Loading...
130 S LEOLA WAYPermit Types BLD ELE MEC PLM X fH! I/1r r Permit Number: BLD2020-03865 Issued: 09/17/2020 INSPECTION REQUEST LINE: (714) 765 - 4626 Quarter Section: 168 Site Address: 130 S LEOLA WAY Legal Description: P BK 76 PG 14 PAR 3 Project Description: Residential remodel: Replace (1) patio door. Like for like. People Associated with Project: CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765. 5153 Valuation: $3,002.00 Construcion Types: N/A, , Total Fees paid for Permh: 167.00 Owner RICHARD KIM 130 LEOLA WAY ANAHEIM CA 92807-3514 Contractor THE HOME DEPOT 1095 N PULLMAN ST ANAHEIM CA 92807 0000 Permit Applicant MARTIN WHITEHEAD Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Type Mechanical Fixtures Qty The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. TNP lEIM e, Cityof Anaheim o4 iO Building Division F 2 u S �DVNDEO t8y^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4 0 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 MHECTION Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 C M Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (,MrMusines ys Setback/Forrns/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been Building Final (714 765.5153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sr oned 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf.IBond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg_ File _ Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed'. Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service