Loading...
912 S HAYWARD STPermit Types BLD ELE MEC PLM X Permit Number: BLD2023-05162 Issued: 10/04/2023 www.anaheim.net/build i ng (714)765-4626 Quarter Section: 10 Site Address: 912 S HAYWARD ST. ANAHEIM, CA 92804 Legal Description: N TR 3823 BLK LOT 28 APN: 07989321 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 • 5153 Project Description: Reroof: Remove existing to install (26) sq of composition shingles over entire house and attached garage Living Area: Number of Stories: 1 Valuation: Garage Area: Construction Types: Carport Area: Occupancy Groups: Balcony I Deck Area: Fife Sprinklered: Cool Root: Total Fees paid for Permit People Associated with Project: Contractor CORNERSTONE CONSTRUCTION &AMP: ROO 7171 SYRACUSE AVENUE STANTON, CA Permit Applicant Viet -Pram Owner TRAN, )LONG VAN 912 S HAYWARD ST Type Electrical Fixtures Qty Type Plumbing Fixtures Cry Mechanical Fixtures `1 1 15.500,00 VA 351.02 The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. P�PHEIM < Cityof Ana hei m OF iQ Building Division F�Z v,I, > SOU" DED t Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been signedBuilding Final (714 765-5163) Last Inspection -Final Only After Above Completed C i Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not Cover or conceal the work below until the tallawing applicable items have n i n 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing Only after Plbg Ele Mec & Rre) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days afte, approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor P f S,01i off, Sewer Water Engineering Backflow (Testable Only) Water Service