625 S MAC DUFF STPermh Types
BUD ELE I MEC I PLM
X
Permit Number: BLD2024-04441
Issued: 08/26/2024
v" CITY O�ANAHEIM V
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(7141765 - 5153
www.anaheinn.net/lbuilding
(714)765-4626
Quarter Section: 21
Site Address: 625 S MAC DUFF ST, ANAHEIM, CA 92804
Legal Description: N TR 5108 BLK LOT 38
APN: 12616308
Project Description: Residential EV Charger Level 2
Living Area: Number of Stones:
Valuation:
Garage Area:
Construction Types:
Carport Area:
Occupancy Groups:
Balcony / Deck Area:
Fire Sprinklered:
Cool Roof:
Total Fees paid for Permit:
Wee
1
V6NULV ��'
People Associated with Project:
Contractor AMPZ ELECTRICAL SERVICES 18627 BROOKHURST STREET 427 FOUNTAIN VALLEY, CA
Permit Applicant Adam Ziegler 18627 BROOKHURST ST #427 FOUNTAIN VALLEY, CA 92708
Type Electrical Fixtures City Type Plumbing Fixtures Qty
EV Charger 1
0.00
177.00
Mechanical Fixtures Ot}
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit issuance. A new permit is required to commence or continue work.
.A- -6
' g
City of Anaheim 'NPF1EIM1t Cty
OQ ��
Building Division F i
�0NNoeo �sh�
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-6126
INSPECTION
DATE
I INSPECTOR
Fire Sprinkler (ONLY) (714) 766.5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground ElectrodelUfer
Sub List/Bus. Lic. (714) 765.5194 (Allow 10 business days)
Setback/Formsrrnenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
sioned
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed t
n -
/
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sr aned
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf.IBond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service