Loading...
806 S NUTWOOD ST BPermit Types BLD ELE MEC 1 PLM x x x x Permit Number: BLD2022-00195 Issued: 01/04/2023 www.anaheirn.net/building (714)765-4626 Quarter Section: 48 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. f7141 765 -5153 Site Address: 806 S NUTWOOD ST B, ANAHEIM, CA 92804 Legal Description: S TWP 4 RGE 10 SEC 17 SEC 17 T 4 R 10 N 62 FT W 17 APN: 12823602 Project Description: (ADU) New Residential Construction: 735 sq ft to construct new two -bedroom two -bathroom accessory dwelling unit with 24 sq ft porch. REF: BLD2022-00193/00194, BLD2023-00009 Living Area: 735 Number of Stones: 1 Valuation: Garage Area: Construction Types: Carport Area: Occupancy Groups: Balcony / Deck Area: Fire Spnnklered: Cool Roof: Total Fees paid for perms: People Associated with Project: Owner OROZCO IVAN D 8 ERIKA T 806 S NUTWOOD ST Engineer- Civil IGNACIO OCHOA 8191 KINGSDALE DR200711301545084330 HUNTINGTON BEACH, CA 92646 126.000.00 VB R3 No 5,676.68 Type Electrical Fixtures Oty Type Plumbing Fixtures Oty Mechanical Fixtures Oty New or total rewire -1 or 2 family 735 Bath Tub 2 Air Handling Units 1 Sub PaneIrremp Pwr - Under 600 V, up to 1 Garbage Disposal 1 Ventilation Fan - <= 300 cfm on single duct 3 200 amps Kitchen Sink 1 Lavatory 2 Sewer per 100 ft. 1 Washing Machine Rough 1 Water Closet 2 Water Heater 1 The permit shall expire by limitation and become null and void Ifthe building or work has not passed final Inspection 365 days from the date of permit issuance. A new permit Is required to commence or continue work. City of Anaheim Building Division FINAL INSPECTIONS I DATE I INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final 7 Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Do not occupy this building until the final inspections have been made. lEngineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed. Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been stoned, Building Final (714 765-5153) Plumbing (Ground/Underfloor Water) Last Inspection -Final Only After Above Completed 1),9 Underfloor Rough Gas Mechanical (Groundwork) PARTIAL INSPECTIONS Electrical (Underground Conduit) Building Inspections Reinf Insulation (Raised Foundation lg (Raised Foundation Only) Floor (Floor Nailin£ I not cover or conceal 1st Floor Shear Firesprinkler (Rt 2nd Floor Shear Roof (Sheathing y (Reinf./Bond Beam/Pre-Grout) Plumbing (Top Out) Duct (Mechanical) Mechanical Electrical COA/Mitagation Measures I (Only after Plbg_ Ele.. Mec. & Fire) Do not tape or plaster until the following applicable items have been signed Drywall ?-I?- Z 3 .L-.. Penetrations (Ele, Met: & Plbg) Lath Lath d Service Meter -(Meter will be set within 2-3 days after approval) Excludes New Exterior Plaster (Brown Coat) til L T-Bar (Struct., (Fe or Mec.) Mechanical Inspections Plumbing Inspections Electrical Inspections 3--23 Backflow Service