Loading...
57R-3963 - - RESOLUTION NO. 3963 .,,-.... , A RESOLUTION OF THE CITY CQUNCIL OF THE CITY OF ANAHEI M AUTHORIZING THE PURCHASE AND INSTALLATION OF ONE DEEP WELL, TURBINE TYPE PUMPING UNIT IN WELL #~7, IN THE CITY OF ANAHEIM, WORK ORDER NO. ~508. WHEREAS, the City Counci~ does find and determine that pub~ic convenience and necessity require the purohase and instal~ation of one e~ectrically driven, deep well, turbine type pumping unit, to be installed in Wel~ #~7, ~ocated 9 feet South of the center line of Underhill street and 45 feet West of the center line of Sunkist Street, in the City of Anaheim, complying with the fo~lowing specifications: OPERATING CONDITIONS: Well Depth Well Diameter Standing Water Leve~ Total Pump Head Max Speed of Unit Length of Column Total Capacity H.P. Hotor WELL #17 6.381 1611 177' 3J4' - 400' 1760 RPM 240' 1150 - 1000 GfJ( ~25 HP DETAIL SPECIFICATIONS: Size of Co~umn Pipe Size of Oil Tubing Size of Shafting Pump Bowls Pump Bowls, Size Pump Discharge, Size Outer Column Pipe Length Outer Column Pipe Threads 811 ID Schedule .30 2-1/211 Ex Heavy Soh. 80 1-11/1611 1020-1045 Cast Iron Enam.lined 11-1/2" OD Max 811 std. Flanged 10' Exact, Eaoh 8 Pitch r\ The outer column pipe 1s to butt squarely in its coup~ing. The co~umn coupling sha~l be made from extra heavy se...~ess tubing. The Oil t~be bearings shall be made of bronze with one bearing to each 5' length of tubing. Bearings to be threaded externally and fitted in internally threaded tubing with ends properly faced. The discharge head shall be made of cast iron or stee~ sole plate and shall be provided with 8" Std. Discharge Flange, complete with bolts and gaskets. A Solenoid type oiler shall te provided and provisions made for locking oil reservoir filler cap. The pump bowls shall be of close-grained cast iron, having a minimum tensile strength of 30,000 pounds per square inch, free from blow holes, sand holes, and all other faults; accurately machined and fitted to close dimensions. The impeller shaft shall be of stainless steel of not less than 12% Chrome. No so-called rustless iron will be oon- sidered. The impeller shaft shall be supported by water lubricated bronze bearings on both sides of each impeller. -1- - .-.. I""""""' SCOPE: The equipment covered shall include, without limi ting the generality thereof, all mechanical,' hydraul- ic, electrical and miscellaneous equipment for one electrically driven deep well turbine type pumping unit, completely installed in Well #17 in the City of Anaheim, California. Electric wiring, starting equipment and piping to pump will be furnished and installed by others. in accordance with the design, plans, profiles, drawings and/or specifications prepared by the Superintendent of the Light, Power and Water Department of the City of Anaheim; and WHEREAS, Food Machinery & Chemical Corporation, Peerless Pump Division has offered to furnish said deep well turbine type pumping unit complling with said specifications and install the same within six (6) working days from and after notice of accept- ance of its offer, for the price of #6,194.00, payable as follows: Eighty-five (85) per cent of said amount to be paid upon delivery and completion of the installation of said pump in Well #17, in the City of Anaheim; and the remaining fifteen (15) per cent of said amount to be withheld for a period of thirty (30) days from and after completion of the installation of said pump and final acceptance of said work, and the filing of a notice of completion by the City of Anaheim. AND WHEREAS, the City Council finds that said prioe is the lowest obtainable for the purchase and installation of said pump and that the offer of Food Machinery & Chemical Corporation, Peerless Pump Division should be accepted upon the conditions hereinafter set forth; NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Anaheim that the offer of Food Machinery & Chemical Corporation, Peerless Pump Division to sell to the City of Anaheim and install in Water Well No. 17 owned by the City, one eleotrioally driven, deep well, turbine type pumping unit, com- plying with the specifications hereinabove Bet forth, be, and the same is hereby, accepted upon the following conditions: 1. That said pump shall comply in all respects with the specifications hereinabove set forth, and shall be installed in said well within a period of six (6) working days from and after receipt of notice from the City of Anaheim of the acceptance of said offer. r 2. That said pump shall be installed in said well ready for operation, exclusive of piping and wiring, and starting equipment. 3. That in the installation of said electrically driven, deep well, turbine type pumping unit in said Water Well No. 17 it shall be expreSSly understood and agreed that Food Machinery & Chemical Corporation, Peerless Pump Division is acting as an independent contractor and not as an agent, servant or employee of the City of Anaheim. 4. That said installation shall be made in accordance with the specifications and requirements of the Superintendent of the Light, Water and Power Department of the City of Anaheim. -2- - - , ~. THE FOREGOING RESOLUTION is signed and approved by me this 25th day of June, 1957. IIA~~ OF AJWlJ:IM ;[ .. . ~O?~WEIM STATE OF CALIFORNIA COUN'l'Y OF OIlANClE CITY OF ANAHEIM ) ) SS. ) I. DENE M. WILLIAMS. City Clerk of the City of Anaheim, do hereby certify that the foregoing Resolution was passed and adopted at a regular meeting of the City Council held on the 25th day of June. 1957, by the follow- ing vote of the members thereof: .AYE S: NOES: COUNCILMEN: COOl1$, Fry, Schutu and Wis-. COUNCILMEN: 10. ABSENT: COUNCILMEN: hano. AND I FURTHER CERTIFY that the Mayor Pro Tem of the City of .Anaheim signed and approved said Resolution on the 25th day of June. 1957. IN WITNESS WHEREOF, I have hereunto set my hand and affixed the seal of the City of Anaheim this 25th day of June, 1957. ~ '~. ~'!BE~IlI (sur.) r -)- If' ..