Loading...
521 S FANN ST (2)Permit Types BLD ELE MEC PLM X Permit Number: BLD2024-00924 Issued: 02/23/2024 vinivnivanaheim.net/building (714)765-4626 Quarter Section: 47 Site Address: 521 S FANN ST, Anaheim, CA 92804 Legal Description: N TR 2402 BILK LOT 20 APN: 12809320 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 •5153 Project Description: NEW: Reroof to remove and install (25) squares of composition shingles over house and detached garage Living Area: Number of stones: 1 Valuation: 11,880.00 Garage Area: Construction Types: N/A Carport Area: Occupancy Groups: Balcony / Deck Area: Fire Sprinklered: Cool Root Total Fees paid for Permit: 750.54 People Associated with Project: Contractor ROOF TOP PRO 13602 PLACID DRIVE WHITTIER, CA Permit Applicant DAVID ARZOLA 13602 PLACID DR WHITTIER, CA 90605 Owner CARDENAS, JOSE 8 ARIANA 521 S FANN ST Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the date of permit Issuance. A new permit Is required to commence or continue work. P�ptt Elm off( Cityof Anaheim 041 Building Division F y u > �VNBED tb`r^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS I DATE I INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the fallowing applicable items have been signed Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/FormslTrenches (Footings) COA/Migation Measures Do not install subfloor or pour Floor slab until the follwmg applicable items have been Building Final (714 765.5163) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been �ioned 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof ( heatJvng/Diaphragm/Frame) ti! 1� Z4 ,v,,�_� p ter Masonry (Reinf.IBond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg Ere. Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New rnngriirtinn Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service