824 S COURSON DR (2)Permit Types
BLD
ELE
MEC
PLM
X
X
X
X
Permit Number: BLD2023-04004
Issued: 03/07/2024
www.anahei m. nettbu ilding
(714)765-4626
Quarter Section: 6
Site Address: 824 S COURSON DR, ANAHEIM, CA 92804
Legal Description: N TR 2839 BLK LOT 35
APN: 07943331
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 - 5153
Project Description: Residential Remodel: 240 sq it to reconfigure kitchen
Living Area: Number of Stories: 1 Valuation:
Garage Area: Construction Types:
Carport Area: Occupancy Groups:
Balcony / Deck Area: Fire Sprinklered:
Cool Roof: Total Fees paid for period:
People Associated with Project
50,000.00
VB
No
1,341.48
Contractor
JUSTIN CONSTRUCTION
12552 GARNET ST GARDEN GROVE, CA 92845
Permit Applicant
Justin Hardesty
Owner
GERKEN, MICHELLE LYNETTE TR THE W E & M
824 S COURSON DR
Engineer - Civil
MICHAEL C CARDOSO
201512280937294510
Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty
New or total rewire - 1 or 2 family 240 Garbage Disposal 1 Ventilation Fan - — 300 cfm on single duct 1
Gas System (outlets) 1
Kitchen Sink
Repair/Drainage Alteration/Vent Piping
Water Distribution
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit Issuance. A new permit is required to commence or continue work.
PapttElM �9C
Cityof Anaheim o4 iQ
Building Division F y
• ao4A,o Eo t8y^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
f r.z4
Electrical Final
G
Plumbing Final
Zz'—
Mechanical Final
Cross Connection Control (714) 7664280
Engineering Final (714) 765-5126
INSPECTION I
DATE I
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed.
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste) '- 2k
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub Lis us. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenche Fo tings)
.
COA/Migation Measures
Do not install subiloor or pour-ficitl—STab until the follwing applicable items have been
. n
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sioned
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out) Ll
Rough Duct (Mechanical) -
Y - L v
L,t-
Rough Mechanical
Rough Electrical 41.
- `r
C✓
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg Fle Mee. & Fire)
•'
:. 4-
Insulation (Sound/Energy)
`-�' L ,^S ��'"� G 1 S bo
Do not tape or plaster until the following applicable items have been signed
Drywall
/
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
5
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service