Loading...
821 S HALLIDAY ST (2)X X X X Permit Types LLD ELE MEC PLM Permit Number: BLD2021-04216 Issued: 09/23/2021 INSPECTION REQUEST LINE: (714) 765 - 4626 Quarter Section: 10 Site Address: 821 S HALLIDAY ST Legal Description: N TR 3823 LOT 77 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 Project Description: Residential Remodel: (2) showers with tile and to upgrade mechanical and electrical fixtures in bathr000ms. Valuation: $10,000.00 Construcion Types: WA, , Total Fees paid for Permit: 348.30 People Associated with Project Owner JOSEPH VERDI TR 821 S HALLIDAY ST ANAHEIM CA 92804-3816 Contractor J R M BUILDER 10282 TRASK AVE STE C GARDEN GROVE CA 92843 Permit Applicant JUSTIN HOANG J R M BUILDER Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Type Mechanical Fixtures Qty Receptacle, switches, lights 4 Shower 2 Ventilation Fan - <= 300 cm on single duct 2 The permit shall expire by limitation and become null and void If the building or work has not passed final Inspection 365 days from the date of permit Issuance. A new permit Is required to commence or continue work. (old_permit combo �pHEIM Cq Cityof Anaheim O� Q \ Building Division _� 2' U " �OVNDED a�,1� Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE IRSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 766.5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765.5041 Do not pour conc cr,_ '.:Ilowng applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been sioned Building Final (714 765.5153) Lest Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas 44C4 yvf or Al- 9- 30 - Zt �- G PARTIAL INSPECTIONS Building Inspections(''�) �n �VI I7�`� Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.)j"1 Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) iNSPECTION Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been soned DA-r F./— 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COAIMitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele.. Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath��Z[ Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construct on Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor fDn not hacId It unless qinnpd off) Sewer Water Engineering Backflow, (Testable Only) Water Service