Permit Number: BLD2019-03641
Issued: 07/30/2019
INSPECTION REQUEST LINE:
(714) 765 - 4626
Quarter Section: 13
Site Address: 210 S LAXORE ST
Legal Description: N TR 4261 LOT 17
Project Description: Residential Remodel: Replace (1) patio door. Like fo like.
People Associated with Project
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 - 5153
Valuation:
Construcion Types:
Total Fees paid for Permit:
$2.288.00
WA, ,
162.00
Owner GREG LYNCH TR 14692 CHESHIRE PL TUSTIN CA 92780-6618
Contractor THE HOME DEPOT 1095 N PULLMAN ST ANAHEIM CA 92807 0000
Permit Applicant JEFFREY FED
Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Type Mechanical Fixtures Qty
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of
permit issuance. A new permit is required to commence or continue work. f ,.
HNNEIM Cd
Cityof Anaheim DF P C�0
Building Division F z
LADED
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final �, '
�/
X F i
Plumbing Final C` P V
—T 1 Q
Mechanical Final -
?
r
Cross Connection Control (714) 7664260'
Engineering Final (714) 765-5126
INSPECTION I
DATE
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-504�4\ I. C
Do not pour concrete until the following applicable items have been signer
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub LisVBus. Lic. (714) 765-5194 (Allow 10 business days)
SetbacklForms/Trenches (Footings)
COA/Migation Measures
Do not instate suotioor or pour ficor slao unu the roi,,r� g a ,p,,,oie sterns have been
sinned
Building Final (714 7655153)
Last Inspection -Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
5,ancd
list Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing Only after Plbg. Ele Mec. & Fire)
Insulation (Sound/Energy)
er :apc or pas vi one ioi,o ing apphca.t - S have oeen signed
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service