Loading...
806 S NUTWOOD ST B (2)Permit Types BLD ELE MEC PLM X X Permit Number: BLD2023.00009 Issued: 01/04/2023 www.anaheim.net/building (714)7654626 Quarter Section: 48 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (7141765 -5153 Site Address: 806 S NUTWOOD ST B, ANAHEIM, CA 92804 Legal Descriptlon: S TWP 4 RGE 10 SEC 17 SEC 17 T 4 R 10 N 62 FT W 17 APN: 12823602 Project Description: Photovoltaic System with Micro -Inverters: Installation of residential roof mounted system with (10) modules, (10) micro -inverters, (1) 200 amp sub panel and (1) 125 amp combiner box for new detached accessory dwelling unit. REF: BLD2022-00193/00194100195 Living Area: Number of Stories: 1 Valuation: 10.000.00 Garage Area: Conslr ction Types: N/A Carport Area: Occupancy Groups: Balcony / Deck Area: Fire Spmnklered: No Cool Roof: Total Fees paid for Permit: 383.30 People Associated with Project: Permit Applicant CHARLIE CNGUVEN 5414 WEST LEHNHARDT AVENUE SANTA ANA, CA 92704 Owner OROZCO IVAN D S ERIKA T 806 S NUTWOOD ST Type Electrical Fixtures Qty Type Plumbing Fixtures Qry Mechanical Fixtures City Microinverter 10 Sub Panel/Temp Pwr - Under 600 V, up to 2 200 amps The permit shall expire by limitation and become null and Vold If the building or work has not passed final Inspection 365 days from the date of permit Issuance. A new permit Is required to commence or continue work. P�pHEIM off` Cityof Anaheim oQ io Building Division h 2 �oVNDED tsyA Do not occupy this buildina until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final D C_ Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) (_— Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer 2 _. Z L' Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/FormslTrenches (Footings) 2—t,.-z L' COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable Items have been sinned : Building Final (714 765-5153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Q— --z' Floor (JoistIGirders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sianed. 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing lOnly after Plbg Ele_ Mac. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed. Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath -- 2 Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) 3, 2 1-2 (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service