Permit Number: BLD2020-02650
Issued:07/08/2020
INSPECTION REQUEST LINE
(714) 765 - 4626
Quarter Section: 122
Site Address: 201 N MILTON ST
Legal Description: N TR 2767 LOT 6
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 - 5153
Project Description: Residential Remodel: 1,279 sq ft of water damaged drywall to be replaced.
Valuation: $5.000.00
Construcion Types: N/A, ,
Total Fees paid for Permit: 485.65
People Associated with Project
Owner SONIA CHAVEZ 201 N MILTON ST ANAHEIM CA 92806-3108
Contractor WIZARD RESTORATIONS INC 10245 8TH ST RANCHO CUCAMONGA CA 91730
Permit Applicant FERNANDO VIDAURRY
Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Type Mechanical Fixtures Qty
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of
permit issuance. A new permit is required to commence or continue work. I I ,
PNf,NEIM Cq`
City of Anaheim O4 10
Building Division h 2
�OVhDED tsti1
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) NURT41M
Engineering Final (714) 765-5126
INSPECTION I
DATE
I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-50410
Do not pour concrete until the following applicable items have been signed
Fire Dept. Final (714) 765-5041
-`
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765 1, r
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-51 4 (Allow 10 usiness days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
sianed
Building Final (714 765-6153)
Last Inspection -Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond BeamlPre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg_ Ele., Mec. & Fire)
Insulation (SoundlEnergy)
Do not tape or plaster until the following applicable items have been signed.
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes Now
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
LUIUm hackfill unless sinned off)
Sewer
Water Engineering Backflow (Testable Only)
Water Service