919 N ALAMO ST (2)Permit Types
BLD ELE MEC PLM
X
Permit Number: BLD2022.05007
Issued: 10/2012022
www.anahem.net/building
(714)765-0626
Quarter Section: 31
Site Address: 919 N ALAMO ST, ANAHEIM, CA 92801
Legal Description: N TR 1202 BLK LOT 176
APN: 07115213
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 - 5153
Project Description: Reroof: Remove existing material, and install (13) squares of composition shingles for the house
Living Area: Number of Stories: I Valuation:
Garage Area: Construction Types:
Carport Area: Occupancy Groups:
Balcony / Deck Area: Fire Spnnklered:
Cool RcoP Total Fees paid for Parmk:
People Associated with Project:
Permit Applicant Brandon Mazartegos
Owner MOLAR BARBARA D TR 1516 SUNNYCREST DR
Type Electrical Fixtures Oty Type Plumbing Fixtures Oty
Mechanical Fixtures
4,000.00
N/A
339.52
The permit shall expire by limitation and become null and void If the building or work has not passed final inspection 365 days from the
date of permit issuance. A new permit is required to commence or continue work.
P�PHEIM C�`
City of Anaheim o4 !no
Building Division f Z
�OVA'D6p yt+`'
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
p R
Plumbing Final -
RON
Mechanical Final
Cross Connection Control (71 8
Engineering Final (714) 765-5126 -
..
INSPECTION
DATE
INSPECTOR
Fire Sprinkler (ONLY) (714) iRE'
Do not pour concrete until the following applicable items have been signed.
Fire Dept. Final (714)1765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4691
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
sioned
Building Final (714 765.5153)
Last Inspection -Final Only Aker Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sioned
tat Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele- Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed.
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Cnnqtriirfinn
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service