Loading...
206 S EMERALD STPermit Types CITY OF ANAHEIM GLD 1 ELE MEC PLM X BUILDING DIVISION Permit Number: BLD2024-04017 200 S. ANAHEIM BLVD. Issued: 08/05/2024 (714) 765 - 5153 www.anaheim,net/building (714)765-4626 Quarter Section: 40 Site Address: 206 S EMERALD ST B, Anaheim, CA 92804 Legal Description: N TR 2299 ELK LOT 103 APN: 12804221 ;W - Project Description: Residential EV Charger Living Area: Number of Stories: i Valuation: Garage Area: Construction Types: CarportArea: Occupancy Groups: Balcony! Dock Area: Fire Sprinklered: Cool Roof: Total Fees paid for Permit: People Associated with Project: Permit Applicant Sai Kumar Chilikela Owner CHITIKELA, SAI KUMAR 206 S EMERALD ST PN pN Li n; i 4kIF j. 0,00 N/A 172,00 Type Electrical Fixtures City Type Plumbing Fixtures Qty Mechanical Fixtures Cty EV Charger 1 The permit shall expire by limitation and become null and void If the building or work has not passed final Inspection 365 days from the date of permit Issuance. A new permit is required to commence or continue work. P�PH Elm" ityof Anaheim o4 io Building Division ti 2 U > OVNOED t�ti Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final 94-zM Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed. Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground ElectrodelUfer Sub LisUBus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been sianed Building Final (714 765-5153) Last Inspection -Final Only Aker Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Onfy) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sioned 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele.. Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed Drywall Drywall Penetrations (Ele, Mac & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor (Do not backfill unless sinned riff) Sewer Water Engineering Backflow (Testable Only) Water Service