229 N RESH STPermit Types
LLD
ELE
MEC
PLM
X
X
X
X
Permit Number: BLD2012-03135
Issued:09/19/2012
INSPECTION REQUEST LINE:
(714) 765 - 4626
Quarter Section: 72
Site Address: 229 N RESH ST
Legal Description: RESHS SUB BILK 1 LOT 9
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 - 5153
Project Description: Residential remodel: Change out sixteen (16) windows, electrical and plumbing for bathroom & kitchen
remodel.
Associated with
Owner
Permit Applicant
ADAM T LOUCKS
Type Electrical Fixtures
Receptacle, switches, lights
229 N
Qty Type Plumbing Fixtures
29 Lavatory
Water Closet
Water Heater
Dishwasher
Kitchen Sink
Garbage Disposal
Valuation:
$8,000.00
Construcion Types:
WA, ,
Fire Spdnklered?
No
cool Roof
No
Total Fees paid for Permit:
600.28
92805-2545
Oty Type Mechanical Fixtures
1 Ventilation Fan - <= 300 cfm on single duct
1
1
1
1
1
Qty
1
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of
permit issuance. A new permit is required to commence or continue work.
i Pti EIM C...,
Cityof Anaheim e q�!b
o ,o.
Building Division
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS I
DATE I INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final PERMIT
XPI
En
Cross Connection Control (714) 765
Engineering Final (714) 765512
INSPECTION I
DATE
INSPECTOR
Fire Sprinkler (ONLY) (714) 765.5041
Do not pour concrete until the following applicable items have been signed-
Fire Dept. Final (714) 765-5041 1144
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 76
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765.5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing appLcable items have been
signed
Building Final (714 765-5153)
Last Inspection -Final Only Aker Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been si ned:
tat Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COAIMitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele.. Mee. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
on ( backfill v,,l s, -i n HI
Sewer
Water Engineering Backflow (Testable Only)
Water Service