Loading...
229 N RESH STPermit Types LLD ELE MEC PLM X X X X Permit Number: BLD2012-03135 Issued:09/19/2012 INSPECTION REQUEST LINE: (714) 765 - 4626 Quarter Section: 72 Site Address: 229 N RESH ST Legal Description: RESHS SUB BILK 1 LOT 9 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 Project Description: Residential remodel: Change out sixteen (16) windows, electrical and plumbing for bathroom & kitchen remodel. Associated with Owner Permit Applicant ADAM T LOUCKS Type Electrical Fixtures Receptacle, switches, lights 229 N Qty Type Plumbing Fixtures 29 Lavatory Water Closet Water Heater Dishwasher Kitchen Sink Garbage Disposal Valuation: $8,000.00 Construcion Types: WA, , Fire Spdnklered? No cool Roof No Total Fees paid for Permit: 600.28 92805-2545 Oty Type Mechanical Fixtures 1 Ventilation Fan - <= 300 cfm on single duct 1 1 1 1 1 Qty 1 The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. i Pti EIM C..., Cityof Anaheim e q�!b o ,o. Building Division Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS I DATE I INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final PERMIT XPI En Cross Connection Control (714) 765 Engineering Final (714) 765512 INSPECTION I DATE INSPECTOR Fire Sprinkler (ONLY) (714) 765.5041 Do not pour concrete until the following applicable items have been signed- Fire Dept. Final (714) 765-5041 1144 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 76 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765.5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing appLcable items have been signed Building Final (714 765-5153) Last Inspection -Final Only Aker Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been si ned: tat Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COAIMitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele.. Mee. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor on ( backfill v,,l s, -i n HI Sewer Water Engineering Backflow (Testable Only) Water Service