Loading...
915 S BROOKHURST ST (12)Permit Types BLt: ELE MEC PLM X X X Permit Number: BLD2022-03128 Issued: 0511712023 www.anahejm.nel/building (714)765<626 Quarter Section: 34 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 51 ` Site Address: 915 S BROOKHURST ST, ANAHEIM, CA 92804 Legal Description: P BK 35 PG 41 PAR 1 PM 35-41 PAR 1 & 2 AND PM 18-3 APN: 12726140 Project Description: Tenant Improvement: Replacement of refrigeration equipment in mechanical room on mezzanine, installation of new floor sink on mezzanine, replace (2) roof top condenser units. Living Area: Number of Stories: 1 Valuation: Garage Area: Construction Types: Carport Area: Occupancy Groups: Balcony I Deck Area. Fire Sprinklered Cool Roof. Total Faris paid for primih: 110.000.00 NIA Yes 2,361.80 People Associated with Project: Contractor R S V C COMPANY P O BOX 7189 RIVERSIDE, CA 92513 Permit Applicant Anahuac Lopez Owner PK It BROOKHURST CENTER LP 3333 NEW HYDE PARK RD 100 Type Electrical Fixtures Qty Type Plumbing Fixtures Oty Conduit and Conductors - per 50 ft. 2 Floor Sink 1 Receptacle, switches, lights 10 Gas System (outlets) 1 Sub Panel/Temp Pwr - Over 600 V, over 1 1000 amps to 2500 amps Sub PanelfTemp Pwr - Under 600 V. over 1 1000 amps Mechanical Fixtures Oty Commercial System per 1,000 sq. ft. 2 Evaporative or Air Cooled Condenser 2 The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. City of Anaheim P�f0i ��` D4 iO Building Division F y U > FC"NDED lea Do not occupy this buildina until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION DATE INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applcable items have been signed Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus, Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures not install subfloor or pour floor slab until the follwing applicable items have beet signed Building Final (714 765-5153) -'. Inspection -Final Only After Above Completed - Plumbing (GroundfUnderfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing Only after Plbg Ele Mec. & Fire) 1 .,lip ��// Insulation (Sound/Energy) =:t tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days afte, approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service