Loading...
201 N MILTON STPermit Types BLD ELE MEC I FILM X --------------- Permit Number: BLD2020-02650 Issued:07/08/2020 INSPECTION REQUEST LINE (714) 765 - 4626 Quarter Section: 122 Site Address: 201 N MILTON ST Legal Description: N TR 2767 LOT 6 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 Project Description: Residential Remodel: 1,279 sq ft of water damaged drywall to be replaced. Valuation: $5.000.00 Construcion Types: N/A, , Total Fees paid for Permit: 485.65 People Associated with Project Owner SONIA CHAVEZ 201 N MILTON ST ANAHEIM CA 92806-3108 Contractor WIZARD RESTORATIONS INC 10245 8TH ST RANCHO CUCAMONGA CA 91730 Permit Applicant FERNANDO VIDAURRY Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Type Mechanical Fixtures Qty The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. I I , PNf,NEIM Cq` City of Anaheim O4 10 Building Division h 2 �OVhDED tsti1 Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) NURT41M Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-50410 Do not pour concrete until the following applicable items have been signed Fire Dept. Final (714) 765-5041 -` Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765 1, r Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-51 4 (Allow 10 usiness days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been sianed Building Final (714 765-6153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond BeamlPre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg_ Ele., Mec. & Fire) Insulation (SoundlEnergy) Do not tape or plaster until the following applicable items have been signed. Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes Now Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor LUIUm hackfill unless sinned off) Sewer Water Engineering Backflow (Testable Only) Water Service