206 S EMERALD STPermit Types
CITY OF ANAHEIM
GLD 1 ELE MEC PLM
X
BUILDING DIVISION
Permit Number: BLD2024-04017
200 S. ANAHEIM BLVD.
Issued: 08/05/2024
(714) 765 - 5153
www.anaheim,net/building
(714)765-4626
Quarter Section: 40
Site Address: 206 S EMERALD ST B, Anaheim, CA 92804
Legal Description: N TR 2299 ELK LOT 103
APN: 12804221 ;W
-
Project Description: Residential EV Charger
Living Area: Number of Stories: i
Valuation:
Garage Area:
Construction Types:
CarportArea:
Occupancy Groups:
Balcony! Dock Area:
Fire Sprinklered:
Cool Roof:
Total
Fees paid for Permit:
People Associated with Project:
Permit Applicant Sai Kumar Chilikela
Owner CHITIKELA, SAI KUMAR 206 S EMERALD ST
PN pN Li n;
i
4kIF
j.
0,00
N/A
172,00
Type Electrical Fixtures City Type Plumbing Fixtures Qty Mechanical Fixtures Cty
EV Charger 1
The permit shall expire by limitation and become null and void If the building or work has not passed final Inspection 365 days from the
date of permit Issuance. A new permit is required to commence or continue work.
P�PH Elm"
ityof Anaheim o4 io
Building Division ti 2
U >
OVNOED t�ti
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final 94-zM
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION
I DATE
I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed.
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground ElectrodelUfer
Sub LisUBus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
sianed
Building Final (714 765-5153)
Last Inspection -Final Only Aker Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Onfy)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sioned
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele.. Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed
Drywall
Drywall Penetrations (Ele, Mac & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
(Do not backfill unless sinned riff)
Sewer
Water Engineering Backflow (Testable Only)
Water Service