Loading...
835 N PINE ST (3)Permit Types BLD 1 ELE MECPIE X Permit Number: BLD2024.04299 Issued: 08/18/2024 www. anahei m.net/bu ilding (714)765-4626 Quarter Section: 61 Site Address: 835 N PINE ST, ANAHEIM, CA 92805 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714)765.5153 0 01Nr'.'- P \/ 8 - z&Z4 yz Legal Description: N TR 1019 BLK LOT 12 APN: 03419322 Project Description: Residential Photovoltaic System - Microinverters (without ESS) Living Area: Number of Stories: valuation: 17,860.00 Garage Area: Construction Types: Carport Area: Ocmpancy Groups: Balcony I Deck Area: Fire Spdnklered: Cool Roof: Total Fees paid for Permh: 177.00 People Associated with Project: Contractor SUNRISE ENERGY GROUP INC 22110 CLARENDON ST SUITE 101 WOODLAND HILLS, CA Permit Applicant MOTI ATIA 15500 Erwin St Unit 1001 Van Nuys, CA 91411 Type Electrical Fixtures Oty Type Plumbing Fixtures Oty Mechanical Fixtures City Microinverter 19 The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. 'NhNEIM Oq` City of Anaheim OF iO Building Division i OVNDED tap^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765.4591 Electrical Ground ElectrodelUfer Sub LisUBus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour Floor slab until the follwing applicable items have been -sioned Building Final (714 765-5163) Last Inspection -Final Only After Above Completed Plumbing(Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sr aned 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele_ Mac. 8 Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construct on Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor (Do not backfill unless sianed off) Sewer Water Engineering Backflow (Testable Only) Water Service