Loading...
501 N EAST STPermit Types BLD ELE I MEC I PLM CITY OF ANAHEIM X BUILDING DIVISION Permit Number: BLD2024-04478 200 S. ANAHEIM BLVD. Issued:08/26/2024 (7141765.5153 '/1 www.anaheim.net/building - / (714)765-4626 Quarter Section: 92 Site Address: 501 N EAST ST, Anaheim, CA 92805 Legal Description: N TR 549 BLK A LOT 7 TR 549 LOT 7 ELK A AND SLY 40 APN: 03521425 Project Description: Reroof: Remove and Install (33) squares of flat torch down and (1) square of broken tile replacement on facia CRCC 0616-0011A and ESR4395 (REF: BLD2000-00814) Living Area: Number of Stories: 0 Valuation: 9,gito= Garage Area: Construction Types: N/A Carport Area: Occupancy Groups: Balcony / Deck Area: Fire Sprinklered: Cool Roof: Total Fees paid for Permit: 383.77 People Associated with Project: Contractor ADVANCED ROOFING SYSTEMS INC 2801 JUNIPERO AVE SUITE 200 SIGNAL HILL, CA 90755 Permit Applicant Estanani Aguilar Owner GOYA, MELVIN S TR 9657 AVENIDA MONTEREY Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the date of permit Issuance. A new permit is required to commence or continue work. P�r,NEfM cqt Cityof Anaheim 04 io Building Division \Z J �'� - �OVNDEO vsh^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765.4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765.5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 7655041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground ElectrodelUfer Sub List/Bus. Lic. (714) 765.5194 (Allow 10 business days) SetbacklFOrms/Trenches (Footings) COAIMigation Measures Do not install suo'cor or pour Floor slab until the follwing applicable items have been d. Building Final (7147655153)sione last Inspection -Final Only After Above Completed yrSjZ�t �j- Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (JoistlGirders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have i n 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof(SheathinglDiaphragmlFrame) Masonry (Reinf.lBond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COAIMitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed. Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor (no hackfill unless s,cneH off) not Sewer Water Engineering Backflow (Testable Only) Water Service