821 S HALLIDAY ST (2)X X X X
Permit
Types
LLD
ELE
MEC
PLM
Permit Number: BLD2021-04216
Issued: 09/23/2021
INSPECTION REQUEST LINE:
(714) 765 - 4626
Quarter Section: 10
Site Address: 821 S HALLIDAY ST
Legal Description: N TR 3823 LOT 77
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 - 5153
Project Description: Residential Remodel: (2) showers with tile and to upgrade mechanical and electrical fixtures in
bathr000ms.
Valuation: $10,000.00
Construcion Types: WA, ,
Total Fees paid for Permit: 348.30
People Associated with Project
Owner JOSEPH VERDI TR 821 S HALLIDAY ST ANAHEIM CA 92804-3816
Contractor J R M BUILDER 10282 TRASK AVE STE C GARDEN GROVE CA 92843
Permit Applicant JUSTIN HOANG J R M BUILDER
Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Type Mechanical Fixtures Qty
Receptacle, switches, lights 4 Shower 2 Ventilation Fan - <= 300 cm on single duct 2
The permit shall expire by limitation and become null and void If the building or work has not passed final Inspection 365 days from the date of
permit Issuance. A new permit Is required to commence or continue work. (old_permit combo
�pHEIM Cq
Cityof Anaheim O� Q \
Building Division _� 2'
U "
�OVNDED a�,1�
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS DATE
IRSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 766.5126
INSPECTION I
DATE I
INSPECTOR
Fire Sprinkler (ONLY) (714) 765.5041
Do not pour conc cr,_ '.:Ilowng applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
sioned
Building Final (714 765.5153)
Lest Inspection -Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
44C4 yvf or Al- 9- 30 - Zt �- G
PARTIAL INSPECTIONS
Building Inspections(''�) �n
�VI I7�`�
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)j"1
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
iNSPECTION
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been soned
DA-r F./—
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COAIMitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele.. Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath��Z[
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construct on
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
fDn not hacId It unless qinnpd off)
Sewer
Water Engineering Backflow, (Testable Only)
Water Service