Loading...
140 S HARBORPermit Types BLD ELE MEC PLM X Permit Number: BLD2012-01019 Issued: 05/11 /2012 INSPECTION REQUEST LINE: (714) 765 - 4626 Quarter Section: 72 Site Address: 140 S HARBOR BLVD Legal Description: CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 Project Description: Tenant Improvement: 200sf. Tenant Improvement to create yoga / message rooms for new yoga / sports therapy studio Valuation: $2,500.00 Construcion Types: N/A, Occupancy Groups: B. , , , Fire Sprinklered? No Cool Root No Total Fees paid for Permit: 753.78 People Associated with Project: Permit Applicant LAUREN REY Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Type Mechanical Fixtures Qty The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. PNPNEIM ��` City of Ana h e i M OF io Building Division ' aZ u > _DE B�^Mechanical Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Final — Cross Connection Control (714) 765.4250 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041N U I cci Do not pour concrete until the foltowmg applicable items have been signed. Fire Dept. Final (714) 765.5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-45 r . Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765.5194 (Allow 10 bustrim ays) — Setback/FormslTrenches (Footings) ICOAiMigation Measures Do not install sub0oor or pour Floor slab until the follwing applicable items have been sioned Building Final (714765.5153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do nol cover or conceal the work below until the following applicable items have 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COAIMitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mac. & Fire) Insulation (SoundlEnergy) Do not tape or plaster until the following applicable items r,. -en signed. Drywall Drywall Penetrations (Ele, Mac & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow, (Testable Only) Water Service