Loading...
952-964 S CITRON STPermit Types BLD I ELE I MEC I LM X Permit Number: BLD2017-019.50 Issued: 07/27/2017 INSPECTION REQUEST LINE (714) 765 - 4626 Quarter Section: 74 Site Address: 952-964 S CITRON ST Legal Description: CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 Project Description: Repair: Replace/repair water damaged and dry rotted wood framed entry stair way(s) (central entrance) and fire escape on west side of building. Valuation: $15,000.00 Constwcion Types: WA, , Fire Sprinklered? No Cool Roof No Total Fees paid for Permit: 1.773.29 People Associated with Project Owner Engineer STEVEN C HELFRICH 30640 KRISTIN COURT REDLANDS CA 92373 Engineer JON G STROMQUIST 30640 KRISTIN COURT REDLANDS CA Contractor SMOOTHSTONE CONSTRUCTION & CONSULTI 1787 POMONA RD J CORONA CA 92880 0000 Permit Applicant PHIL IAWLER Type Electrical Fixtures City Type Plumbing Fixtures City Type Mechanical Fixtures Qty The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. y,til.IM �. City of Anaheim �< <^ Go Building Division z '' Do not occupy this building until the final Inspections have been made. FINAL INSPECTIONS DATE IN: v All applicable items below must be signed before utilities are releas Final Gas Test Electrical Final Plumbing Final Mechanical Final INSPECTION Cross Connection Control (714) 765.42l '—T. __ Engineering Final (714) 765-5126 INSPECTION DATE INSPECTOR Fire Sprinkler (ONLY) (714) 765-504 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765.4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not instau supfbor or Door rlonr slab until the follwing =i - - ms have been sioned Building Final (714 765-5153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been soned 1 at Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagatlon Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mee.) Grease Interceptor (no not bqrkfill unipss ginned off) Sewer Water Engineering Backflow (Testable Only) Water Service