Loading...
210 S LAXORE STPermit Types BLD ELE MECI PLM X Permit Number: BLD2019-03641 Issued: 07/30/2019 INSPECTION REQUEST LINE: (714) 765 - 4626 Quarter Section: 13 Site Address: 210 S LAXORE ST Legal Description: N TR 4261 LOT 17 Project Description: Residential Remodel: Replace (1) patio door. Like fo like. People Associated with Project CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 Valuation: Construcion Types: Total Fees paid for Permit: $2.288.00 WA, , 162.00 Owner GREG LYNCH TR 14692 CHESHIRE PL TUSTIN CA 92780-6618 Contractor THE HOME DEPOT 1095 N PULLMAN ST ANAHEIM CA 92807 0000 Permit Applicant JEFFREY FED Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Type Mechanical Fixtures Qty The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. f ,. HNNEIM Cd Cityof Anaheim DF P C�0 Building Division F z LADED Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final �, ' �/ X F i Plumbing Final C` P V —T 1 Q Mechanical Final - ? r Cross Connection Control (714) 7664260' Engineering Final (714) 765-5126 INSPECTION I DATE INSPECTOR Fire Sprinkler (ONLY) (714) 765-504�4\ I. C Do not pour concrete until the following applicable items have been signer Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub LisVBus. Lic. (714) 765-5194 (Allow 10 business days) SetbacklForms/Trenches (Footings) COA/Migation Measures Do not instate suotioor or pour ficor slao unu the roi,,r� g a ,p,,,oie sterns have been sinned Building Final (714 7655153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have 5,ancd list Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing Only after Plbg. Ele Mec. & Fire) Insulation (Sound/Energy) er :apc or pas vi one ioi,o ing apphca.t - S have oeen signed Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service