Loading...
180 W CENTER STREET PROMENADEPermit Types BLD 1 ELE MEC PLM X X Permit Number: BLD2023-06047 Issued: 02/07/2024 www.anaheim.net/building (714)765-4626 Quarter Section: 83 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 -5153 Site Address: 180 W CENTER STREET PROMENADEANAHEIM, CA 92805 Legal Description: N TR 17251 BLK LOT 1 APN: 03701510 Project Description: Plumbing to remove (2) roof mounted water heaters to install (8) DHW water heaters with (2) circulation pumps Living Area: Number of Stories: 4 Valuation: 75,800.00 Garage Area: Construction Types: VA Carport Area: Occupancy Groups: Balcony I Deck Area: Fire Spnnklered: No Cool Roof: Total Fees paid for Permit: 2.21822 People Associated with Project: Contractor AMERICAN POWER SOLUTIONS INC 14355 INDUSTRY CIRCLE LA MIRADA, CA Permit Applicant John Romero Owner ANAHEIM REDEVELOPMENT AGENCY PO BOX 3222 Type Electrical Fixtures Oty Type Plumbing Fixtures City Mechanical Fixtures Qty Motors - Factory Wired Appliance, up to 1 2 Water Heater 8 h.p. Receptacle, switches, lights 6 The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. �PNEIM Cq Cityof Anaheim DF t `'O Building Division f Z u' �oVNOED t K Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final _I Plumbing Final Il�► Z Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765.5041 Do not pour concrete until the following applicable items have been signed Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setbaclo Forms/Trenches (Footings) COAfMigation Measures Do not install subtloor or pour floor slab until the follwing applicable items have been sianed Building Final (714 765-5163) Last Inspection -Final Only After Above Completed 9 Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (JoistlGirders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sioned 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg Ele.. Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable hems have been signed. Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath - Electrical Inspections Electrical Service Meter -(Meter will beset within .: business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow, (Testable Only) Water Service