Loading...
591 E COMMERCIAL ST (2)Permit Types BLD ELE MEC PLM CITY OF ANAHEIM BUILDING DIVISION Permit Number: BLD2024-01489 200 S. ANAHEIM BLVD. l Issued: 07/23/2024 (714) 765 - 5153 www.anahelm.net/building (714)7654626 Quarter Section: 81 Site Address: 591 E COMMERCIAL ST, Anaheim, CA 92801 Legal Description: S TWP 4 RGE 10 SEC 3 SEC 3 T 4 R 10 S 209.17 FT N1 APN: 26708102 Project Description: Tenant Improvement: Create opening in demising wall and construct enclosure within building for existing electrical switch gear. REF: INV2023-00269 Living Area: Number of Stones: 1 Valuation: 1.500.00 Garage Area: Construction Types: IIIB Carport Area: occupancy Groups: Balcony / Deck Area: Fire Sprinklered: Cool Roof: Total Fees paid for Permit: 1.295.20 People Associated with Project: Permit Applicant Socorro De La Rive Owner DLR HOLDING LLC 421 E COMMERCIAL ST Contractor DE LA RIVA CONSTRUCTION INC 421 E COMMERCIAL ST200808251558552080 ANAHEIM, CA 92801 Engineer Nagi Abo- Shadi 335 N. Puente St. Suite G brea, CA 92821 Architect/Engineer MUSTAFA BDAIWI 601 PARKCENTER DR #204 SANTA ANA, CA 92705 Type Electrical Fixtures City Type Plumbing Fixtures Qty Mechanical Fixtures Cry The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. �NPHEIM cq< Cityof Anaheim O4 iQ Building Division F'- i �OGNDEO fah^/ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 7654280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765<591 Electrical Ground ElectrodelUfer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) SetbacklFonnslTrenches (Footings) COAIMigation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been sioned: Building Final (714 765-5153) Last Inspection -Final Only After Above Completed 44, Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTION Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (JoistlGirders) a Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the fallowing applicable items have been sianed, 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf.lBond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COAIMitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor (Do not backfrll unless �rmed off) Sewer Water Engineering Backflow (Testable Only) Water Service