160 W CENTER STREET PROMENADEPermit Types
BLD
ELE
MEC
PLM
X
X
Permit Number: BLD2023-06046
Issued: 02/07/2024
vivin.y.anaheim.net/building
(714)765-0626
Quarter Section: 83
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 - 5153
Site Address: 160 W CENTER STREET PROMENADEANAHEIM, CA 92805
Legal Description: N TR 17251 BILK LOT 1
APN: 03701510
Project Description: Residential Remodel: Remove (2) roof mounted waters to install (5) DHW system and (1) circulation pump for
apartment building
Living Area: Number of Stores:
4 Valuation:
38,500.00
Garage Area:
Construction Types:
VB
Carport Area:
Occupancy Groups:
Balcony I Deck Area:
Fire Sprinklered:
No
Cool Roof:
Total Fees paid for Permh:
1,519.78
People Associated with Project:
Contractor AMERICAN POWER SOLUTIONS INC 14355 INDUSTRY CIRCLE LA MIRADA, CA
Permit Applicant John Romero
Owner ANAHEIM REDEVELOPMENT AGENCY PO BOX 3222
Type Electrical Fixtures Oly Type Plumbing Fixtures
City Mechanical Fixtures
O'
Motors - up to 1 h.p. 1 Water Heater
5
Receptacle, switches, lights 4
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit issuance. A new permit is required to commence or continue work.
City of Anaheim PaPNEIM oq`
DF iO
Building Division f Z
v '
�oVNDED vs�^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
a (y(L
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION
I DATE I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (GroundlUnderfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground ElectrodelUfer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/FormslTrenches (Footings)
COAIMigation Measures
Do not install subfloor or pour Floor slab until the follwing applicable items have been
sinned
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reirall
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sioned
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg Ele.. Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service