Permit Number: BLD2012-01918
Issued: 08/30/2012
INSPECTION REQUEST LINE:
(714) 765 - 4626
Quarter Section: 72
Site Address: 303 W LINCOLN AVE
Legal Description: VINEYARD LOT-D-5 BLK I LOT 9 AND
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 - 5153
Project Description: Antenna Cell Site: Modification to existing telecommunications site for Sprint. Antenna change out,
cabinet change out, (like for like). Upgrade radio hardware, coax and GPS antennas.
Valuation:
$13.500.00
Constmcion Types:
WA, ,
Fire Sprinklered?
No
Total Fees paid for Permit:
651.69
People Associated with Project
Owner P Y B BUILDING CORP %D F JEANSON & ASSOC P O BOX 505 YORBA LINDA CA 92885-
Engineer NESTOR POPOWYCH
Permit Applicant FERNANDO DIAZ
Contractor WIRELESS ACCESS MANAGEMENT COMMUNIC 8821 ARABIAN FILLY LAS VEGAS CA 89143 0000
Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Type Mechanical Fixtures Qty
The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the date of
permit issuance. A new permit is required to commence or continue work. mc_perm: _combc
City of Anaheim PNPHEIM Oq(
OF iO
Building Division F y
u'
• FDUNDED yeryn
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION
I DATE
I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765.4591
Electrical Ground Electrode/Ufer
Sub Llst/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfioor or pour floor slab until the follwing applicable items have been
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed Y
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
+fc-,Lsr- t4-c6E.6 4J,T•11oJT cirf AA?PzVAL. 60C
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/MembraneReinf.)
Floor (Joist/Girders)
-� pj,'{GTIV, i`(. rff�t(Pi 7-17-Ix3
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or Conceal the work below until the following applicable items have
n '
tat Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanicallnspections INSPECTION
NOT CONAPI FTPn
2nd Floor Shear
Roof(Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg.. Ele., Mec. 8 Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service