915 S BROOKHURST ST (12)Permit Types
BLt:
ELE
MEC
PLM
X
X
X
Permit Number: BLD2022-03128
Issued: 0511712023
www.anahejm.nel/building
(714)765<626
Quarter Section: 34
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 - 51
`
Site Address: 915 S BROOKHURST ST, ANAHEIM, CA 92804
Legal Description: P BK 35 PG 41 PAR 1 PM 35-41 PAR 1 & 2 AND PM 18-3
APN: 12726140
Project Description: Tenant Improvement: Replacement of refrigeration equipment in mechanical room on mezzanine, installation of new
floor sink on mezzanine, replace (2) roof top condenser units.
Living Area: Number of Stories: 1 Valuation:
Garage Area: Construction Types:
Carport Area: Occupancy Groups:
Balcony I Deck Area. Fire Sprinklered
Cool Roof. Total Faris paid for primih:
110.000.00
NIA
Yes
2,361.80
People Associated with Project:
Contractor
R S V C COMPANY P O BOX 7189 RIVERSIDE, CA 92513
Permit Applicant
Anahuac Lopez
Owner
PK It BROOKHURST CENTER LP 3333 NEW HYDE PARK RD 100
Type Electrical Fixtures
Qty Type Plumbing Fixtures Oty
Conduit and Conductors - per 50 ft.
2 Floor Sink 1
Receptacle, switches, lights
10 Gas System (outlets) 1
Sub Panel/Temp Pwr - Over 600 V, over
1
1000 amps to 2500 amps
Sub PanelfTemp Pwr - Under 600 V. over
1
1000 amps
Mechanical Fixtures Oty
Commercial System per 1,000 sq. ft. 2
Evaporative or Air Cooled Condenser 2
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit issuance. A new permit is required to commence or continue work.
City of Anaheim P�f0i ��`
D4 iO
Building Division F y
U >
FC"NDED lea
Do not occupy this buildina until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION
DATE
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applcable items have been signed
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus, Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
not install subfloor or pour floor slab until the follwing applicable items have beet
signed
Building Final (714 765-5153)
-'. Inspection -Final Only After Above Completed -
Plumbing (GroundfUnderfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing Only after Plbg Ele Mec. & Fire) 1 .,lip
��//
Insulation (Sound/Energy)
=:t tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days afte, approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service