806 S NUTWOOD STPermit Types
BLD
ELE
MEC
PLM
X
X
Permit Number: BLD2022-00194
Issued: 01/04/2023
www.anahelm.net/building
(714)765-4626
Quarter Section: 48
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(7141 765. 5153
Site Address: 806 S NUTWOOD ST, ANAHEIM, CA 92804
Legal Description: S TWP 4 RGE 10 SEC 17 SEC 17 T 4 R 10 N 62 FT W 17
APN: 12823602
Project Description: Accessory Structure: 441 sq R to construct new detached garage. REF: BLD2022-00193/00195, BLD2023-00009
Living Area: Numl ar of Stories: 1 Valuation:
Garage Area: "I ConsVuction Types:
Carport Area: Occupancy Groups:
Balcony / Deck Area: Fire Sprinklered:
Cool Roof: Total Fees paid for Parrett:
People Associated with Project:
Owner OROZCO IVAN D 6 ERIKA T 8D6 S NUTWOOD ST
Engineer- Civil IGNACIO OCHOA 8191 KINGSDALE DR200711301545084330 HUNTINGTON BEACH, CA 92646
20,000.00
Val
No
1.631.36
Type Electrical Fixtures Oty Type Plumbing Fixtures Qty Mechanical Fixtures Oty
Meter/Disc Sw - Under 600 V. up to 200 2
amps
New or total rewire - garage/carport 441
The permit shall expire by limitation and become null and void If the building or work has not passed final Inspection 365 days from the
date of permit Issuance. A new permit is required to common" or continue work.
City of Anaheim "Elm C7<
o io
Building Division F Z
U ;
�OGNDED. t8�^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
I DATE
I INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
fp Zj
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION
I DATE
I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed
Fire Dept. Final (714) 765.5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 7654591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-6194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the lwing applicable items have been
sianed
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
•//O ��
�_ �_.
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.) 2
b-z3
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sinned
1st Floor Shear
_
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mec. 6 Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec 8 Plbg)
Interior Lath
Exterior Lath
.,v,
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Min not backfill uni,,%q red off)
Sewer
Water Engineering Backflow (Testable Only)
Water Service