Loading...
721 S ECHO STPermit Types BLD ELE MEC PLM X X Permit Number: BLD2023-06388 Issued: 12/20/2023 www.anaheim.net/building (714)765-4626 Quarter Section: 48 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 -5153 Site Address: 721 S ECHO ST, Anaheim, CA 92804 Legal Description: N TR 2425 ELK LOT 167 APN: 12823112 Project Description: Photovoltaic System: Install residential roof mounted solar system with (26) modules, (1) inverter, and 225A main panel upgrade Living Area: Number of Stories: t Valuation 29,000,00 Garage Area Construction Types: VB Carport Area: Occupancy Groups: Balcony / Deck Area: Fire Spnnklered: No Cool Roof Total Fees paid for Permit: 768.77 People Associated with Project: Contractor CES CONSTRUCTION 417 W ALLEN AVE STE 105 SAN DIMAS, CA 91773 Permit Applicant Aldo Cassio Owner HAUSRATH, DAVID L TR 721 S ECHO ST Type Electrical Fixtures Qty Type Plumbing Fixtures Cry Mechanical Fixtures Qty Inverter 1 Meter/Disc Sw - Under 600 V, up to 200 1 amps The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. P�PH Eli cq` City of Anaheim o4 TD Building Division F Z �DVfyDED tarn Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final ' zc zy Plumbing Final Mechanical Final Cross Connection Control (714) 7654280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 7654591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow W business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour Floor slab until the follwing applicable items have been goned Building Final (714 765-5153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sr oned 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg_ Ele_ Mac. & Fire) Insulation (Sound/Energy) Do riot tape or plaster until the following applicable items have been signed. Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor (Do not harli 11 unless mmed off) Sewer Water Engineering Backflow (Testable Only) Water Service