805 E SOUTH STPermit Types
BLD ELE MEC I FILM
X I
Permit Number: BLD2012-03347
Issued:09/28/2012
CITY OF ANAHEIM
INSPECTION REQUEST LINE:
BUILDING DIVISION
(714) 765 - 4626
200 S. ANAHEIM BLVD.
Quarter Section: 94
(714) 765 • 5153
Site Address: 805 E SOUTH ST'(AT&T)
Legal Description: VINEYARD LOTS LOT H-1 W 1/2 -INC POR
Project Description: Antenna Cell Site: Modify (1) existing 70' high monopine, Install (1) GPS antenna. Replace (9) antennas
with (12) 8' high antennas and install (1) indoor rack.
Valuation:
S50.000.00
Construcion Types:
N/A. .
Fire Sprinklered?
No
Cool Roof
No
Total Fees paid for Permit:
86.20
People Associated with Project:
Contractor BROKEN ARROW COMMUNICATIONS INC 8316 CORONA LOOP NE ALBUQUERQUE NM 87113 0000
Permit Applicant WILLIAM LARSON
Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Type Mechanical Fixtures Qty
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 366 days from the date of
permit issuance. A new permit is required to commence or continue work.
P�pH Elm Cq(
City of Anaheim 06 v0
Building Division ti ?
>
OED very^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final �I
r
Mechanical Final
Cross Connection Control (714) 765
P
Engineering Final (714) 765-5126
INSPECTION
I DATE
I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub LisVBus. Lic. (714) 765.5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
sinned
Building Final (714 765.5153)
Last Inspection -Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sioned
list Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Do not backfill unless sioned off)
Sewer
Water Engineering Backflow (Testable Only)
Water Service