180 N MOHLER DR (2)4k
Permit Types
BLD
IELE
MEC
PLM
X
X
Permit Number: OLD2024-04126
Issued: 08/08/2024
www.anaheim.neVbul (ding
(714)7654626
Quarter Section: 196
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 - 5153
Site Address: 180 N MOHLER DR, ANAHEIM, CA 92808
Legal Description: N TR 7730 BLK LOT 52
APN: 35812402
Project Description: Residential Photovoltaic System - Inverters with
ESS
Living Area: Number of Stories:
Valuation. 24,000 00
Garage Area:
Construction Types:
Carport Area:
Occupancy Groups:
Balcony / Deck Area.
Fire Sprinkbred:
Cool Roof:
Total Fees paid for permit: 204.12
People Associated with Project:
Contractor SOCAL SOLAR POWER INC DBA SOCAL ELE
1326 COLE LANE UPLAND, CA
Permit Applicant Frank Fernandez
1326 Cale lane Cole lane Upland, CA 91784
Type Electrical Fixtures Oty Type
Plumbing Fixtures City Mechanical Fixtures City
ESS (Battery Storage) 1
Inverter 1
The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the
date of permit issuance. A new permit is required to commence or continue work.
Pap,NEIM cq`
Cityof Anaheim OF !n0
Building Division y
>
�ObNOED gay^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
es
All applicable items below must be signed before utilitiare released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-6126
INSPECTION I
DATE I
INSPECTOR
Fire Sprinkler (ONLY) (714) 7655041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 7665041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4691
Electrical Ground Electrode/Ufer
Sub LISUBus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
sioned:
Building Final (714 765.5163)
Last Inspection -Final Only After Above Completed
I
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (JoisUGirders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been stoned
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele.. Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed.
Drywall
Drywall Penetrations (Ele, Mee & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service