140 S HARBORPermit Types
BLD ELE MEC PLM
X
Permit Number: BLD2012-01019
Issued: 05/11 /2012
INSPECTION REQUEST LINE:
(714) 765 - 4626
Quarter Section: 72
Site Address: 140 S HARBOR BLVD
Legal Description:
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 - 5153
Project Description: Tenant Improvement: 200sf. Tenant Improvement to create yoga / message rooms for new yoga / sports
therapy studio
Valuation:
$2,500.00
Construcion Types:
N/A,
Occupancy Groups:
B. , , ,
Fire Sprinklered?
No
Cool Root
No
Total Fees paid for Permit:
753.78
People Associated with Project:
Permit Applicant LAUREN REY
Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Type Mechanical Fixtures Qty
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of
permit issuance. A new permit is required to commence or continue work.
PNPNEIM ��`
City of Ana h e i M OF io
Building Division ' aZ
u >
_DE B�^Mechanical
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Final —
Cross Connection Control (714) 765.4250
Engineering Final (714) 765-5126
INSPECTION
I DATE I
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041N U I cci
Do not pour concrete until the foltowmg applicable items have been signed.
Fire Dept. Final (714) 765.5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-45 r .
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765.5194 (Allow 10 bustrim ays) —
Setback/FormslTrenches (Footings)
ICOAiMigation Measures
Do not install sub0oor or pour Floor slab until the follwing applicable items have been
sioned
Building Final (714765.5153)
Last Inspection -Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do nol cover or conceal the work below until the following applicable items have
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COAIMitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mac. & Fire)
Insulation (SoundlEnergy)
Do not tape or plaster until the following applicable items r,. -en signed.
Drywall
Drywall Penetrations (Ele, Mac & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow, (Testable Only)
Water Service