222 N EAST STPermit Types
BLD
ELE
MEC
PLM
X
X
Permit Number: BLD2012-03026
Issued:09/2812012
INSPECTION REQUEST LINE:
(714) 765 - 4626
Quarter Section: 92
Site Address: 222 N EAST ST
Legal Description: ANAHEIM EXT LOT 4 FOR OF LOT AND
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 - 5153
Project Description: Photovoltaic System: Install (1) 13'6" tall ground mount solar flag pole per plan.
Valuation:
$25.000.00
Constmcion Types:
N/A, ,
Fire Spdnklered?
No
Cool Roof
No
Total Fees paid for Permit:
0.00
People Associated with Project
Owner ZION EVANGELICAL CHURCH 222 N EAST ST ANAHEIM CA 92805-3317
Contractor GLEN RAND CONCRETE 1651 WEST 0-12 PALMDALE CA 93551 0000
Permit Applicant GLEN RAND
Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Type Mechanical Fixtures Qty
Meter/Disc Sw- under 600 V. up to 200 1
amps
Generators/Transformers - 1 to 10 hp, 1 to 1
75 kva
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of
permit issuance. A new permit is required to commence or continue work.
PNpNEll cq(
City of Anaheim O4 iO
Building Division y
u 5
OVA'DEo
Do not occupy this buildina until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION
I DATE
I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765.4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765.5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
sioned
Building Final (714 765.5153)
Last Inspection -Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
7-Sll CASE CLOSE t-JlT-loJ7" G!t
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
ApP2oJAL t0✓2 roP� iN�V�r'�+xr!,.
Underfloor Insulation (Raised Foundation Only)
I N R€ 6 T' ^"19H '
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
L
Do not cover or conceal the work below until the following applicable items have
list Floor Shear
\ J
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele.. Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service