Loading...
222 N EAST STPermit Types BLD ELE MEC PLM X X Permit Number: BLD2012-03026 Issued:09/2812012 INSPECTION REQUEST LINE: (714) 765 - 4626 Quarter Section: 92 Site Address: 222 N EAST ST Legal Description: ANAHEIM EXT LOT 4 FOR OF LOT AND CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 Project Description: Photovoltaic System: Install (1) 13'6" tall ground mount solar flag pole per plan. Valuation: $25.000.00 Constmcion Types: N/A, , Fire Spdnklered? No Cool Roof No Total Fees paid for Permit: 0.00 People Associated with Project Owner ZION EVANGELICAL CHURCH 222 N EAST ST ANAHEIM CA 92805-3317 Contractor GLEN RAND CONCRETE 1651 WEST 0-12 PALMDALE CA 93551 0000 Permit Applicant GLEN RAND Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Type Mechanical Fixtures Qty Meter/Disc Sw- under 600 V. up to 200 1 amps Generators/Transformers - 1 to 10 hp, 1 to 1 75 kva The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. PNpNEll cq( City of Anaheim O4 iO Building Division y u 5 OVA'DEo Do not occupy this buildina until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765.4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765.5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been sioned Building Final (714 765.5153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections 7-Sll CASE CLOSE t-JlT-loJ7" G!t Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) ApP2oJAL t0✓2 roP� iN�V�r'�+xr!,. Underfloor Insulation (Raised Foundation Only) I N R€ 6 T' ^"19H ' Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) L Do not cover or conceal the work below until the following applicable items have list Floor Shear \ J Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele.. Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service