Loading...
180 N MOHLER DR (2)4k Permit Types BLD IELE MEC PLM X X Permit Number: OLD2024-04126 Issued: 08/08/2024 www.anaheim.neVbul (ding (714)7654626 Quarter Section: 196 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 Site Address: 180 N MOHLER DR, ANAHEIM, CA 92808 Legal Description: N TR 7730 BLK LOT 52 APN: 35812402 Project Description: Residential Photovoltaic System - Inverters with ESS Living Area: Number of Stories: Valuation. 24,000 00 Garage Area: Construction Types: Carport Area: Occupancy Groups: Balcony / Deck Area. Fire Sprinkbred: Cool Roof: Total Fees paid for permit: 204.12 People Associated with Project: Contractor SOCAL SOLAR POWER INC DBA SOCAL ELE 1326 COLE LANE UPLAND, CA Permit Applicant Frank Fernandez 1326 Cale lane Cole lane Upland, CA 91784 Type Electrical Fixtures Oty Type Plumbing Fixtures City Mechanical Fixtures City ESS (Battery Storage) 1 Inverter 1 The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. Pap,NEIM cq` Cityof Anaheim OF !n0 Building Division y > �ObNOED gay^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR es All applicable items below must be signed before utilitiare released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-6126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 7655041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 7665041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4691 Electrical Ground Electrode/Ufer Sub LISUBus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been sioned: Building Final (714 765.5163) Last Inspection -Final Only After Above Completed I Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (JoisUGirders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been stoned 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele.. Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed. Drywall Drywall Penetrations (Ele, Mee & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service