Loading...
445 S ADRIA PLPermit Types ELE MEC X .mit Number: BLD2022-03332 Issued: 07/21/2022 www.anatheirn.net/building (714)765-0626 Quarter Section: 54 ..� � Y OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (7141765. 5153 Site Address: 445 S ADRIA PL, ANAHEIM, CA 92802 Legal Description: N TR 3673 ELK LOT 24 TR 3673 LOT 24 ALL -EX S 1.18 APN: 25006209 Project Description: Patio Cover: 336 sq ft for attached solid patio cover with electrical Lying Area: Number of Stades: 0 valuation: 12,000.00 Garage Area: Conswcuon Types: VB CarportArea: Occupancy Groups: Balcony I Deck Area: Fire Sprinkbred: No Cool Roof: Total Fee, paid for Permit: 367.30 People Associated with Project: Permit Applicant Made Paniagus Owner PANIAGUA MARIA E 445 S AARIA PL Type Electrical Fixtures City Type Plumbing Fixtures ally Mechanical Flxlures ally Receptacle, switches. lights 5 The permit shall expire by limitation and become null and void If the building or work has not passed final Inspection 365 days from the dale of permit Issuance. A new permit is required to commence or continue work. '�PHEtAt �,1< Cityof Anaheim of !nO Building Division _� i �OVNDEO tt,7 Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765.4280 Engineering Final (714) 765-5126 INSPECTION DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub Llst/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migatton Measures Do not install sub0oor or pour Floor slab until the follwing applicable items have been sioned Building Final (714 765.5153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections PERMIT FxPIRE.p Mechanical (Groundwork) Electrical (Underground Conduit) Pre-slab(Compaction/MembraneReinf.) Floor (Joist/Girders) ITN�pEGTI1�N Underfloor Insulation (Raised Foundation Only) N1 rTr—.-, COMPLETED Floor Nailing (Raised Foundation Only) H 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have BATE. 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagatlon Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mac. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow, (Testable Only) Water Service