730 S BEACH BLVD (4)CITY OF ANAHEIM
Permit Types
BLD ELEI MEC PLM
X
Permit Number: BLD2024.04114
Issued: 08/08/2024
www.anaheim.neUbu ilding
(714)7654626
Quarter Section: 14
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 - 5153
-
A,1r�au.
•
Site Address: 730 S BEACH BLVD, Anaheim, CA 92804
Legal Description: S TWP 4 RGE 11 SEC 13 SEC 13 T 4 R 11 E 2.21 AC S
APN: 12612006 -`-
Project Description: Retool: Overlay existing layer with (14) sq of flat roof for carport in the entrance of the apartments
Living Area: Number of Stones: 1 Valuation: 8,000.00
Garage Area: Construction Types: INA
Carpon Area: Occupancy Groups:
Balcony I Deck Area: Fire Bordered:
Cool Roof: Total Fees paid for Permit: 351.24
People Associated with Project:
Contractor EDGE ROOFING INC 3748 MILITARY AVENUE200607050824306180 LOS ANGELES, CA 90034
Permit Applicant Gadan Powell
Owner ADVANCED GROUP 2000-72 15320 BARRANCA PKWY 100
Type Electrical Fixtures Qty Type Plumbing Fixtures City Mechanical Fixtures Qty
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit issuance. A new permit is required to commence or continue work.
? e t
fift
'City of Anaheim PNrdE1M�q<
OF iO
Building Division t z
u >
�OVNDED �
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765.4280
Engineering Final (714) 765-5126
INSPECTION I
DATE
I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed.
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub LisVBus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have beensianed
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
v
\�
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (JoisVGirders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sianed
list Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COAIMitagation Measures
Plumbing Inspections
Framing (Only after Plbg.. Ele., Mee. 8 Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed.
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mee.)
Grease Interceptor
t Do not backfill unless sianed off)
Sewer
Water Engineering Backftow (Testable Only)
Water Service