715 S CANYON MIST LNPermit Types
BLD ELE MEC PLM
X
Permit Number: BL02022-03938
Issued: 08/23/2022
wwv,,.anaheim.net/bui1ding
(714)765-4626
Quarter Section: 208
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(7141 765 - 5153
Site Address: 715 S CANYON MIST LN, ANAHEIM, CA 92808
Legal Description: N TR 12689 BLK LOT 18
APN: 35650106
Project Description: Residential Remodel: (30) Retrofit window replacement with new like for like changeouts
Living Area: Number of Stories:
1 Valuation: 16,000.00
Garage Area:
Construction Types: N/A
Carport Area:
Occupancy Groups:
Balcony I Deck Area:
Fire Spnnklered:
Cool Roof:
Total Flea paid for Permit: 583.08
People Associated with Project:
Permit Applicant Robin Redira
Owner HOSSEINI KHATEREH M
715 S CANYON MIST LN
Type Electrical Fixtures Qty Type Plumbing Fixtures Cry Mechanical Fixtures Qry
The permit shall expire by limitation and become null and void If the building or work has not passed final Inspection 365 days from the
date of permit issuance. A new permit is required to commence or continue work.
�f,NEIM ��
Cityof Anaheim Ot r `'�O
Building Division f %
U >
• �ovNDED tali^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION I
DATE I
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signetl.
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
SetbacklForms/Trenches(Footings)
COA/Migation Measures
Do not install subiloor or pour floor slab until the follwing applicable items have been
I n
Building Final (714 765-5163)
Last Inspection -Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections PERMIT EXPIRED
I N S P ECT I n nI
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
NOT COMPLETED
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
r%
i n
2nd Floor (Floor Nailing)
TE
Do not cover or conceal the work below until the following applicable items have
been soned
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing i after Plbg. Fie Mee. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or fill
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service