permit Applicant Madison Rafuson Owner DODIA, TUSHAR V 8 DARSHANA P 630 S KNOTT AVE 53 Type Electrical Fixtures Cry Type Plumbing Fixtures City Mechanical Fixtures Cry The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the date of permit issuance. A new permit Is required to commence or continue work. P�ntiEtAf C�< City of Anaheim Dt io Building Division z U > �ooA'DEC vsh^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 7654280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 7654591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been sianed Building Final (714 765-5153) Last Inspection -Final Only After Above Completed p Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sr aned 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) 1'{ Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg.. Ele., Mec. 8 Fire) Insulation (SoundlEnergy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Met; & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service