Loading...
310 S ARCHER STPermit Types SLID ELE MEC PLM X X Permit Number: BLD2024-01226 Issued: 05/06/2024 www.anaheim.net/building (714)765-4.626 Quarter Section: 40 Site Address: 301 S ARCHER ST, Anaheim, CA 928( Legal Description: N TR 3608 BLK LOT 17 APN: 12817133 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 ti r,4�LIA C - F� Project Description: Photovoltaic System: Install residential roof mounted solar system with (42) modules, (2) inverters, 200amp subpanel, 100amp load center, (2) ESS and 200amp main panel upgrade. Living Area: Number of Stones: 0 Valuation: 42,00000 Garage Area: Construction Types: VB CarportArea: Occupancy Groups: Balcony / Deck Area: Fire Spnnklered: Cool Roof: Total Fees paid for Permit: 2.158.46 People Associated with Project: Contractor SUNRUN 21 WORLDS FAIR DRIVE200807221505542300 SOMERSET, NJ 92614 Permit Applicant Melissa Duran Owner AGUILAR-TIMANUS, TRINAJOY 546 S CITRON ST Type Electrical Fixtures Oty Type Plumbing Fixtures Oty ESS (Battery Storage) 2 Inverter 2 Meter/Disc Sw - Under 600 V, up to 200 1 amps Sub Panel/Temp Pwr - Under 600 V, up to 2 200 amps Mechanical Fixtures Oty The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit Issuance. A new permit is required to commence or continue work. P�r,NE1M C.q` Cityof Anaheim O� iO Building Division F i O > �OUyyDED ta"^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final %Pf6 1 Plumbing Final Mechanical Final Cross Connection Control (714) 765-4260 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed Fire Dept. Final (714) 765.5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub LisVBus. Lie. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have beensianed Building Final (714 765.5153) Last Inspection -Final Only After Above Completed / Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sianed list Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele.. Mee. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed. Drywall Drywall Penetrations (Ele, Mee & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mae.) Grease Interceptor (Do not backfril unless soned off) Sewer Water Engineering Backflow (Testable Only) Water Service