Loading...
303 W LINCOLNPermit Types BLD ELE MEC I PLM X Permit Number: BLD2012-01918 Issued: 08/30/2012 INSPECTION REQUEST LINE: (714) 765 - 4626 Quarter Section: 72 Site Address: 303 W LINCOLN AVE Legal Description: VINEYARD LOT-D-5 BLK I LOT 9 AND CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 Project Description: Antenna Cell Site: Modification to existing telecommunications site for Sprint. Antenna change out, cabinet change out, (like for like). Upgrade radio hardware, coax and GPS antennas. Valuation: $13.500.00 Constmcion Types: WA, , Fire Sprinklered? No Total Fees paid for Permit: 651.69 People Associated with Project Owner P Y B BUILDING CORP %D F JEANSON & ASSOC P O BOX 505 YORBA LINDA CA 92885- Engineer NESTOR POPOWYCH Permit Applicant FERNANDO DIAZ Contractor WIRELESS ACCESS MANAGEMENT COMMUNIC 8821 ARABIAN FILLY LAS VEGAS CA 89143 0000 Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Type Mechanical Fixtures Qty The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. mc_perm: _combc City of Anaheim PNPHEIM Oq( OF iO Building Division F y u' • FDUNDED yeryn Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765.4591 Electrical Ground Electrode/Ufer Sub Llst/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfioor or pour floor slab until the follwing applicable items have been Building Final (714 765-5153) Last Inspection -Final Only After Above Completed Y Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections +fc-,Lsr- t4-c6E.6 4J,T•11oJT cirf AA?PzVAL. 60C Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/MembraneReinf.) Floor (Joist/Girders) -� pj,'{GTIV, i`(. rff�t(Pi 7-17-Ix3 Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or Conceal the work below until the following applicable items have n ' tat Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanicallnspections INSPECTION NOT CONAPI FTPn 2nd Floor Shear Roof(Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg.. Ele., Mec. 8 Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service