912 S HAYWARD STPermit Types
BLD ELE MEC PLM
X
Permit Number: BLD2023-05162
Issued: 10/04/2023
www.anaheim.net/build i ng
(714)765-4626
Quarter Section: 10
Site Address: 912 S HAYWARD ST. ANAHEIM, CA 92804
Legal Description: N TR 3823 BLK LOT 28
APN: 07989321
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 • 5153
Project Description: Reroof: Remove existing to install (26) sq of composition shingles over entire house and attached garage
Living Area: Number of Stories: 1 Valuation:
Garage Area: Construction Types:
Carport Area: Occupancy Groups:
Balcony I Deck Area: Fife Sprinklered:
Cool Root: Total Fees paid for Permit
People Associated with Project:
Contractor CORNERSTONE CONSTRUCTION &: ROO 7171 SYRACUSE AVENUE STANTON, CA
Permit Applicant Viet -Pram
Owner TRAN, )LONG VAN 912 S HAYWARD ST
Type Electrical Fixtures Qty Type Plumbing Fixtures Cry Mechanical Fixtures
`1 1
15.500,00
VA
351.02
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit issuance. A new permit is required to commence or continue work.
P�PHEIM <
Cityof Ana hei m OF iQ
Building Division F�Z
v,I, >
SOU" DED t
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION
DATE
I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
signedBuilding
Final (714 765-5163)
Last Inspection -Final Only After Above Completed
C i
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not Cover or conceal the work below until the tallawing applicable items have
n i n
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing Only after Plbg Ele Mec & Rre)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days afte, approval) Excludes New
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
P f S,01i off,
Sewer
Water Engineering Backflow (Testable Only)
Water Service