820 N GENEVA ST (2)Permit Types
BLD ELE MEC PLM
X
Permit Number: BLD2024.02183
Issued: 04/30/2024
www.anaheim.net/building
(714)765-4626
Quarter Section: 25
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 - 5153
Site Address: 820 N GENEVA ST, ANAHEIM, CA 92801
Legal Descriptlon: N TR 2390 BLK LOT 32
APN: 07140402
Project Description: Reroof to remove and install (27) squares of composition shingles over house and attached garage
Living Area: Number of Stones:
1 Valuation: 9,885,00
Garage Area:
Construction Types: VB
Carport Area:
Occupancy Groups:
Balcony I Deck Area:
Fire Sprinklered:
Cool Roof:
Total Fees paid for Permit: 350.29
People Associated with Project:
Contractor ROOFTEK RAMP; WATERPROOFING SYSTEM 2440 N GLASSELL ST SUITE U ORANGE, CA 92865
Permit Applicant Tomas Macedo
2440 N Glasseil St Suite U Orange, CA 92865
Owner NGUYEN, THUY THI TR THE T
820 N GENEVA ST
Type Electrical Fixtures Qty Type
Plumbing Fixtures Qty Mechanical Fixtures Qty
The permit shall expire by limitation and become null and void If the building or work has not passed final inspection 365 days from the
date of permit issuance. A new permit is required to commence or continue work.
PNbNEIM c1`
Cityof Anaheim OF �nO
Building Division V�;
pUNpev $F^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 7654126
INSPECTION I
DATE I
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground ElectrodelUfer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
sioned
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
SfOZ 7-
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sianed
tat Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
-I Z
Masonry (Reinf.IBond Beam/Pre-GroUt)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg_ Ele., Mee. 8 Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed.
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-?
business days after approval) Excludes New
Construct on
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service