Loading...
730 S BEACH BLVD (4)CITY OF ANAHEIM Permit Types BLD ELEI MEC PLM X Permit Number: BLD2024.04114 Issued: 08/08/2024 www.anaheim.neUbu ilding (714)7654626 Quarter Section: 14 BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 - A,1r�au. • Site Address: 730 S BEACH BLVD, Anaheim, CA 92804 Legal Description: S TWP 4 RGE 11 SEC 13 SEC 13 T 4 R 11 E 2.21 AC S APN: 12612006 -`- Project Description: Retool: Overlay existing layer with (14) sq of flat roof for carport in the entrance of the apartments Living Area: Number of Stones: 1 Valuation: 8,000.00 Garage Area: Construction Types: INA Carpon Area: Occupancy Groups: Balcony I Deck Area: Fire Bordered: Cool Roof: Total Fees paid for Permit: 351.24 People Associated with Project: Contractor EDGE ROOFING INC 3748 MILITARY AVENUE200607050824306180 LOS ANGELES, CA 90034 Permit Applicant Gadan Powell Owner ADVANCED GROUP 2000-72 15320 BARRANCA PKWY 100 Type Electrical Fixtures Qty Type Plumbing Fixtures City Mechanical Fixtures Qty The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. ? e t fift 'City of Anaheim PNrdE1M�q< OF iO Building Division t z u > �OVNDED � Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765.4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed. Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub LisVBus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have beensianed Building Final (714 765-5153) Last Inspection -Final Only After Above Completed v \� Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (JoisVGirders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sianed list Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COAIMitagation Measures Plumbing Inspections Framing (Only after Plbg.. Ele., Mee. 8 Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed. Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mee.) Grease Interceptor t Do not backfill unless sianed off) Sewer Water Engineering Backftow (Testable Only) Water Service