445 S ADRIA PL (2)Permit Types
ELE MEC
X
.mit Number: BLD2022-03332
Issued: 07/21/2022
www.anatheirn.net/building
(714)765-0626
Quarter Section: 54
..� � Y OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(7141765. 5153
Site Address: 445 S ADRIA PL, ANAHEIM, CA 92802
Legal Description: N TR 3673 ELK LOT 24 TR 3673 LOT 24 ALL -EX S 1.18
APN: 25006209
Project Description: Patio Cover: 336 sq ft for attached solid patio cover with electrical
Lying Area: Number of Stades:
0 valuation:
12,000.00
Garage Area:
Conswcuon Types:
VB
CarportArea:
Occupancy Groups:
Balcony I Deck Area:
Fire Sprinkbred:
No
Cool Roof:
Total Fee, paid for Permit:
367.30
People Associated with Project:
Permit Applicant Made Paniagus
Owner PANIAGUA MARIA E 445 S AARIA PL
Type Electrical Fixtures City Type Plumbing Fixtures
ally Mechanical Flxlures
ally
Receptacle, switches. lights 5
The permit shall expire by limitation and become null and void If the building or work has not passed final Inspection 365 days from the
dale of permit Issuance. A new permit is required to commence or continue work.
'�PHEtAt �,1<
Cityof Anaheim of !nO
Building Division _� i
�OVNDEO tt,7
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765.4280
Engineering Final (714) 765-5126
INSPECTION
DATE
I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub Llst/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migatton Measures
Do not install sub0oor or pour Floor slab until the follwing applicable items have been
sioned
Building Final (714 765.5153)
Last Inspection -Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
PERMIT FxPIRE.p
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre-slab(Compaction/MembraneReinf.)
Floor (Joist/Girders)
ITN�pEGTI1�N
Underfloor Insulation (Raised Foundation Only)
N1 rTr—.-,
COMPLETED
Floor Nailing (Raised Foundation Only)
H
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
BATE.
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagatlon Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mac. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow, (Testable Only)
Water Service